Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

LEED-AP-O+M LEED AP Operations + Maintenance (LEED AP O+M) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

LEED-AP-O+M Practice Questions

LEED AP Operations + Maintenance (LEED AP O+M)

Last Update 2 days ago
Total Questions : 166

Dive into our fully updated and stable LEED-AP-O+M practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-O+M. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-O+M PDF

LEED-AP-O+M PDF (Printable)
$43.75
$124.99

LEED-AP-O+M Testing Engine

LEED-AP-O+M PDF (Printable)
$50.75
$144.99

LEED-AP-O+M PDF + Testing Engine

LEED-AP-O+M PDF (Printable)
$63.7
$181.99
Question # 11

What must the project team do in order to maximize the reduction in operational costs with regard to Sustainable Sites Credit, Site Improvement Plan?

Options:

A.  

Reduce lawn areas

B.  

Increase habitat diversity

C.  

Increase green space for occupants

D.  

Improve water quality of runoff from rainwater

Discussion 0
Question # 12

Which strategies allow the project to achieve maximum points under Location and Transportation Credit, Alternative Transportation?

Options:

A.  

Implement an alternative transportation program and conduct a transportation survey

B.  

Conduct a week long observation of the parking lot usage and estimate the alternative transportation ate

C.  

Conduct a transportation survey and demonstrate that the alternative transportation rate has been met

D.  

Implement an alternative transportation program and estimate the alternative transportation rate

Discussion 0
Question # 13

A LEED AP performs several on-site reviews for LEED compliance and encounters the following scenarios. Which scenario requires the installation of additional meters to comply with Energy and Atmosphere Prerequisite, Building-Level Energy Metering?

Options:

A.  

A school whose electricity usage is being measured and invoiced by the local electrical utility

B.  

A building plus its addition whose electricity and natural gas usage is being measured by the original building's meters

C.  

A data center that receives electricity from a campus plant and whose meters are located at the electrical service entrances

D.  

A building that shares its chilled water usage with other buildings on a campus and whose chilled water consumption is measured at the campus level

Discussion 0
Question # 14

Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit,Site Improvement

Plan?

Options:

A.  

Soils

B.  

Hydrology

C.  

Vegetation

D.  

Maintenance equipment

Discussion 0
Question # 15

Which of the following is a feature of the ENERGY STARĀ® Portfolio Manager?

Options:

A.  

Requires input of 36 months of data

B.  

Requires ISO 14001 compliance

C.  

Requires calculation and input of site energy usage

D.  

Requires California Title 24 compliance

Discussion 0
Question # 16

An equipment upgrade requires an initial investment of $1,500.00 USD with a total annual savings of $500.00 and a 33% rate of return. What is the Simple Payback Period for this improvement?

Options:

A.  

120 days

B.  

495 days

C.  

Two years

D.  

Three years

Discussion 0
Question # 17

Who needs to be surveyed for an in-patient hospital project for Location and Transportation Credit, Alternative Transportation: Option 1. Transportation Survey?

Options:

A.  

People visiting patients

B.  

Hospital employees

C.  

Patients being released

D.  

Pharmaceutical representatives

Discussion 0
Question # 18

A property manager is evaluating various bids from pest management services. Which of the following service certifications would assist the existing building in achieving Indoor Environmental Quality Credit, Integrated Pest Management?

Options:

A.  

GreenPro, Ecowise, Greenshield

B.  

Quality Pro, Ecowise, Greenshield

C.  

San Francisco Tier 3, CRI, Green Seal

D.  

Green Seal, San Francisco Tier 3, QualityPro

Discussion 0
Question # 19

Which of the following strategies satisfy the Sustainable Sites Credit, Rainwater Management?\

Options:

A.  

Perform the Small Storm Hydrology method to calculate the runoff volume on 95% of the site

B.  

Minimize impervious cover to be maximum 80% of the site area for the 95th percentile of storm events with design alterations or verification

C.  

Harvest and treat enough rainwater to cover 25% of the impervious surfaces, for the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

D.  

Include rain gardens on the project site for 15% of the of the impervious surfaces, in order to absorb the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

Discussion 0
Question # 20

The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to

equal or be greater than 5%. Which strategy can the team implement to achieve this goal?

Options:

A.  

Install a vegetated roof system

B.  

Convert lawn areas to native plants

C.  

Mitigate the vegetated area off-site through a land trust

D.  

Convert the paved areas of the site to pervious pavement

Discussion 0
Get LEED-AP-O+M dumps and pass your exam in 24 hours!

Free Exams Sample Questions