Pre-Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Free Certified Health Care Facility Manager (CHFM) Practice Questions

Exams4sure Dumps

Exam style questions across every CHFM domain

Last Update 1 day ago
Total Questions : 108

Start with our free CHFM practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real AHA-CC exam. Each CHFM exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your AHA weak domains, see where you're losing marks, and build a focused study plan in minutes.

CHFM PDF

CHFM PDF (Printable)
$54.25
$154.99

CHFM Testing Engine

CHFM PDF (Printable)
$59.5
$169.99

CHFM PDF + Testing Engine

CHFM PDF (Printable)
$74.55
$212.99
Question # 21

At the end of an 8-hour electrical shutdown, after the maintenance work is completed but before the cabinets are closed up or the system re-energized, a final inspection should be completed by individuals who have

Options:

A.  

been involved since the beginning of the shutdown.

B.  

"fresh eyes" and go/no go authority.

C.  

working knowledge of the generators and switch gear.

D.  

gathered feedback and attended the lessons learned debriefing.

Discussion 0
Question # 22

Boiler low water cut-offs are designed to stop the

Options:

A.  

flow of steam.

B.  

supply of air.

C.  

operation of the burner.

D.  

flow of make-up water.

Discussion 0
Question # 23

To minimize the number of change orders, it is best to have

Options:

A.  

complete plans and specifications.

B.  

a builder's insurance policy and performance bond.

C.  

multiple prequalified bidders.

D.  

a qualified construction manager and subcontractors.

Discussion 0
Question # 24

A hospital will purchase builder risk insurance to address which of the following?

Options:

A.  

medical costs in the event a worker gets hurt on a construction site

B.  

payment to subcontractors in the event the prime contractor fails to pay subcontractors

C.  

replacement or repair value of a damaged structure

D.  

liability caused by general contractor default

Discussion 0
Question # 25

Which of the following are requirements of a medical equipment management plan?

problem, failure, or user error data collection

a computerized equipment inventory

performance standards

an annual plan review

Options:

A.  

1, 2, and 3 only

B.  

1, 2, and 4 only

C.  

1, 3, and 4 only

D.  

2, 3, and 4 only

Discussion 0
Question # 26

According to The Joint Commission Emergency Management Standards, a facility must

Options:

A.  

maintain inventories of critical supplies in sufficient quantities to maintain operations for 96 hours.

B.  

provide utilities, equipment, and supplies in order to maintain operations for 96 hours.

C.  

establish agreements with utility, equipment, and supply vendors to provide support in order to maintain operations for 96 hours.

D.  

evaluate capabilities and response efforts for the organization to maintain operations for 96 hours.

Discussion 0
Question # 27

When preparing to open up a newly constructed wing, who is required to survey the new area?

Options:

A.  

police department

B.  

fire department

C.  

utility department

D.  

engineering department

Discussion 0
Question # 28

Which of the following is the best description of the purpose of an Environmental Tour as required by TJC?

Options:

A.  

categorizes risk assessments

B.  

ensures compliance with TJC standards

C.  

establishes failures in building systems

D.  

identifies hazards

Discussion 0
Question # 29

How many emergency management disaster drills are required per year in a healthcare occupancy?

Options:

A.  

1

B.  

2

C.  

3

D.  

4

Discussion 0
Question # 30

An administrator is considering outsourcing the BioMed function to reduce cost. The low-bid base price for outside annual inspection and testing service is $180,000 with an $80/hr repair labor rate and a $120/hr call-in labor rate. The BioMed department currently has an annual labor budget of $240,000. Assuming an estimate of 600 hours of repair labor and 100 hours of call-in labor, how much will the administrator save annually with the outsourcing option?

Options:

A.  

$0

B.  

$12,000

C.  

$48,000

D.  

$80,000

Step-by-Step Calculation:

Current in-house cost: $240,000.

Outsourcing cost:

Base price: $180,000

Repair: 600 hrs × $80/hr = $48,000

Call-in: 100 hrs × $120/hr = $12,000

Total outsourcing = $180,000 + $48,000 + $12,000 = $240,000

Difference: $240,000 – $240,000 = $0