Month End Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: merry71

Free SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Practice Questions

Exams4sure Dumps

Exam style questions across every E_S4HCON2023 domain

Last Update 3 hours ago
Total Questions : 80

Start with our free E_S4HCON2023 practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real SAP Certified Technology Specialist exam. Each E_S4HCON2023 exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your SAP weak domains, see where you're losing marks, and build a focused study plan in minutes.

E_S4HCON2023 PDF

E_S4HCON2023 PDF (Printable)
$46.5
$154.99

E_S4HCON2023 Testing Engine

E_S4HCON2023 PDF (Printable)
$51
$169.99

E_S4HCON2023 PDF + Testing Engine

E_S4HCON2023 PDF (Printable)
$63.9
$212.99
Question # 11

You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?

Please choose the correct answer.

Response:

Options:

A.  

An additional temporary database is used during uptime

B.  

Dedicated application tables are migrated in uptime

C.  

TABIMJJPG is executed in uptime

D.  

The repository is migrated in uptime

Discussion 0
Question # 12

You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?

Options:

A.  

EU_IMPORT_ALL

B.  

EU_CLONE_MIG_DT_CREATE

C.  

EU_CLONE_MIG_SOT_RUN

D.  

EU_CLONE_MIG_DT_RUN

Discussion 0
Question # 13

Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

Options:

A.  

Dual Stack split

B.  

Support Package Stack update

C.  

Database migration

D.  

Release upgrade

E.  

Homogenous system copy

Discussion 0
Question # 14

What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?

Please choose the correct answer.

Response:

Options:

A.  

An upgrade of the software components is performed, without changing the database type.

B.  

A change of the database type is performed, without changing the software components.

C.  

An SAP S/4HANA conversion is performed, without adapting the customer data.

D.  

A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.

Discussion 0
Question # 15

What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

Options:

A.  

Depending on the SAP S/4HANA version, there are different SI check frameworks.

B.  

The SI checks are executed in the development system and the results are transported into the subsequent systems.

C.  

You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.

D.  

You need to build up a SI check framework by applying SAP notes.

Discussion 0
Question # 16

During the configuration of the DMO for SUM, which Migration Parameter selection is NOT possible for an inplace migration?

Options:

A.  

DMO with system move

B.  

Migration repetition option

C.  

Table count verification

D.  

Table contents compare

Discussion 0
Question # 17

Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

Options:

A.  

Shadow on target creation

B.  

Downtime conversion

C.  

Silent data migration (SDM)

D.  

Downtime migration

Discussion 0
Question # 18

You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?

Please choose the correct answer.

Response:

Options:

A.  

/ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)

B.  

/ASU/SSM (ASU Simple Schedule Manager)

C.  

/ASU/SHOW_NOTE (Show SAP Note via Web-Browser)

D.  

/ASU/START (Start ASU Toolbox)

Discussion 0
Question # 19

You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".

Where can you change this during the migration via the Utilities option of the SUM UI?

There are 2 correct answers to this question

Response:

Options:

A.  

In SUM Phaselist

B.  

In Process Control Center

C.  

In SUM Parameters

D.  

In DMO Migration Preparation

Discussion 0
Question # 20

In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

Options:

A.  

When performing an SAP S/4HANA conversion with DMO

B.  

When performing an SAP S/4HANA conversion without u DMO

C.  

When upgrading an SAP S/4HANA Server system

D.  

When upgrading an SAP ECC system with DMO