Winter Special Sale Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 2493360325

H12-411_V2.0 HCIA-Data Center Facility V2.0 is now Stable and With Pass Result | Test Your Knowledge for Free

H12-411_V2.0 Practice Questions

HCIA-Data Center Facility V2.0

Last Update 1 day ago
Total Questions : 204

Dive into our fully updated and stable H12-411_V2.0 practice test platform, featuring all the latest HCIA-Data Center Facility exam questions added this week. Our preparation tool is more than just a Huawei study aid; it's a strategic advantage.

Our HCIA-Data Center Facility practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about H12-411_V2.0. Use this test to pinpoint which areas you need to focus your study on.

H12-411_V2.0 PDF

H12-411_V2.0 PDF (Printable)
$50
$124.99

H12-411_V2.0 Testing Engine

H12-411_V2.0 PDF (Printable)
$58
$144.99

H12-411_V2.0 PDF + Testing Engine

H12-411_V2.0 PDF (Printable)
$72.8
$181.99
Question # 1

The user can use the ____________ function to assign personnel to handle the fault.

Options:

Discussion 0
Question # 2

One ups The capacity is 200KVA, Its output power factor is 0.9, Then it can drive at most ____________ load.

Options:

Discussion 0
Question # 3

Huawei Monitoring System NetEco Supports the concept of user groups, and implements role-based user group management. A user group is a group of user-level collections with the same operation permissions, and different user groups have different permissions.

Options:

A.  

True

B.  

False

Discussion 0
Question # 4

The throttling devices used by Huawei's air-cooled precision air conditioners are ____________ .

Options:

Discussion 0
Question # 5

When the AC power equipment is introduced in the three-phase four-wire system, in addition to the grounding of the near end of the power transformer, the near end of the electrical equipment and the equipment room should be grounded repeatedly on the neutral line.

Options:

A.  

True

B.  

False

Discussion 0
Question # 6

In the battery structure, the ____________ component functions to remove excess gas.

Options:

Discussion 0
Question # 7

Protective grounding: Grounding refers to the direct connection with the earth, and a certain point of the live part of an electrical device or electrical circuit is connected to a large point. When the electrical device or other device is normal, a certain point of the uncharged part is artificially connected to the earth.

Options:

A.  

True

B.  

False

Discussion 0
Question # 8

The access control system can only set the user to open the door, and cannot set when to open the door.

Options:

A.  

True

B.  

False

Discussion 0
Question # 9

The refrigerant used by Huawei precision air conditioner is ____________ .

Options:

Discussion 0
Question # 10

Through the query ____________, the user can understand the operation of the device.

Options:

Discussion 0