Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

AZ-120 Planning and Administering Microsoft Azure for SAP Workloads is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

AZ-120 Practice Questions

Planning and Administering Microsoft Azure for SAP Workloads

Last Update 3 days ago
Total Questions : 307

Dive into our fully updated and stable AZ-120 practice test platform, featuring all the latest Microsoft Certified: Azure for SAP Workloads Specialty exam questions added this week. Our preparation tool is more than just a Microsoft study aid; it's a strategic advantage.

Our free Microsoft Certified: Azure for SAP Workloads Specialty practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about AZ-120. Use this test to pinpoint which areas you need to focus your study on.

AZ-120 PDF

AZ-120 PDF (Printable)
$48.3
$137.99

AZ-120 Testing Engine

AZ-120 PDF (Printable)
$52.5
$149.99

AZ-120 PDF + Testing Engine

AZ-120 PDF (Printable)
$65.45
$186.99
Question # 11

You have a Recovery Services vault backup policy for SAP HANA on an Azure virtual machine as shown in the following exhibit.

Question # 11

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.

NOTE: Each correct selection is worth one point.

Options:

Discussion 0
Question # 12

You are evaluating which migration method Litware can implement based on the current environment and the business goals.

Which migration method will cause the least amount of downtime?

Options:

A.  

Use the Database migration Option (DMO) to migrate to SAP HANA and Azure During the same maintenance window.

B.  

Use Near-Zero Downtime (NZDT) to migrate to SAP HANA and Azure during the same maintenance window.

C.  

Migrate SAP to Azure, and then migrate SAP ECC to SAP Business Suite on HAN

A.  

D.  

Migrate SAP ECC to SAP Business Suite on HANA an the migrate SAP to Azure.

Discussion 0
Question # 13

You need to ensure that you can receive technical support to meet the technical requirements.

What should you deploy to Azure?

Options:

A.  

SAP Landscape Management (LaMa)

B.  

SAP Gateway

C.  

SAP Web Dispatcher

D.  

SAPRouter

Discussion 0
Question # 14

You deploy an SAP production landscape on Azure virtual machines that run SUSE Linux Enterprise Server (SLES).

You need to generate a report that details performance differences between instances of an SAP AS ABAP system.

What should you use?

Options:

A.  

JMeter

B.  

Micro Focus LoadRunner

C.  

SAP UI5 SpeedtestTool

D.  

ABAPmeter

Discussion 0
Question # 15

For each of the following statements, select Yes if the statement is true. Otherwise, select No.

NOTE: Each correct selection is worth one point.

Question # 15

Options:

Discussion 0
Question # 16

Litware is evaluating whether to add high availability after the migration?

What should you recommend to meet the technical requirements?

Options:

A.  

SAP HANA system replication and Azure Availability Sets

B.  

Azure virtual machine auto-restart with SAP HANA service auto-restart.

C.  

Azure Site Recovery

Discussion 0
Question # 17

For each of the following statements, select Yes if the statement is true. Otherwise, select No.

NOTE: Each correct selection is worth one point.

Question # 17

Options:

Discussion 0
Question # 18

What should you use to perform load testing as part of the migration plan?

Options:

A.  

JMeter

B.  

SAP LoadRunner by Micro Focus

C.  

Azure Application Insights

D.  

Azure Monitor

Discussion 0
Question # 19

You need to recommend a solution to reduce the cost of the SAP non-production landscapes after the migration.

What should you include in the recommendation?

Options:

A.  

Deallocate virtual machines when not In use.

B.  

Migrate the SQL Server databases to Azure SQL Data Warehouse.

C.  

Configure scaling of Azure App Service.

D.  

Deploy non-production landscapes to Azure Devlest Labs.

Discussion 0
Question # 20

Once the migrate completes, to which size should you set the ExpressRoute circuit to the New York office to meet the business goals and technical requirements?

Options:

A.  

500 Mbps

B.  

1,000 Mbps

C.  

2,000 Mbps

D.  

5,000 Mbps

Discussion 0
Get AZ-120 dumps and pass your exam in 24 hours!

Free Exams Sample Questions