Labour Day Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 2493360325

Good News !!! PK0-004 CompTIA Project + is now Stable and With Pass Result

PK0-004 Practice Exam Questions and Answers

CompTIA Project +

Last Update 2 days ago
Total Questions : 796

PK0-004 is stable now with all latest exam questions are added 2 days ago. Just download our Full package and start your journey with CompTIA Project + certification. All these CompTIA PK0-004 practice exam questions are real and verified by our Experts in the related industry fields.

PK0-004 PDF

PK0-004 PDF (Printable)
$48
$119.99

PK0-004 Testing Engine

PK0-004 PDF (Printable)
$56
$139.99

PK0-004 PDF + Testing Engine

PK0-004 PDF (Printable)
$70.8
$176.99
Question # 1

Two team members completely disagree on how to complete a specific task. The project manager observes the conflict but takes no immediate action.

Which of the following techniques is the project manager using?

Options:

A.  

Compromising

B.  

Smoothing

C.  

Withdrawing

D.  

Accepting

Discussion 0
Question # 2

A project has fallen behind schedule. Upon investigation, the project manager determines that team members have implemented requirements relayed via impromptu hallway meetings with the client.

Which of the following should the project manager do to resolve this issue?

Options:

A.  

Update the scope management plan.

B.  

Modify the project baselines.

C.  

Implement change control management.

D.  

Inform the stakeholders of the issue.

Discussion 0
Question # 3

The project team is distributed throughout a single country. The scrum master has decided to hold remote "stand-ups" on a daily basis. Which of the following would be the MOST effective means to do this?

Options:

A.  

Instant messaging

B.  

Video conference

C.  

Phone call

D.  

Collaboration website

Discussion 0
Question # 4

A project is taking more effort than anticipated. Which of the following constraints will MOST likely be affected?

Options:

A.  

Scope

B.  

Time

C.  

Quality

D.  

Cost

Discussion 0
Question # 5

One deliverable failed during testing, and this has already happened several times.

Which of the following tools is MOST appropriate for the project team to use to determine the cause of the problem?

Options:

A.  

Run chart

B.  

Fishbone diagram

C.  

Scatter diagram

D.  

Gantt chart

Discussion 0
Question # 6

If a project sponsor wants to know the current status and progress of a project, which of the following is the BEST approach to find this information?

Options:

A.  

The project sponsor should obtain the current status from team members, put it into a presentation, and present it to the project manager for review.

B.  

The scheduler should obtain the current status from team members, apply it to the baseline of the schedule, and run a report.

C.  

The scheduler should obtain the current status from team members, update the project charter, project management plan, dashboard, and SOW, and then create a status report to provide to the project manager.

D.  

The scheduler should obtain the current status from team members, update the risk register, and provide the information to the project champion for review.

Discussion 0
Question # 7

Which of the following events would MOST likely trigger communications to the largest audience for a given organization?

Options:

A.  

Business continuity response

B.  

Quality audit

C.  

Replacement of a subcontractor

D.  

Completion of a task

Discussion 0
Question # 8

A project manager does not have enough time to complete several tasks on a critical path. The budget is a low concern. Which of the following should be used to complete the tasks on time?

Options:

A.  

Fast-track the tasks.

B.  

Utilize positive float.

C.  

Crash the schedule.

D.  

Remove the critical path

Discussion 0
Question # 9

A stakeholder is unaware of a project’s status.

Which of the following documents should the project manager consult to ensure all stakeholders are notified of project changes? (Choose two.)

Options:

A.  

Status report

B.  

Organizational chart

C.  

RACI matrix

D.  

Meeting minutes

E.  

Communication plan

Discussion 0
Question # 10

A project manager is creating the monthly report for top management. The project manager has collected the information below:

AC = 100

PV = 80

EV = 120

Based on this information, the CPI reflects which of the following about the project?

Options:

A.  

It is under budget.

B.  

It is over budget.

C.  

It is ahead of schedule.

D.  

It is behind schedule.

Discussion 0
Question # 11

A project’s key stakeholders have requested significant changes that will affect the scope. To adjust the project scope, which of the following need to be changed? (Choose two.)

Options:

A.  

Cost performance parameter

B.  

Project schedule

C.  

KPI

D.  

Corrective action plan

E.  

WBS

Discussion 0
Question # 12

The PM is preparing for the planning phase kickoff meeting. It is imperative for the team to focus during the meeting on the expected outcomes.

Which of the following best describes what the PM should work on FIRST?

Options:

A.  

Project charter

B.  

Project schedule

C.  

Meeting agenda

D.  

Responsibility assignment matrix

E.  

