Pre-Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Free Source Inspector Electrical Equipment Practice Questions

Exams4sure Dumps

Exam style questions across every API-SIEE domain

Last Update 3 days ago
Total Questions : 110

Start with our free API-SIEE practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real ICP Programs exam. Each API-SIEE exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your API weak domains, see where you're losing marks, and build a focused study plan in minutes.

API-SIEE PDF

API-SIEE PDF (Printable)
$54.25
$154.99

API-SIEE Testing Engine

API-SIEE PDF (Printable)
$59.5
$169.99

API-SIEE PDF + Testing Engine

API-SIEE PDF (Printable)
$74.55
$212.99
Question # 1

According to API 541, for the bearing temperature rise test, motor bearing stable temperature is defined:

Options:

A.  

by the manufacturer's FAT procedure.

B.  

as a change of not more than 1°C in 30 minutes.

C.  

as a rise of not more than 1°C in one hour.

D.  

as a rise of not more than 2°C in one hour.

Discussion 0
Question # 2

During the course of manufacturing the supplier/vendor may propose design changes that could impact cost, schedule and/or quality. In such cases, the source inspector should:

Options:

A.  

prepare a summary of the changes made for inclusion in their report and subsequent action by the purchaser.

B.  

request that the supplier/vendor develop a cost/benefit analysis for review and approval by the inspector.

C.  

prepare a cost/benefit analysis in order to justify their acceptance or rejection of the proposed changes.

D.  

request that the supplier/vendor propose such changes in writing for review by the purchaser.

Discussion 0
Question # 3

The highest voltage rating on a piece of medium voltage equipment is the:

Options:

A.  

basic impulse level.

B.  

AC high potential.

C.  

DC high potential.

D.  

nominal voltage.

Discussion 0
Question # 4

What is an advantage of the Insulation Resistance test?

Options:

A.  

It is non-destructive in nature.

B.  

It is not affected by higher moisture content in the air.

C.  

It is not affected by increases in joint temperature.

D.  

It can be conducted above the breakdown voltage of the insulation.

Discussion 0
Question # 5

The insulation requirement referred to in NEMA ICS 1 defines clearance as the shortest distance:

Options:

A.  

between the ground plane and the neutral conductor.

B.  

over the surface of an insulating material between two conducting parts.

C.  

measured through air between two conducting parts.

D.  

a person can approach a live conductor without initiating a hazardous arcing incident.

Discussion 0
Question # 6

Actual dimensions verified during a source inspection should be recorded in the:

Options:

A.  

redline drawing.

B.  

reference drawing.

C.  

shop traveler.

D.  

status report.

Discussion 0
Question # 7

What is the purpose of labeling the temperature range on electrical equipment used in a Class I hazardous area?

Options:

A.  

To verify the process temperature and the equipment temperature have the same Class I rating

B.  

To ensure that the equipment maximum temperature does not exceed the autoignition temperature of the specific gas or vapor to be encountered

C.  

To ensure the equipment is compatible with the other Class I devices

D.  

To verify the maximum process temperature does not exceed high levels

Discussion 0
Question # 8

Deviations from specifications must be approved by the:

Options:

A.  

manufacturer's engineer.

B.  

vendor's quality manager.

C.  

inspection coordinator.

D.  

responsible engineer.

Discussion 0
Question # 9

According to IEEE C57.12.00, a durable, metal, name plate shall be affixed to each transformer by the:

Options:

A.  

manufacturer.

B.  

owner.

C.  

purchaser.

D.  

QA/QC Inspector.

Discussion 0
Question # 10

What is the process that aims to find potential defects in a product before it is released for delivery?

Options:

A.  

Inspection

B.  

Examination

C.  

Quality Control

D.  

Quality Assurance

Discussion 0

Free Exams Sample Questions