Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

NS0-527 NetApp Certified Implementation Engineer - Data Protection is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

NS0-527 Practice Questions

NetApp Certified Implementation Engineer - Data Protection

Last Update 1 day ago
Total Questions : 156

Dive into our fully updated and stable NS0-527 practice test platform, featuring all the latest NCIE-Data Protection exam questions added this week. Our preparation tool is more than just a Netapp study aid; it's a strategic advantage.

Our free NCIE-Data Protection practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about NS0-527. Use this test to pinpoint which areas you need to focus your study on.

NS0-527 PDF

NS0-527 PDF (Printable)
$54.25
$154.99

NS0-527 Testing Engine

NS0-527 PDF (Printable)
$59.5
$169.99

NS0-527 PDF + Testing Engine

NS0-527 PDF (Printable)
$74.55
$212.99
Question # 11

You experience a node outage as a result of a component failure in a high-availability (HA) pair. You replace the failed component and get thenode booted up again, but are unable to perform the giveback operation. The

onscreen error is:

"Connected to partner, Takeover is not possible: Storage failover mailbox disk state is invalid, Local node has encountered errors while reading the storage failover partner's mailbox disks. Local node missing partner disks"

What are two ways to solve this problem? (Choose two.)

Options:

A.  

Correct the shelf cabling errors.

B.  

Destroy the root aggregate.

C.  

Correct the failover group configuration.

D.  

Destroy the mailboxes on both nodes.

Discussion 0
Question # 12

Application data needs to be replicated between two FAS9000 clusters running ONTAP 9.7 for DR purposes only. The application has 50 data volumes to be replicated concurrently. You also require that the application can run from the DR site should the production site suffer a disaster.

Question # 12

Referring to the exhibit, what would you use to satisfy therequirements?

Options:

A.  

SnapVault backups can be used to replicate all the application volumes.

B.  

Load sharing can be used to concurrently replicate the data between both systems.

C.  

SnapMirror Synchronous can be used to replicate the all the application volumes.

D.  

SnapMirror can be used to replicate all the data volumes concurrently.

Discussion 0
Question # 13

Your backup cluster reached both the maximum number of parallel replication transfers and the maximum number of FlexVol volumes per node. You need to increase these maximum numbers.

In this scenario, which license you would install on the destination to accomplish this task?

Options:

A.  

SnapRestore License

B.  

SnapMirror Sync License

C.  

Data Protection Optimized License

D.  

SnapVault License

Discussion 0
Question # 14

For DR purposes, data must be replicated between on-premises clusters and multiple public clouds. In this scenario, which solution would simplify management?

Options:

A.  

Cloud Volumes ONTAP

B.  

Cloud Manager

C.  

Cloud Sync

D.  

Cloud Insights

Discussion 0
Question # 15

Which two configurations would be used to protect volumes in a production ONTAP system at twodifferent disaster recovery (DR) locations? (Choose two.)

Options:

A.  

SnapMirror in a fan-out topology

B.  

SVM DR in a cascade topology

C.  

SnapMirror in a cascade topology

D.  

SVM DR in a fan-out topology

Discussion 0
Question # 16

Using ONTAPSystem Manager, you are asked to replicate all the volumes contained in a Storage VM to a remote ONTAP 9.7 system for quick disaster recovery.

Which two steps need to be completed to accomplish this task? (Choose two.)

Options:

A.  

Create a SnapMirror relationshipfor each volume.

B.  

Create a cluster peering relationship.

C.  

Create an SVM-DR relationship.

D.  

Create an SVM peering relationship.

Discussion 0
Question # 17

You are working for a customer that has deployed a large FlexGroup with ONTAP 9.5. This FlexGroup has a SnapMirror relationship to a system at a disaster recovery site. The FlexGroup is nearly full and needs to be expanded to accommodate additional data.

In this scenario, what must you do to expand the FlexGroup and ensure that the data remains protected?

Options:

A.  

Break the SnapMirror relationship, expand the source FlexGroup, and update the SnapMirror.

B.  

Offline the source FlexGroup, add additional volumes, bring it online, and update the SnapMirror.

C.  

Expand the source FlexGroup nondisruptively, and update the SnapMirror.

D.  

Break the SnapMirror relationship, expand the source FlexGroup, and re-baseline the SnapMirror.

Discussion 0
Question # 18

An ONTAP administrator is trying to configure a three-way-disaster recovery solution. Cluster 2 is within 50 km of Cluster 1, the primarycluster, with an RTT of 7 ms. Cluster 3 is over 300 km from Cluster 1 with an RTT of 29 ms.

In this scenario, what are two topologies that would accomplish this task? (Choose two.)

Options:

A.  

a cascade topology from Cluster 1 to Cluster 2 with SnapMirror Synchronous, and then SnapMirror asynchronous from Cluster 2 to Cluster 3

B.  

a fan out topology with SnapMirror Synchronous from Cluster 1 to Cluster 2 and SnapMirror Synchronous to Cluster 3

C.  

a fan out topology with SnapMirror Synchronous from Cluster 1 to Cluster 2 and SnapMirror asynchronous from Cluster 1 to Cluster 3

D.  

a cascade topology from Cluster 1 to Cluster 2 with SnapMirror Synchronous, and then SnapMirror Synchronous from Cluster 2 to Cluster 3

Discussion 0
Question # 19

Click the Exhibit button.

Question # 19

Your customer has recently implemented a FabricPool solution that uses the default configuration. They notice that no data has moved to the cloud tier. Your customer is concerned that FabricPool might not be functioning properly.

Referring to the exhibit, what is causing the problem?

Options:

A.  

The performance tier is not 50% full.

B.  

The performance tier is not 90% full.

C.  

The performance tier is not 75% full.

D.  

The performance tier is not 100% full.

Discussion 0
Question # 20

You received an alert from OnCommand Unified Manager (OCUM) that a NetApp FlexVol is almost out of space. Which three actions are available to perform from the OCUM events detail Web page?

(Choose three.)

Options:

A.  

Acknowledge the event.

B.  

Mark the event as "resolved".

C.  

Create a job to move the FlexVol.

D.  

Increase the capacity of the FlexVol.

E.  

Add a note to the event.

Discussion 0
Get NS0-527 dumps and pass your exam in 24 hours!

Free Exams Sample Questions