Risk register

Discussion 0
Question # 13

At a weekly project team meeting, it is apparent the project is over budget. The project manager needs to determine the reason for this issue. Which of the following documents should MOST likely be analyzed to obtain the answer?

Options:

A.  

Project charter, organization chart, scope statement, and issue log

B.  

Dashboard information, action items, project schedule, and status report

C.  

Project management plan, scope statement, communication plan, and meeting agendas

D.  

Project schedule, project management plan, communication plan, and issue log

Discussion 0
Question # 14

A project manager was directed to complete a project sooner than previously planned. Which of the following is the MOST cost-effective step to take to ensure the project’s success?

Options:

A.  

Reduce the scope

B.  

Increase the budget

C.  

Decrease staff

D.  

Update the WBS

Discussion 0
Question # 15

A senior manager asks a project manager for an estimated budget on a new project.

Which of the following is the BEST step for the project manager to take?

Options:

A.  

Tell the senior manager the estimation is not available yet.

B.  

Use the budget from a similar project to generate estimates.

C.  

Ask a SME for an opinion and propose an estimate.

D.  

Gather the team to immediately generate estimates.

Discussion 0
Question # 16

The project manager was asked to provide recommendations for the removal of a vendor. A meeting was scheduled with the key stakeholders and the project sponsor to highlight the reasons for this recommendation.

Which of the following should the project manager bring to the meeting to support this recommendation? (Choose two.)

Options:

A.  

The issue log to show why the vendor should be replaced.

B.  

The team action items to show why the vendor should be replaced.

C.  

The scope statement to show why the vendor should be replaced.

D.  

A procurement plan to show why the vendor should be replaced.

E.  

A change management plan to have the vendor replaced.

Discussion 0
Question # 17

A program manager informs a project manager that a new, high-priority project has been approved and will need the current project’s resources before the scheduled project close date. The project team meets and determines that the project should be fast-tracked.

Which of the following documents should the project team reference to fast-track the project? (Choose two.)

Options:

A.  

Scope management plan

B.  

Configuration management plan

C.  

Network diagram

D.  

Project schedule

E.  

Project plan

Discussion 0
Question # 18

A project manager has an opportunity to add a highly skilled expert to the team who can increase the probability of the project’s success.

Which of the following risk strategies should the project manager adopt?

Options:

A.  

Exploitation

B.  

Avoidance

C.  

Acceptance

D.  

Mitigation

Discussion 0
Question # 19

A project manager is managing a transactional project. One of the key team members is having difficulties understanding the client requirements.

Which of the following actions would be BEST for the project manager to take?

Options:

A.  

Ask the client to provide additional language resources to the team.

B.  

Purchase a language translation program.

C.  

Hire a translator to help the key team member

D.  

Ask the client to provide requirements in the native language of the team.

Discussion 0
Question # 20

A customer asks a project manager if a small change can be made during the delivery phase. The project manager does not agree to the change.

Which of the following is the MOST likely reason?

Options:

A.  

Established communication plan

B.  

Scope creep

C.  

Resource constraints

D.  

Iterative approach

Discussion 0
Question # 21

A company decides to give a large section of its development project to another firm to manage and complete because that firm has the appropriately skilled resources to execute the work. This approach is referred to as:

Options:

A.  

Resource leveling

B.  

Staff Augmentation

C.  

Work relocation

D.  

Outsourcing

Discussion 0
Question # 22

A project manager is attempting to establish the proper sequencing and duration of project activities.

Which of the following would be the MOST beneficial?

Options:

A.  

Network diagram

B.  

Ishikawa diagram

C.  

WBS

D.  

Gantt chart

Discussion 0
Question # 23

Which of the following risk strategies is represented by the purchase of insurance?

Options:

A.  

Mitigate

B.  

Accept

C.  

Transfer

D.  

Avoid

Discussion 0
Question # 24

A project manager travels abroad to meet the offshore team and sends out a meeting invitation to review requirements. However, many team members decline the meeting invitation. The PM approaches one team member to determine why people are declining. The team member indicates the project manager scheduled the meeting at a time when employees typically have permission to take a nap. Which of the following is the project manager facing?

Options:

A.  

Language barriers

B.  

Time zones

C.  

Cultural differences

D.  

Personal preferences

Discussion 0
Question # 25

In which of the following organizational structures would a project manager have the MOST authority?

Options:

A.  

Projectized

B.  

Strong matrix

C.  

Balanced matrix

D.  

Functional

Discussion 0
Question # 26

A project manager who is part of a global team wants to have a team building meeting and decides to hold a video conference.

Which of the following is MOST likely to be the main challenge the influences this decision?

Options:

A.  

Geographical factors

B.  

