Management has requested a 15-minute battery bank assuming full load on the UPS. The UPS vendor has provided the following specifications of the UPS:
•Rated power: 30 kVA
•Rectifier input voltage: 400 V/3 phase
•Rectifier input power factor: 0.8
•Battery rated voltage: 384 V
•Number of cells: 192
•End of discharge voltage: 308 V
•Inverter output voltage: 400 V/3 phase
•Inverter output power factor: 0.8
What information is missing to perform the battery calculation?
From the options indicated, what is the correct starting point for the raised floor installation?

The data center has been in operation for about 1 year and 2 months. The dust levels in the computer room are relatively high.
What is the most likely root cause?
In order to save energy, you are going to install an automated system to switch off lights. What should be taken into consideration when installing such a system?
The building requires sprinklers and is equipped with a wet-pipe system. What action should you recommend for the computer room?
The logical overview of the data center looks as pictured. To what TIA-942 Rating is this design made based on electrical only?

What is the risk of high levels of hydrogen sulfide (H₂S) in the computer room?
You need to install a highly sensitive fire detection system. The data center has a high airflow rate. Which system should you recommend?