Question # 31

The humidity in the computer room has changed from about 50% down to 35% Relative Humidity (RH).

What influence does this have on Electrostatic Discharge (ESD)?

Options:

A.  

No influence as long as the temperature is at approximately 20°C/77°F

B.  

Relative humidity has no influence on ESD

C.  

ESD levels will go up

D.  

ESD levels will go down

Discussion 0
Question # 32

A customer requires THDi from the UPS not to exceed 3% and wants high efficiency. The UPS has a 6-pulse SCR/thyristor rectifier and is loaded ~80%. Many ICT changes are expected in the next 3 years. What should you recommend?

Options:

A.  

Nothing; the UPS will keep THDi at the right levels

B.  

Install a passive harmonic filter on the UPS

C.  

Install an active harmonic filter on the UPS

D.  

Install an isolation transformer rated K13 or K20

Discussion 0
Question # 33

The location of a data center is just above the Arctic Circle (North Pole). The outside air temperature is never above 21°C/70°

F.  

Taking energy efficiency as the highest priority, which cooling system should you recommend?

Options:

A.  

Standard air conditioning units, as spares might not be readily available

B.  

Any cooling system can be efficient because the outside air temperature will not influence the temperature of the air intake of the ICT equipment

C.  

Waterside economizer

D.  

Airside economizer

Discussion 0
Question # 34

A data center requires an audit to find out whether it conforms with ANSI/TIA-942 Rated-3 (concurrently maintainable).

Will the network architecture be part of this audit?

Options:

A.  

No, as concurrently maintainable only applies to electrical and mechanical (power and cooling).

B.  

Yes, but only if the network administration does not comply with ANSI/TIA-606.

C.  

Yes, amongst other aspects, the network architecture should be Rated-3 compliant with the requirements of ANSI/TIA-942.

D.  

No, only the type of cabling used will be audited.

Discussion 0
Question # 35

Management requests a 15-minute battery bank at full UPS load. UPS specs:

    30 kVA, PF 0.8

    Battery 384 V (192 cells), end discharge 308 V

    Inverter PF 0.8, 400 V output

What information is missing to perform the calculation?

Options:

A.  

UPS efficiency

B.  

Inverter efficiency / output PF

C.  

Load imbalance

D.  

Available battery charging current

Discussion 0
Question # 36

You are changing the design of the fire suppression system for your computer room from a halocarbon fire suppression system into an inert-based fire suppression system. Could you use the same formula to calculate the gas content for the gas?

Options:

A.  

No, there is a significant difference in the formula for the different types of fire suppression gases.

B.  

Yes, as long as you take the difference between the net and gross volume into account.

C.  

Yes, as long as you use the same units of measure, i.e., kg/m³ or lbs/ft³.

D.  

Yes, as long as you change the 'S' factor of the formula to reflect the gas type used.

Discussion 0

CDCS PDF

CDCS PDF (Printable)
$46.5
$154.99

CDCS Testing Engine

CDCS PDF (Printable)
$51
$169.99

CDCS PDF + Testing Engine

CDCS PDF (Printable)
$63.9
$212.99

Free Exams Sample Questions