Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: merry71

Free Certified Technology Specialist Practice Questions

Exams4sure Dumps

Exam style questions across every CTS domain

Last Update 4 days ago
Total Questions : 254

Start with our free CTS practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real AVIXA Communications Certifications exam. Each CTS exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your AVIXA weak domains, see where you're losing marks, and build a focused study plan in minutes.

CTS PDF

CTS PDF (Printable)
$46.5
$154.99

CTS Testing Engine

CTS PDF (Printable)
$51
$169.99

CTS PDF + Testing Engine

CTS PDF (Printable)
$63.9
$212.99
Question # 21

Which is the MOST important factor during the development of an AV project scope?

Options:

A.  

entire budget

B.  

clients responsibility

C.  

analyze the strategic plan

D.  

stakeholders requirements

Discussion 0
Question # 22

The FIRST step in troubleshooting an AV system is to

Options:

A.  

clearly identify the failure symptoms.

B.  

change only one component at a time.

C.  

ensure that all the system components have power.

D.  

divide the system in half to identify the portion that is not working.

Discussion 0
Question # 23

As the height of a character increases on a display.

Options:

A.  

legibility increases.

B.  

legibility decreases.

C.  

brightness increases.

D.  

brightness decreases.

Discussion 0
Question # 24

According to AVIXA's AV Performance Verification standard, at what point should the loudspeaker transformer tap setting be verified?

Options:

A.  

Closeout

B.  

Pre-integration

C.  

Post-integration

D.  

Systems integration

Discussion 0
Question # 25

The goal of initial AV design meetings is to determine:

Options:

A.  

Fabricators

B.  

Finances

C.  

Frequencies

D.  

Functionality

Discussion 0
Question # 26

As a project manager, daily or weekly updates from the____are MOST USEFUL when trying to make sure a job comes in on time and on budget.

Options:

A.  

installer

B.  

customer

C.  

employer

D.  

consultant

Discussion 0
Question # 27

Which of these cables should be used for a balanced microphone signal?

Question # 27

Options:

A.  

A

B.  

B

C.  

C

D.  

D

Discussion 0
Question # 28

During a site survey, a sound pressure level (SPL) meter can be used for measuring

Options:

A.  

the room acoustics.

B.  

the ambient noise level.

C.  

the efficiency of the amplification.

D.  

distance to existing loudspeakers.

Discussion 0
Question # 29

Microphone signal levels are typically measured in:

Options:

A.  

Hertz

B.  

Amperes

C.  

Millivolts

D.  

Milliwatts

Discussion 0
Question # 30

During the site survey, the client indicates that the space that will become a rear projection room is currently an off-white color. What should be recommended to the client?

Options:

A.  

paint the room gray

B.  

paint the room black

C.  

leave the room as it is

D.  

use carpeting on the walls

Discussion 0