Language barriers

C.  

Cultural differences

D.  

Technology factors

Discussion 0
Question # 27

A non-stakeholder approaches the project manager and asks if certain items can be added to a project that was started two months earlier. Which of the following constraints does this impact MOST?

Options:

A.  

Time

B.  

Schedule

C.  

Scope

D.  

Cost

Discussion 0
Question # 28

During a project assessment, a project manager determines the initial project cost estimates were incorrect, and there is not enough budget left, including reserves, to complete the project.

Which of the following actions should the project manager take?

Options:

A.  

Alert the project sponsor of the situation.

B.  

Contact the customer and request more funding.

C.  

Announce the project will end early due to lack of funds.

D.  

Attempt to save money in downstream activities.

Discussion 0
Question # 29

A project team is mainly based in a metropolitan area. The team also has members in a remote area, where Internet access is limited and unstable.

Which of the following factors will MOST likely influence the communication methods used in the project?

Options:

A.  

Personal preferences

B.  

Technological factors

C.  

Language barriers

D.  

Cultural differences

Discussion 0
Question # 30

A project manager is justifying a required change with the associated impact on the project.

Which of the following is the NEXT step?

Options:

A.  

Implementation

B.  

Approval

C.  

Validation

D.  

Auditing

Discussion 0
Question # 31

A project team added a new member who has proprietary information about a competitor's product. The team member was suddenly removed from the project. Which of the following MOST likely occurred?

Options:

A.  

The company received a C&

D.  

B.  

A higher-priority project needed the expertise.

C.  

The new member did not sign an ND

A.  

D.  

An SLA prevented new team members.

Discussion 0
Question # 32

Team members have reported poor sound quality during critical, time-sensitive conference calls. Which of the following may be a more effective means of communication?

Options:

A.  

One-on-one meetings

B.  

Project wiki

C.  

Text messages

D.  

Social media

Discussion 0
Question # 33

A project manager is informed that a team member would like to enhance the code with an additional function. Which of the following should the project manager do NEXT?

Options:

A.  

Submit a change request.

B.  

Evaluate the impact of the change.

C.  

Get approval from the CC

B.  

D.  

Communicate the change to stakeholders.

Discussion 0
Question # 34

A project manager is assigned to a new project that must start immediately. No formal or approved documents have been authored for the project. The project manager must identify project roles, justify the business need, and determine project scope boundaries.

Which of the following documents should the project manager create?

Options:

A.  

Business case

B.  

Project charter

C.  

Scope statement

D.  

Project management plan

Discussion 0
Question # 35

A customer has requested additional features for an active project.

Which of the following steps should take place NEXT?

Options:

A.  

Implement the requested changes.

B.  

Evaluate the impact of the changes.

C.  

Update all project documents.

D.  

Submit the requested changes to the CC

B.  

Discussion 0
Question # 36

Which of the following job roles is primarily tasked with communicating the project timeline changes?

Options:

A.  

Project scheduler

B.  

Project manager

C.  

Project sponsor

D.  

Project coordinator

Discussion 0
Question # 37

A project team has purchased computers with warranties extending throughout the entire project. Which of the following represents the risk strategy utilized?

Options:

A.  

Transfer

B.  

Share

C.  

Mitigate

D.  

Avoid

Discussion 0
Question # 38

A governance committee has just approved a new project. The project scheduler is now developing the project schedule. Which of the following activities should be done FIRST?

Options:

A.  

Add durations.

B.  

Add the start and finish dates

C.  

Add tasks.

D.  

Add resources.

Discussion 0
Question # 39

The project manager has noticed a vendor is not performing in accordance with the SL

A.  

Which of the following items should the project manager use to highlight the vendor’s areas of poor performance?

Options:

A.  

Balanced score card

B.  

WBS

C.  

Post-project evaluation

D.  

PERT

Discussion 0
Question # 40

Which of the following documents does a vendor rely on MOST before committing funding and resources to a project?

Options:

A.  

SOW

B.  

PO

C.  

SLA

D.  

MOU

Discussion 0
Question # 41

A project manager is mapping qualifications and available personnel to the project requirements. Which of the following activities is the project manager completing?

Options:

A.  

Team Building

B.  

Team Selection

C.  

Resource loading

D.  

Resource leveling

Discussion 0
Question # 42

A daily standup Scrum meeting is BEST accomplished in a:

Options:

A.  

telephone conference.

B.  

group email.

C.  

face-to-face meeting.

D.  

video conference.

Discussion 0
Question # 43

Based on the table below:

Question # 43

Which of the following is the total float for the critical path?

Options:

A.  

0

B.  

1

C.  

2

D.  

