The building in which the computer room is housed is required to have a sprinkler system. The building is therefore equipped with a wet pipe system.
What action, if any, should you recommend for the computer room?
An air-conditioner unit needs to be selected. Two types are available:
Unit-A has a Sensible Heat Ratio (SHR) of 0.7.
Unit-B has a Sensible Heat Ratio (SHR) of 0.9.
From an efficiency point of view, which one should be selected?
What should be implemented when an Inergen-based fire suppression system is installed in the computer room?
Smoke sensors need to be tested to ensure that they pick up a potential fire in the data center.
What should you recommend?
What is a potential disadvantage of using a hypoxic-based fire suppression system as a fire extinguishing system?
When designing a data center network, your company wants to minimize the number of network cables to install. What type of physical cabling layout would be the best choice?