Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: merry71

Free CSQA Certified Software Quality Analyst Practice Questions

Question # 41

Which of the following would be considered the lack of involvement by management to promote quality concepts?

Options:

A.  

Unknown software defects in the production system

B.  

Failure to enforce standards

C.  

Lack of a quality vocabulary

D.  

Lack of knowledge of the principles of quality

Discussion 0
Question # 42

Staff job satisfaction increases significantly as processes mature.

Options:

A.  

True

B.  

False

Discussion 0
Question # 43

The check sheet is used to record data gathered over a period of time to determine frequency of an event.

Options:

A.  

True

B.  

False

Discussion 0
Question # 44

-- Exhibit –

Question # 44

-- Exhibit --

In the diagram of the tester's work bench, the box labeled (2) is the:

Options:

A.  

Input(s)

B.  

Standard(s)

C.  

Policy

D.  

Check Procedures

E.  

Do Procedures

Discussion 0
Question # 45

Which is the best positioning of a quality manager within the IT organization?

Options:

A.  

Senior IT Manager

B.  

Manager of Systems Programming

C.  

Manager of Computer Operations

D.  

Outside of the IT Function

Discussion 0
Question # 46

Which one of the following is a disadvantage of Functional Testing?

Options:

A.  

Potential of missing logical errors in software

B.  

Its tests do not ensure that user requirements have been met

C.  

Its tests may not mimic real-world situations

D.  

None of the above

Discussion 0
Question # 47

The theory of levels of maturity is that organizations can skip a level if business needs require them to be at a higher maturity level.

Options:

A.  

True

B.  

False

Discussion 0
Question # 48

The following types of controls, which are designed to alert individuals to a process problem such as control totals assuring data transmissions are complete, are called:

Options:

A.  

Preventive Controls

B.  

Detective Controls

C.  

Corrective Controls

D.  

Quality Controls

E.  

All of the above

Discussion 0
Question # 49

If a software development contract includes a clause on foreign attachments, which of the following would be considered a foreign attachment?

Options:

A.  

A software system developed by an organization in another country

B.  

An application component developed by a different contractor than the one contracted to build software using that component

C.  

The customer's right to discontinue service with the contractor

D.  

Having the hardware installed by an individual from a country other than where the software will be operated

Discussion 0
Question # 50

Prerequisites for quality planning is / are:

Options:

A.  

IT vision, mission, and goals documented

B.  

Management support for planning

C.  

Planners competent in the planning process

D.  

All of the above

Discussion 0

CSQA PDF

CSQA PDF (Printable)
$46.5
$154.99

CSQA Testing Engine

CSQA PDF (Printable)
$51
$169.99

CSQA PDF + Testing Engine

CSQA PDF (Printable)
$63.9
$212.99

Free Exams Sample Questions