3

Discussion 0
Question # 44

A team member has reported Task 3 will be completed ahead of schedule.

Question # 44

Using the given chart, which of the following represents the critical path if Task 3 is completed in two days?

Options:

A.  

8 days

B.  

10 days

C.  

11 days

D.  

12 days

Discussion 0
Question # 45

Severe weather has impacted a construction project, delaying scheduled work for five days. Which of the

following project changes is the project manager most likely to consider FIRST?

Options:

A.  

Requirements change

B.  

Funding change

C.  

Timeline change

D.  

Risk event

Discussion 0
Question # 46

A primary work location is unsafe due to a gas leak. The project manager has implemented the business continuity plan and authorized relocation to an alternate site.

Which of the following should be notified?

Options:

A.  

Sponsor

B.  

PMO

C.  

Affected team members

D.  

Project team

Discussion 0
Question # 47

Before a team can start on a sprint, they will need to:

Options:

A.  

create a set of iterations to work on and prioritize.

B.  

generate an icebox of work items to review.

C.  

review the backlog of work items to prioritize.

D.  

take client requirements and draft them into a task list.

Discussion 0
Question # 48

Which of the following documents is typically signed by the vendor and includes a reference for how customers’ internal information will be protected?

Options:

A.  

MOU

B.  

NDA

C.  

SOW

D.  

SLA

Discussion 0
Question # 49

A client has provided a list of deliverables to include in the project scope. Which of the following will allow the project team to ensure all deliverables are included in the final product while managing scope creep?

Options:

A.  

Requirements traceability matrix

B.  

Gantt chart

C.  

SWOT analysis

D.  

Project charter

Discussion 0
Question # 50

Which of the following conflict resolution techniques relies on establishing areas of agreement rather than disagreement?

Options:

A.  

Smoothing

B.  

Collaborating

C.  

Compromising

D.  

Avoiding

Discussion 0
Question # 51

The PM has requested that a project repository be developed. Sensitive information will be available on the

site that could affect the project’s success. Only personnel who need to know the information will have access.

Which of the following site types is the PM requesting?

Options:

A.  

Wiki page

B.  

Intranet

C.  

Extranet

D.  

Internet

E.  

Knowledge base

Discussion 0
Question # 52

Which of the following primary factors are used to prioritize the development of risk response strategies?

(Choose two.)

Options:

A.  

Likelihood

B.  

Timeline

C.  

Impact

D.  

Quality

E.  

Cost

Discussion 0
Question # 53

One of the tasks on a project’s critical path is progressing too slowly. The team member who is responsible for completing the task is assigned to multiple projects with aggressive deadlines.

Which of the following roles has the responsibility of resolving the issue?

Options:

A.  

CCB

B.  

PMO

C.  

Project sponsor

D.  

Project scheduler

Discussion 0
Question # 54

The design activity of a project has the following cost attributes:

PV = 100,000

EV = 20,000

AC = 90,000

Based on this scenario, calculate the schedule variance.

Options:

A.  

-80,000

B.  

-70,000

C.  

10,000

D.  

120,000

Discussion 0
Question # 55

An organization needs a vendor to provide a solution. The organization can only describe its goals but not how to accomplish the work.

Which of the following types of procurement should be used?

Options:

A.  

Request for information

B.  

Request for quote

C.  

Request for bid

D.  

Request for proposal

Discussion 0
Question # 56

Which of the following activity sequencing techniques uses nodes to symbolize activities and arrows to show how their dependencies are connected?

Options:

A.  

Critical Path Method

B.  

Arrow Diagramming Method

C.  

Critical Chain Method

D.  

Precedence Diagramming Method

Discussion 0
Question # 57

An employee is assigned to a project and is developing a project charter. Which of the following are some of

the constraints the employee would typically face at this stage of the project?

Options:

A.  

Environment, resources, requirements, and quality

B.  

Budget, quality, resources, and schedule

C.  

Deliverables, scope, and budget environment

D.  

Budget, scope, quality, and schedule

Discussion 0
Question # 58

A project manager wants to ensure that a detailed overview of a new kitchen fits the client’s standards. Which of the following will the project manager MOST likely work to accomplish?

Options:

A.  

Detailed project schedule to deliver on time

B.  

Gate reviews to capture the progress and feedback

C.  

Reasonable number of changes to maintain quality

D.  

Wide range of time between the start and end of the installation

Discussion 0
Question # 59

Which of the following features describe a projectized organization? (Select two.)

Options:

A.  

The project manager has less authority over the project team than in a strong matrix.

B.  

Team members are solely dedicated to project activities.

C.  

The functional manager has full authority over the project team members.

D.  

