Discuss the training needs for personnel who may be required to respond to a release of a hazardous substance within a chemical facility.

Options:

A.  

Focus only on theoretical knowledge of chemicals and hazards

B.  

Provide only basic PPE training without practical exercises

C.  

Provide comprehensive training including hazard recognition, emergency response actions, PPE use, and incident command understanding

D.  

Limit training to evacuation procedures only

Discussion 0
Question # 12

A strong Management of Change system should ensure that: (select all that apply)

Options:

A.  

Emergency changes do not require Management of Change controls

B.  

Root causes are identified

C.  

Adequate evaluations of the potential safety and health impacts are performed

D.  

Appropriate updates have been made to the preventive maintenance requirements

E.  

Temporary changes are returned to normal by the required date

Discussion 0
Question # 13

It is considered good Risk Based Process Safety practice to periodically review operating procedures, and this review must be done by the person who wrote the procedure.

True or False?

Options:

A.  

True

B.  

False

Discussion 0
Question # 14

Which of the following can be considered applicable inspection methods as part of an Inspection/Testing/Preventive Maintenance program under the Asset Integrity and Reliability Element? (Select all that apply)

Options:

A.  

Ultrasonic Thickness Measurements

B.  

Work Orders

C.  

Ultrasonic Leak Detection

D.  

Positive Material Identification

Discussion 0
Question # 15

What are some outputs of a Management of Change review? (Select all that apply)

Options:

A.  

Updates to process safety information

B.  

Authorized change request

C.  

Revision to related training

D.  

Appropriate revisions or updates to procedures

Discussion 0
Question # 16

A company has done a statistical/metric study on root causes of incidents over the last dozen years. It shows a steady, marked increase in the number of incidents with root cause being insufficient operator knowledge of the process. Which two of the following statements are most reasonable?

Options:

A.  

The incident investigation element is clearly deficient

B.  

The company’s training program might need improvement

C.  

The company’s process safety competency could be deteriorating

D.  

Facility audits are not detecting the issue

E.  

Better writing of operating procedures will compensate for insufficient process knowledge by the operators

Discussion 0
Question # 17

Which of the following would be most effective as a leading metric for a Management of Change program?

Options:

A.  

Percentage of procedures revalidated per schedule/plan/period

B.  

Percentage of work orders/requests which were misclassified as replacement-in-kind

C.  

Number (or percent) of overdue inspection, testing, and preventative maintenance tasks

D.  

Number of metrics for which data are collected

Discussion 0
Question # 18

Which of the following is not essential to Conduct of Operations:

Options:

A.  

A strong process safety culture

B.  

Widely understood but unwritten ways the work is accomplished

C.  

Defining roles and responsibilities

D.  

Establishing standards for performance

Discussion 0
Question # 19

Question # 19

The X/Y/Z Corporation decides to track an activity as shown in the diagram. They interpret the results to indicate a possible deteriorating performance in one of their process safety management elements.

The chart shows a declining trend in the number of industry group meetings at which company presenters shared significant lessons learned over several years.

Which of the following RBPS elements is MOST directly reflected by this activity?

Options:

A.  

Compliance with Standards

B.  

Process Safety Competence

C.  

Stakeholder Outreach

D.  

Workforce Involvement

E.  

Measurement and Metrics

Discussion 0
Question # 20

Which of the following Risk-Based Process Safety elements are expected to be most directly and frequently involved with the Emergency Management Element? (select all that apply)

Options:

A.  

Stakeholder Outreach

B.  

Management of Change

C.  

Training and Performance Assurance

D.  

Hazard Identification and Risk Analysis

Discussion 0

CCPSC PDF

CCPSC PDF (Printable)
$54.25
$154.99

CCPSC Testing Engine

CCPSC PDF (Printable)
$59.5
$169.99

CCPSC PDF + Testing Engine

CCPSC PDF (Printable)
$74.55
$212.99

Free Exams Sample Questions