Halloween Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: merry71

Free EXIN EPI Certified Data Centre Specialist Practice Questions

Question # 1

The building in which the computer room is housed is required to have a sprinkler system. The building is therefore equipped with a wet pipe system.

What action, if any, should you recommend for the computer room?

Options:

A.  

Maintain the current wet pipe system.

B.  

Replace the wet pipe system with a deluge system.

C.  

Replace the wet pipe system with a dry pipe system.

D.  

Replace the wet pipe system with a pre-action system.

Discussion 0
Question # 2

An air-conditioner unit needs to be selected. Two types are available:

Unit-A has a Sensible Heat Ratio (SHR) of 0.7.

Unit-B has a Sensible Heat Ratio (SHR) of 0.9.

From an efficiency point of view, which one should be selected?

Options:

A.  

It does not matter, as the Sensible Heat Ratio has nothing to do with efficiency.

B.  

Not relevant, as Sensible Heat Ratio is only specified for air-conditioner equipment to indicate the ratio between intake temperature and exhaust temperature.

C.  

Unit A

D.  

Unit B

Discussion 0
Question # 3

What should be implemented when an Inergen-based fire suppression system is installed in the computer room?

Options:

A.  

Drainage system under raised floor

B.  

Gas tanks need to be within or close to the data center

C.  

Pressure release valves in the data center

D.  

Proper water leak detection system

Discussion 0
Question # 4

Where should perforated tiles be installed?

Options:

A.  

At the back of racks

B.  

Every 5th rack

C.  

One tile per rack in front

D.  

As close to AC as possible

Discussion 0
Question # 5

Smoke sensors need to be tested to ensure that they pick up a potential fire in the data center.

What should you recommend?

Options:

A.  

Test the sensors by injecting smoke or simulated smoke directly into the sensor

B.  

Press the self-test button on each sensor in the data center

C.  

Inject smoke at the floor level

D.  

Test the sensors according to the vendor specification

Discussion 0
Question # 6

What is a potential disadvantage of using a hypoxic-based fire suppression system as a fire extinguishing system?

Options:

A.  

It can only be used in computer rooms which have sufficient air changes per hour.

B.  

The gas containers need to be close to the hazard area.

C.  

It can only be used in non-continuous occupied areas.

D.  

It can only be used in computer rooms where you have sufficient positive pressure.

Discussion 0
Question # 7

Which of the following statements is correct?

Options:

A.  

With current increasing, single-phase cables emit more EMF than three-phase cables

B.  

With current decreasing, three-phase cables emit more EMF than single-phase cables

C.  

With voltage increasing, single-phase cables emit more EMF than three-phase cables

D.  

With voltage decreasing, three-phase cables emit more EMF than single-phase cables

Discussion 0
Question # 8

When designing a data center network, your company wants to minimize the number of network cables to install. What type of physical cabling layout would be the best choice?

Options:

A.  

Top of Rack (ToR) design

B.  

End of Row (EoR) design

C.  

Star network design using coaxial cables

D.  

It does not matter as the number of switches is not influenced by the physical cabling layout

Discussion 0
Question # 9

Which formula is correct?

Options:

A.  

Phase-to-Neutral Voltage = Phase-to-Phase voltage * 1.732

B.  

Phase-to-Neutral Voltage = Phase-to-Phase voltage /1.732

C.  

Phase-to-Neutral Voltage = Phase-to-Neutral voltage * 1.732

D.  

Phase-to-Neutral Voltage = (Phase-to-Phase voltage * 1.732) / Phase-to-Neutral Voltage

Discussion 0
Question # 10

What indicates the breaking capacity of a fuse or breaker?

Options:

A.  

Mechanical strength of the casing of a fuse or breaker.

B.  

The maximum voltage, in case of an electrical surge, that the fuse or breaker can handle without being destroyed or causing an electric damaging arc.

C.  

The current at which the device will trip.

D.  

The current that a fuse or breaker is able to interrupt without being destroyed or causing an electric damaging arc.

Discussion 0

CDCS PDF

CDCS PDF (Printable)
$46.5
$154.99

CDCS Testing Engine

CDCS PDF (Printable)
$51
$169.99

CDCS PDF + Testing Engine

CDCS PDF (Printable)
$63.9
$212.99
Exams4sure Dumps

Exam style questions across every CDCS domain

Last Update 2 days ago
Total Questions : 120

Start with our free CDCS practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real EPI Data Centre exam. Each CDCS exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your Exin weak domains, see where you're losing marks, and build a focused study plan in minutes.

Free Exams Sample Questions