The project manager has full authority over the project team members.

E.  

Team members from various departments are assigned to the project.

Discussion 0
Question # 60

Which of the following project phases occurs when requirements are detailed?

Options:

A.  

Initiation

B.  

Monitor and control

C.  

Planning

D.  

Closing

Discussion 0
Question # 61

Given the information in the table below, which of the following is the total project cost?

Question # 61

Options:

A.  

$40,000

B.  

$70,000

C.  

$95,000

D.  

$120,000

Discussion 0
Question # 62

Which of the following is the MOST appropriate communication method for a highly confidential message to a Multilanguage global project team?

Options:

A.  

Encrypted email

B.  

Face-to-face communication with a translator

C.  

Social media communication through a secure connection

D.  

Voice conferencing

Discussion 0
Question # 63

The Chief Executive Officer (CEO) has changed the direction of a business and no longer needs one of the

divisions. A deal is reached to sell the division to a company in another state. Which of the following BEST

describes this type of organizational change?

Options:

A.  

Business process change

B.  

Internal reorganization

C.  

Relocation

D.  

Demerger

Discussion 0
Question # 64

Tasks B and D start after Task A is completed. Task C starts after Tasks B and D are completed. task E starts after Task D is completed. Task H starts after task B is completed. Task G starts after Tasks C and H are completed. Task F starts after Task E is completed.

Following are the durations of all tasks:

Task Duration

A) Four weeks

B) Two weeks

C) Six weeks

D) Three weeks

E) Seven weeks

F) One week

G) Two weeks

H) Nine weeks

Which of the following tasks are on the critical path?

Options:

A.  

A, D, C, G

B.  

A, B, H, G

C.  

A, D, E, F

D.  

A, B, C, G

Discussion 0
Question # 65

A project manager is assigned to a project that was previously managed by a peer project manager. The

project manager identifies several modifications that were deployed prior to CCB approval. Which of the

following change control processes is being mismanaged?

Options:

A.  

Change validation with quality checks

B.  

Regression planning

C.  

Identify approval authority

D.  

Change implementation

Discussion 0
Question # 66

Upper management asks a project sponsor to provide several ad hoc reports as a brief overview of the project’s current status.

Which of the following types of reports should the project sponsor use to quickly summarize the status report data?

Options:

A.  

Pie chart

B.  

Run chart

C.  

Project schedule

D.  

Dashboard information

Discussion 0
Question # 67

A project sponsor has requested documentation to determine the scheduled activities for a project that is

running behind schedule. Which of the following documents should the project manager send to the sponsor to

quickly identify the project activities?

Options:

A.  

RACI

B.  

SWOT

C.  

SOW

D.  

WBS

Discussion 0
Question # 68

Which of the following resources outlines consequences of non-performance?

Options:

A.  

Project sponsor

B.  

Project team

C.  

Customer

D.  

Project management office

Discussion 0
Question # 69

Resources for a project report to a project manager and a functional manager.

The organizational structure is:

Options:

A.  

Matrix

B.  

Ad hoc

C.  

Functional

D.  

Projectized

Discussion 0
Question # 70

Project status meetings have poor attendance. A SME from the hardware team dominates the meetings when questions are asked, not allowing input from other members.

Which of the following steps should the PM take to make the meetings more productive? (Select two.)

Options:

A.  

Facilitate the meetings by adhering to the agenda.

B.  

Encourage interaction among team members during the meetings.

C.  

Ensure meetings minutes are accurately recorded.

D.  

Adjust the number of meetings.

E.  

Change the number of action items.

F.  

Schedule impromptu meetings when the SME is absent.

Discussion 0
Question # 71

Which of the following tools would a project manager use to determine the root cause of an issue?

Options:

A.  

Pareto Chart

B.  

Ishikawa Diagram

C.  

Histogram

D.  

Monte Carlo Analysis

Discussion 0
Question # 72

Two companies have merged. Which of the following may impact the project manager’s communication methods after the merger?

Options:

A.  

Updates to issues logs

B.  

Increase in change requests

C.  

Changes to stakeholder requirements

D.  

Updates to the WBS

Discussion 0
Question # 73

A PM is asked to keep the Chief Information Officer (CIO) informed of a project’s health at a high level on a

daily basis. Which of the following is the BEST way for the PM to provide this information?

Options:

A.  

Status report

B.  

Meeting minutes

C.  

Dashboard

D.  

Email

Discussion 0
Question # 74

A project encountered a problem and reached a milestone. In which of the following documents will the stakeholders MOST likely find information on these events?

Options:

A.  

Issues log

B.  

Change log

C.  

Status report

D.  

