Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

D-AV-DY-23 Dell Avamar Deploy 2023 Exam is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

D-AV-DY-23 Practice Questions

Dell Avamar Deploy 2023 Exam

Last Update 4 days ago
Total Questions : 235

Dive into our fully updated and stable D-AV-DY-23 practice test platform, featuring all the latest Data Protection exam questions added this week. Our preparation tool is more than just a EMC study aid; it's a strategic advantage.

Our free Data Protection practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about D-AV-DY-23. Use this test to pinpoint which areas you need to focus your study on.

D-AV-DY-23 PDF

D-AV-DY-23 PDF (Printable)
$43.75
$124.99

D-AV-DY-23 Testing Engine

D-AV-DY-23 PDF (Printable)
$50.75
$144.99

D-AV-DY-23 PDF + Testing Engine

D-AV-DY-23 PDF (Printable)
$63.7
$181.99
Question # 11

Which user account and default password should be used when configuring an additional Dell Avamar server in Enterprise Manager?

Options:

A.  

MCUser / MCUser1

B.  

Avamar internal root / 8RttoTriz

C.  

O/S root / changeme

D.  

O/S admin / changeme

Discussion 0
Question # 12

What does the Dell Avamar deduplication process accomplish?

Options:

A.  

Achieves maximum advantage of disk characteristics

B.  

Enables platform-independent data objects

C.  

Ensures that each data object is stored only once

D.  

Provides data integrity and disaster recovery protection

Discussion 0
Question # 13

Which size Avamar Gen4 storage node is supported for a RAIN configuration?

Options:

A.  

1.0 TB

B.  

1.3 TB

C.  

2.6 TB

D.  

3.9 TB

Discussion 0
Question # 14

Based on Dell best practices, what is recommended when creating Avamar schedules?

Options:

A.  

Use a single schedule where possible

B.  

Use a different schedule for each group

C.  

Use multiple schedules to ensure backup jobs do not overlap

D.  

Use a separate schedule for each client

Discussion 0
Question # 15

What is the smallest supported RAIN configuration for Dell Avamar?

Options:

A.  

1 utility node, 0 spare nodes, 3 storage nodes

B.  

1 utility node, 0 spare nodes, 1 storage node

C.  

1 utility node, 1 spare node, 4 storage nodes

D.  

1 utility node, 1 spare node, 2 storage nodes

Discussion 0
Question # 16

Prior to starting an Dell Avamar node add and rebalance procedure, what should be done first to ensure that the activity can be completed without data loss?

Options:

A.  

Perform a full system pre-upgrade health check

B.  

Perform an orderly reboot of all nodes in the grid

C.  

Run 'asktime' to ensure all node clocks are synchronized

D.  

Add the new node names and IPs to the /etc/hosts file

Discussion 0
Question # 17

By default, what percentage of file system storage space is reserved for operating systems and checkpoint overhead on an Dell Avamar server?

Options:

A.  

10%

B.  

20%

C.  

35%

D.  

50%

Discussion 0
Question # 18

A company has decided to deploy the Dell Avamar software to guest machines in a VMware environment.

What is the difference between backing up a guest machine versus a physical machine?

Options:

A.  

No difference

B.  

Image level recovery only

C.  

Avamar cannot replicate the backup of the guest machine

D.  

Deduplication is not as efficient

Discussion 0
Question # 19

Which Dell tool provides all the necessary steps, in the correct order, to implement an Dell Avamar server?

Options:

A.  

Avamar Procedure Generator

B.  

Dell Backup System Sizer

C.  

TS-Kit Configuration Guide

D.  

TS-Kit Test Plan

Discussion 0
Question # 20

A Microsoft Windows user is about to initiate an on-demand backup from the client interface when the utility node fails on their multi-node Dell Avamar grid. What must be done prior to initiating the backup to ensure the backup will complete successfully?

Options:

A.  

Nothing. Backups are performed from the client to the storage nodes directly.

B.  

The utility node must be replaced and the configuration restored prior to starting the backup.

C.  

The spare node must be converted to a utility node and the configuration restored to it prior to starting the backup.

D.  

The client must be activated temporarily to the first storage node and then the backup can continue.

Discussion 0
Get D-AV-DY-23 dumps and pass your exam in 24 hours!

Free Exams Sample Questions