CCBA Practice Questions

Certification of Capability in Business Analysis (CCBA)

Last Update 5 hours ago
Total Questions : 638

Dive into our fully updated and stable CCBA practice test platform, featuring all the latest Certification of Capability in Business Analysis exam questions added this week. Our preparation tool is more than just a IIBA study aid; it's a strategic advantage.

Our free Certification of Capability in Business Analysis practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about CCBA. Use this test to pinpoint which areas you need to focus your study on.

CCBA PDF

CCBA PDF (Printable)
$43.75
$124.99

CCBA Testing Engine

CCBA PDF (Printable)
$50.75
$144.99

CCBA PDF + Testing Engine

CCBA PDF (Printable)
$63.7
$181.99
Question # 91

A business analyst (BA) has spent the week conducting work sessions with a project's key stakeholders. Together, they have been reviewing user requirements and high-level design flowcharts to ensure that they have been correctly defined and documented. Which of the following describes the purpose of their work?

Options:

A.  

Validating requirements

B.  

Eliciting requirements

C.  

Verifying requirements

D.  

Approving requirements

Discussion 0
Question # 92

A business analyst (BA) is assigned a new project and is beginning to prepare for elicitation. Which task must the BA complete before preparation of the elicitation process can begin?

Options:

A.  

Coordinate meeting logistics

B.  

Approve anticipated expenses

C.  

Gather contact information of stakeholder

D.  

Collect information on the business need

Discussion 0
Question # 93

A company wants to launch a new product that will have similar features to an existing product. A business analyst (BA) working on the project has invited the product manager to explain the features and business rules of the new product. Which activity must the BA perform in preparation of the session?

Options:

A.  

Align the scope of the project to the company’s strategy

B.  

Review information about the existing project

C.  

Ensure requirements are traceable

D.  

Determine the communication plan for requirements

Discussion 0
Question # 94

A business analyst (BA) wants to check the completeness of requirements defined after meeting with project stakeholders. A group of subject matter experts (SMEs) has been identified and invited to a workshop to walk through the requirements. What must the BA do to ensure a shared understanding of requirements?

Options:

A.  

Align requirements to the organizational strategy

B.  

Prioritize requirements according to expected stakeholders value

C.  

Ensure requirements attributes are consistent for ease of access

D.  

Determine the format to present the requirements to the SMEs attending the workshop

Discussion 0
Question # 95

A key stakeholder has requested an extensive range of performance measures for a replacement workflow system. A business analyst (BA) has decided to work closely with the stakeholder to validate the performance measures requested. The BA will be ensuring that the performance measures:

Options:

A.  

are ether qualitative or quantitative measurements, but not both.

B.  

align to industry benchmarks gathered for similar solution implementations.

C.  

are written in the correct format. using the agreed standards and terminology.

D.  

align with other measures within the broader context of the solution.

Discussion 0
Question # 96

Market studies projected a 28% year over year growth for five (5) years for commercial vehicle loans. A company that provides lending for commercial vehicles wanted to keep up with industry demand; however, their applications were not capable of scaling to the increased demand for loan processing and billing. The company is deploying a new system to meet the demand. The project started five (5) years ago and cost S2 million US

D.  

The project metrics are to be evaluated after five (5) years. The return on investment (ROI) for the project is calculated at 11%. The project sponsors are upset that the desired ROI for the project was not met. The actual demand for commercial vehicle loans for the past five (5) years is as follows:

Options:

A.  

Risk planning

B.  

flowed assumptions

C.  

Demand forecasting

D.  

Capability planning

Discussion 0
Question # 97

A project to replace a financial system uses a waterfall methodology. Initially, meetings with the project subject

matter experts (SMEs) were positive. As the project progressed through the requirements and design phases, the SMEs attended fewer meetings, resulting in a delay to the project build phase. What should the business analyst (BA) have done to prevent the delay?

Options:

A.  

Selected a different project methodology

B.  

Requested new SMEs participate in the project

C.  

Modified the governance structure

D.  

Engaged in consistent collaboration

Discussion 0
Question # 98

The following chart represents attendance of subject matter experts (SME) and the solution owner for a requirements review and approval meeting held weekly by a business analyst (BA).

Question # 98

The requirements package was approved by the solution owner during the May 30 meeting. After implementation of the solution, the BA learns that the users in SME-3 s area are not using the system. Which business analysis activity should the BA have monitored more closely to mitigate this situation?

Options:

A.  

Business processes

B.  

Requirements scope

C.  

Solution performance

D.  

Stakeholder engagement

Discussion 0
Question # 99

A business analyst (BA) spent three months eliciting, specifying, and modelling the detailed stakeholder and solution requirements. Right before requirement sign-off, the BA realized that the Vice President was unable to approve the requirements and the Chief Financial Officer should do so. What element of requirement approval did the BA miss?

Options:

A.  

Manage conflicts and issues

B.  

Track and communicate approval

C.  

Gain consensus

D.  

Understand stakeholder roles

Discussion 0
Question # 100

During a senior management meeting about a project at the requirements analysis stage, a business analyst (BA) stated that there were a number of workarounds associated with the current application. The Chief Information Officer (CIO) was looking for ways to improve the situation and the BA suggests a solution. Which of the following can the BA suggest that the organization consider to increase efficiencies?

Options:

A.  

Process improvement

B.  

Strategy realignment

C.  

Capability assessment

D.  

Project abandonment

Discussion 0
Question # 101

A business analyst (BA) has executed the last planned workshop in a series in order to verify requirements. All issues have been logged in an issues register. What technique is used to manage and resolve the outstanding issues?

Options:

A.  

Requirements documentation

B.  

Requirements analysis

C.  

Metrics and KPIs

D.  

Item backing methods

Discussion 0
Question # 102

Which tool will allow a business analyst (BA) to determine how information is input, processed, stored, and extracted from a collection of systems?

Options:

A.  

Data Glossary

B.  

Activity Flow

C.  

Entity Relationship Diagram

D.  

Data Flow Diagram

Discussion 0
Question # 103

A change is desired in a project after the requirements are signed off and after technical design has started. The stakeholders want an additional product to be developed as part of the project. What tool can be used by the business analyst (BA) to assess the impact of the change?

Options:

A.  

Concept modelling

B.  

Requirements architecture

C.  

Backlog management

D.  

Balanced scorecard

Discussion 0
Question # 104

A business analyst (BA) has recently joined a large consultancy firm where BAs are globally distributed on different assignments. Where would the BA find expectations for business analysis work as mandated by the consultancy firm?

Options:

A.  

Organizational performance standards

B.  

Information management approach

C.  

Modelling notations standards

D.  

Business analysis approach

Discussion 0
Question # 105

Stakeholder requirements where approved for a business process reengineering initiative along with the Creation of a | roadmap. Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) modify in the stakeholder requirements?

Options:

A.  

Requirement performance measures

B.  

Scope model

C.  

Requirement description

D.  

Requirement attribute values

Discussion 0