Meeting minutes

Discussion 0
Question # 75

A PM is reviewing bids from vendors and has a question.

Which of the following documents should the PM use to obtain a response?

Options:

A.  

Project schedule

B.  

RFP

C.  

Quotation

D.  

RFI

Discussion 0
Question # 76

In which of the following situations is a project manager MOST likely to use a process diagram?

Options:

A.  

When describing a new business idea for the team to review

B.  

When describing a new business workflow for the team to implement

C.  

When describing a new business project for the team to implement

D.  

When describing a new business acquisition for the team to review

Discussion 0
Question # 77

A project manager has been experiencing resistance from a group of stakeholders.

With which of the following should the project manager consult to reduce friction going forward?

Options:

A.  

Project scheduler

B.  

Project coordinator

C.  

Project sponsor

D.  

Project management office

Discussion 0
Question # 78

A new project manager is working in an environment where resources report to another supervisor. The

project manager is having difficulty with a particular member and wants to escalate the issue. Which of the

following documents should the project manager consult?

Options:

A.  

Issue log

B.  

RACI chart

C.  

Risk management plan

D.  

Organizational chart

Discussion 0
Question # 79

A project team is defining detailed risks. Which of the following project phases is taking place?

Options:

A.  

Initiation

B.  

Monitor and control

C.  

Execution

D.  

Planning

Discussion 0
Question # 80

Which of the following documents will provide the MOST detailed information regarding the work a vendor will

perform during a project?

Options:

A.  

RFI

B.  

SLA

C.  

SOW

D.  

PO

Discussion 0
Question # 81

Which of the following would MOST likely trigger a business continuity response?

Options:

A.  

If the metrics within an SLA are not met, resulting in penalty payments to a customer

B.  

If a project milestone that is critical to delivering a new product on time is not achieved as scheduled

C.  

If unauthorized personnel receive confidential communications

D.  

If electrical services are interrupted at the primary datacenter

Discussion 0
Question # 82

Two highly skilled resources, who are currently working on other projects, are assigned to a project manager. Personality conflicts between the two resources have adversely affected project completion. The project

manager has asked a manager with direct authority over the resources to provide input to resolve the issue, but the project manager does not have the level of authority required to resolve the personality conflict.

Which of the following structure types is this an example of?

Options:

A.  

Strong matrix

B.  

Balanced matrix

C.  

Functional

D.  

Weak matrix

E.  

Projectized

Discussion 0
Question # 83

A project task has been completed ahead of schedule. Which of the following is the MOST appropriate next step?

Options:

A.  

Provide the next task to the newly freed resource.

B.  

Communicate the success to the team.

C.  

Notify the project sponsor of the new completion date.

D.  

Update the schedule and add lag to the next task.

Discussion 0
Question # 84

A project manager presented the project risk plan to the project sponsor, and the project sponsor decided to cancel the project. Which of the following is the MOST likely reason for canceling the project?

Options:

A.  

Incomplete risk plan

B.  

No defined risk-related responsibilities

C.  

Unacceptable overall level of risks

D.  

Too many risks on the plan

Discussion 0
Question # 85

Which of the following charts would indicate the cause and effect of tasks in a project, and for which of the following activities would the chart be used?

Options:

A.  

Histogram, forecasting

B.  

Ishikawa, quality control

C.  

Scatter, determining resources

D.  

Gantt, leveraging resources

Discussion 0
Question # 86

A project has just begun, and people are not clear about the objectives.

Which of the following meeting types is needed?

Options:

A.  

Stand-up

B.  

Scheduling

C.  

Impromptu

D.  

Kickoff

Discussion 0
Question # 87

Deliverables are repeatedly delivered late by one project team. The project manager has consulted with the functional manager but has not been able to make progress on the expectations. Which of the following would BEST help the project manager to communicate the continued issue?

Options:

A.  

Communication plan

B.  

Scope document

C.  

Status report

D.  

RACI matrix

Discussion 0
Question # 88

A team shares authority between functional managers and project managers. The project manager's authority ranges from weak to strong. Which of the following organizational structures is described?

Options:

A.  

Matrix

B.  

Projectized

C.  

Functional

D.  

Hybrid

Discussion 0
Question # 89

Tasks A, B, and C have a duration of two days. Task D has a duration of three days, and Task E has duration of four days. Task A starts on Day 1, and Task B starts on Day 2. Task C starts after Task

A.  

Tasks D and E start after Task

C.  

Which of the following is the critical path if Task B starts on Day 3?

Options:

A.  

A, C, D

B.  

A, C, E

C.  

A, D, E

D.  

B, C, E

Discussion 0
Question # 90

Which of the following is a component of the project cost control?

