Question # 11

Which of the following is not part of EHS management during operations?

Options:

A.  

Prevent risks based on the key points of construction safety risk control.

B.  

Appraise the work efficiency of on-boarding personnel.

C.  

Review the qualifications of special operation personnel.

D.  

Check that operation personnel wear PPE during operation.

Discussion 0
Question # 12

The construction preparation phase includes preparing for entry, developing a quality plan, checking qualifications, and carrying out technical and safety disclosure.

Options:

A.  

True

B.  

False

Discussion 0
Question # 13

Which requirements must be met when packing dangerous goods?

Select All that Apply.

Options:

A.  

Sealing performance

B.  

Transparency requirements

C.  

Waterproof and moisture-proof requirements

D.  

Strength requirements

Discussion 0
Question # 14

Water is regarded as the preferred extinguishing agent for lithium-ion battery fires. Which of the following water characteristics form the basis for this judgment?

Select All that Apply.

Options:

A.  

Usability

B.  

Easy access

C.  

Strong cooling capabilities

D.  

Easy transportation to the fire scene.

Discussion 0
Question # 15

Which of the following enablement tools can help support high-quality delivery in project delivery?

Options:

A.  

Scene-based

B.  

Smart wizard tool

C.  

Smart assistant

D.  

All of the above

Discussion 0
Question # 16

After batteries have been fully discharged, recharge them promptly to prevent damage caused by overdischarge.

Options:

A.  

True

B.  

False

Discussion 0
Question # 17

Which of the following statements are incorrect regarding the “capability of safety and quality planning” within the “four capabilities” of SQA professional skills?

Select All that Apply.

Options:

A.  

SQA is the primary owner for project quality planning.

B.  

Quality planning is the process of identifying and developing quality objectives for projects and products, as well as the techniques, processes, tools, key measures, etc., required to achieve these objectives and to ensure that the end result meets customer requirements.

C.  

Quality planning is independently completed by the SQ

A.  

D.  

With delivery as the ultimate goal, make the requirements clear to the team in advance by planning activities. Preparedness ensures success, while unpreparedness spells failure.

Discussion 0
Question # 18

Which of the following statements are incorrect about “Do the right thing at the first time.” in Digital Power’s quality guideline?

Select All that Apply.

Options:

A.  

In practice, we should not be too rigidly attached to the process, and we can skip the process when necessary.

B.  

We should understand and comply with processes, strictly follow processes, and ensure the certainty on results through the certainty on processes.

C.  

Doing the right thing means that we are adopting a right tactical approach.

D.  

We should continuously improve capabilities, be open to learning, and consolidate the iron triangle featuring the mutual reinforcement of organizations, capabilities, and processes, building a process- and capability-based organization.

Discussion 0

H20-688_V1.0 PDF

H20-688_V1.0 PDF (Printable)
$46.5
$154.99

H20-688_V1.0 Testing Engine

H20-688_V1.0 PDF (Printable)
$51
$169.99

H20-688_V1.0 PDF + Testing Engine

H20-688_V1.0 PDF (Printable)
$63.9
$212.99

Free Exams Sample Questions