Options:

A.  

Scope statement

B.  

Burn rate

C.  

MOU

D.  

SLA

Discussion 0
Question # 91

Given the following:

Question # 91

Which of the following is the duration of the critical path?

Options:

A.  

35 days

B.  

37 days

C.  

38 days

D.  

72 days

E.  

73 days

Discussion 0
Question # 92

A project sponsor wants to know which tasks are next in the project but is unable to find this information.

Which of the following may need to be adjusted?

Options:

A.  

Scope document

B.  

Status report

C.  

Issue log

D.  

Risk log

Discussion 0
Question # 93

A project needs to know if a project is progressing as planned. Which of the following tools would be BEST to measure progress?

Options:

A.  

Histogram

B.  

KPI

C.  

Pareto chart

D.  

RACI matrix

E.  

CPM

Discussion 0
Question # 94

A project manager detects low performance from a team member who previously demonstrated to be a highly

skilled asset. The team member explains that being part of two teams is too time consuming. This is a disadvantage of having:

Options:

A.  

dedicated resources.

B.  

interproject dependencies.

C.  

resource overallocation.

D.  

shared resources.

Discussion 0
Question # 95

Which of the following is the BEST reason to use a burndown chart?

Options:

A.  

To determine how much risk is still associated with the project

B.  

To predict when project work will be completed

C.  

To establish a backlog for project deliverables

D.  

To create a project charter

Discussion 0
Question # 96

A hurricane occurs in an area where several key project resources are located. When reviewing the project dashboard, the project sponsor sees the project is behind schedule and asks the project manager for an explanation. Which of the following documents should the project manager examine NEXT to provide an explanation?

Options:

A.  

Meeting minutes

B.  

Issue log

C.  

Project schedule

D.  

Budget

Discussion 0
Question # 97

A project must be:

Options:

A.  

continuous.

B.  

budgeted.

C.  

unique.

D.  

complex.

Discussion 0
Question # 98

Which of the following documents would a project manager utilize to find a vendor for an undefined project?

Options:

A.  

RFP

B.  

RFI

C.  

RFQ

D.  

SOW

Discussion 0
Question # 99

Project team members have stated that they are having difficulty reaching the newly available corporate resources, and any response comes at unusual hours. Which of the following is MOST likely the cause?

Options:

A.  

Merger

B.  

Relocation

C.  

Offshoring

D.  

Outsourcing

Discussion 0
Question # 100

Which of the following is the BEST indicator of project failure?

Options:

A.  

Product deficiencies revealed during the monitor and control phase

B.  

Project team members disagreeing on milestones

C.  

Project deliverables completed behind schedule

D.  

Several changes being made to the project

Discussion 0
Question # 101

A project manager needs to determine resource availability to assign the resources to project tasks.

Which of the following will the project manager MOST likely use?

Options:

A.  

Resource calendars

B.  

Project calendar

C.  

Staffing management plan

D.  

Conflict resolution

Discussion 0
Question # 102

A customer added an additional requirement for a product being developed. Which of the following should the project manager do FIRST?

Options:

A.  

Present the change request to the CA

B.  

B.  

Evaluate the change with the project team.

C.  

Set up a face-to-face meeting with the project sponsor

D.  

Organize a steering committee meeting.

Discussion 0
Question # 103

A new project manager would benefit from additional assistance with documenting project activities.

Which of the following job positions should the project manager request be added to the team?

Options:

A.  

Business analyst

B.  

Project scheduler

C.  

Quality control analyst

D.  

Project coordinator

Discussion 0
Question # 104

A project manager notices a lack of meeting attendance from the project team. Which of the following actions might the project manager take to BEST improve the level of attendance?

Options:

A.  

Schedule the meeting directly on the attendees’ calendars.

B.  

Publish an agenda prior to the meeting.

C.  

Increase the number of email invitations for the upcoming meeting.

D.  

Send the meeting invitation by email with a read receipt.

Discussion 0
Question # 105

Which of the following events would MOST likely merit immediate communication to all project stakeholders? (Choose two.)

Options:

A.  

Business continuity response

B.  

Milestone achievement

C.  

Incident response

D.  

Schedule change

E.  

Change request

F.  

Stakeholder changes

Discussion 0
Question # 106

The problem statement of a project helps to identify:

Options:

A.  

roadblocks impeding project progress

B.  

a connection to a larger program

C.  

a reason or purpose

D.  

start and end dates

Discussion 0
Question # 107

Joe, a project team member, was hired after a project was already underway, and he is the only team member who does not have an office. Ann, the project manager, is aware of Joe’s resentment and the impact he is having on the project environment. Ann decides to give Joe her office and relocates to a shared work space. This is an example of:

Options:

A.  

avoiding

B.  

confronting

C.  

negotiating

D.  

smoothing

Discussion 0
Question # 108

A project manager realizes there is a significant risk event. Which of the following is the FIRST step the project manager should perform?

Options:

A.  

Escalate the issue to the sponsor

B.  

Assign an owner to take action

C.  

Update the issue log

D.  

Activate the contingency plan

Discussion 0
Question # 109

In a weak matrix, a highly skilled project team member has been using company equipment to view inappropriate content. Which of the following steps should the project manager take FIRST to address this issue?

Options:

A.  

Send an email outlining the company’s acceptable use policy to the employee.

B.  

Arrange a face-to-face meeting with the team member.

C.  

Contact the team member’s manager to address the problem.

D.  

Restrict the team member’s equipment access.

Discussion 0
Question # 110

Based on the table below:

Question # 110

Which of the following is the critical path?

Options:

A.  

A, C, F, G, J, K, L, M

B.  

A, C, D, E, H, I, L, M

C.  

B, C, F, G, J, K, L, M

D.  

B, C, D, E, H, I, L, M

Discussion 0
Question # 111

Ann, a project manager, witnesses Joe, a team member raise his voice to another team member. Ann calls Joe into a private office and tells him that he will be removed from the project if this situation occurs again. Which of the following conflict resolution approaches is this an example of?

Options:

A.  

Avoiding

B.  

Forcing

C.  

Negotiating

D.  

Confronting

Discussion 0
Question # 112

As part of the early stages of a potential corporate acquisition, which of the following documents should the acquiring organization complete, showing regulators and investors the offered purchase price and target

closing date?

Options:

A.  

Sales contract

B.  

Memorandum of agreement

C.  

Letter of intent

D.  

Purchase order

Discussion 0
Question # 113

A recent change request was implemented with approval; however, it had an unforeseen negative impact on the critical path. Which of the following measures should be taken to ensure the project is not delayed?

Options:

A.  

Evaluate the impact of the change.

B.  

Execute the regression plan.

C.  

Identify and document the root cause of the issue,

D.  

Validate the change was quality checked.

Discussion 0
Question # 114

Due to an overabundance of project issues reported at status meetings, a project manager wants to purchase a ticketing system to help manage the issues and impacts to the project.

Which of the following describes the information the new ticketing system would provide?

Options:

A.  

RTM

B.  

KPIs

C.  

BAC

D.  

ETC

Discussion 0
Question # 115

A project manager, who is overseeing a project in a functional environment, lost two project team members to other projects. The project manager does not anticipate getting any replacements for the remaining duration of the project. Which of the following would be the BEST solution to meet the project's timeline?

Options:

A.  

Announce to project team members they will crash the project.

B.  

Work with stakeholders to reduce deliverable quality.

C.  

Inform the organization's management there will be a delivery delay.

D.  

Negotiate with the project sponsor to reduce the scope of the project

Discussion 0
Question # 116

A project sponsor promises the Chief Executive Officer (CEO) that a project will be completed before the next quarterly meeting. The project manager needs to take the following elements into account:

  • Delivery
  • Vacation
  • Cost of overtime
  • Work effort

Which of the following documents should the project manager use to guarantee the project’s success?

Options:

A.  

RACI

B.  

Schedule

C.  

Project charter

D.  

SWOT

E.  

Burn chart

Discussion 0
Question # 117

A busy project manager has a diverse set of stakeholders and team members with respect to age and cultural background. Which of the following is the BEST method for communicating to the project manager’s audiences?

Options:

A.  

Speak with each individual, and communicate with that individual according to stated and demonstrated preferences

B.  

Utilize a variety of communication methods, such as email, IM, conference calls, and face-to-face meetings, to reach all the audiences

C.  

Develop a communications plan that considers the individual’s impact on the project and preferred communication method

D.  

Determine a single best communication method to provide efficient and consistent communications to all the audiences

Discussion 0
Question # 118

The project manager for a multinational project is evaluating the option of scheduling face quick responses to issues. Which of the following strategies is being applied?

Options:

A.  

Risk acceptance

B.  

Risk avoidance

C.  

Risk transference

D.  

Risk mitigation

Discussion 0
Question # 119

A project manager has laid out a network diagram and is beginning to schedule activities for an upcoming project. Which of the following activities should be performed LAST?

Options:

A.  

Determine the start/finish dates.

B.  

Determine the critical path.

C.  

Determine the dependencies.

D.  

Determine the task durations.

Discussion 0
Get PK0-004 dumps and pass your exam in 24 hours!

Free Exams Sample Questions