New Year Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

1z0-1075-24 Oracle Manufacturing Cloud 2024 Implementation Professional is now Stable and With Pass Result | Test Your Knowledge for Free

1z0-1075-24 Practice Questions

Oracle Manufacturing Cloud 2024 Implementation Professional

Last Update 3 hours ago
Total Questions : 50

Dive into our fully updated and stable 1z0-1075-24 practice test platform, featuring all the latest Manufacturing Cloud exam questions added this week. Our preparation tool is more than just a Oracle study aid; it's a strategic advantage.

Our Manufacturing Cloud practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about 1z0-1075-24. Use this test to pinpoint which areas you need to focus your study on.

1z0-1075-24 PDF

1z0-1075-24 PDF (Printable)
$43.75
$124.99

1z0-1075-24 Testing Engine

1z0-1075-24 PDF (Printable)
$50.75
$144.99

1z0-1075-24 PDF + Testing Engine

1z0-1075-24 PDF (Printable)
$63.7
$181.99
Question # 1

In which three ways does Supply Chain Orchestration enrich supply requests with project details to support outside processing for a project-specific work order?

Options:

A.  

Supply Chain Orchestration initiates the creation of a purchase order without the work order.

B.  

Expenditure Item Date Is set to the requested need-by date and Expenditure Organization is set to the manufacturing plant.

C.  

Expenditure Item Date is set to the receipt date and Expenditure Organization is set to the manufacturing plant.

D.  

Supply Chain Orchestration initiates the creation of a requisition with the project details.

E.  

Expenditure Type is sat to the expenditure type associated to the outside processing Item.

Discussion 0
Question # 2

Your customer is a light assembly manufacturing company that doesn't require shop floor control. A Manufacturing Engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.

Which three steps must they perform and verify in the Work Definition area?

Options:

A.  

Select a resource to be used in automatic work definition by enabling the Default attribute for automatic work definition.

B.  

Ensure the predefined work definition name ORA_MAIN is active.

C.  

Ensure the item is a standard item with a secondary item structure.

D.  

Ensure there is only one default standard operation at any point in time.

E.  

Select a standard operation to be used in automatic work definition by enabling the Default attribute for automatic work definition.

Discussion 0
Question # 3

Which three types of item quantities are displayed on the Work Order History tab?

Options:

A.  

In Process

B.  

Scrapped

C.  

Completed

D.  

Remaining

E.  

Total

Discussion 0
Question # 4

Your customer runs production 24 x 7 x 365 and wants to track Overall Equipment Effectiveness (OEE) online.

Which key setup can they use to achieve this?

Options:

A.  

Enable IoT Fleet Monitoringand enable synchronization to IoT Production Monitoring in Plant Parameters.

B.  

Enable IoT Asset Monitoring and turn on "Enable synchronization to IoT Asset Monitoring" In Plant Parameters.

C.  

Enable IoT Production Monitoring and turn on "Enable synchronization to IoT Production Monitoring" In Inventory Organization.

D.  

Enable IoT Asset Monitoring and turn on "Enable synchronization to IoT Asset Monitoring" in Resources.

E.  

Enable IoT Production Monitoring and turn on "Enable synchronization to IoT Production

Discussion 0
Question # 5

To help ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), your client wants to enable audit trail for manufacturing work definitions and standard operations.

Which is NOT included in the audit trail for standard operations such as creation, update, and deletion?

Options:

A.  

Work definition header and version attributes

B.  

Descriptive flexfields (OFFs) at any level

C.  

Item structure component attributes referenced from Product Information Management(PIM)

D.  

Attachments at any level

E.  

Operation resources. Including alternate resources

Discussion 0
Question # 6

Which three actions can a supervisor perform to annul or correct mistakes in a completed work order, committed by a user while entering work order details?

Options:

A.  

Reverse a Closed order to Open.

B.  

Correct the Product entered at work order.

C.  

Reverse from Scrap to Ready.

D.  

Reverse at an operation.

E.  

Reverse the product at the last operation.

Discussion 0
Question # 7

Which three are Cost accounting methods'

Options:

A.  

Perpetual Average Cost

B.  

Layer Cost, also known as "LIFO"

C.  

Frozen Standard Cost

D.  

Actual Cost, also known as "FIFO"

E.  

Periodic Actual Cost

Discussion 0
Question # 8

A Plant Manager bought several machines for their ABC manufacturing plant. The plant is set up with a separate cost element set, ABC, in Manufacturing Cloud.

How must the Plant Manager configure these machines so that they are costed to the work order for which operations are performed on them?

Options:

A.  

Set up the machines with a cost element type of "Resource" by selecting Cost Element Set Common.

B.  

Set up the machines with a cost element type of "Overhead" by selecting Cost Element Set AB

C.  

C.  

Set up the machines with a cost element type of "Resource" by selecting Cost Element Set AB

C.  

D.  

Set up the machines with a cost element type of "Overhead" by selecting Cost Element Set Common.

Discussion 0
Question # 9

Which statement is NOT true about using a Quick Complete action for an operation transaction?

Options:

A.  

You can use it for simultaneous reporting of one or more transactions.

B.  

It is used on serial tracked operations and non-serial tracked operations with or without inspections.

C.  

You can use It to transact one or more serial numbers.

D.  

You can use it to collect Inspection results.

E.  

You can use it to transact only one serial number at a time.

Discussion 0
Question # 10

In a Manufacturing Cloud implementation, users are finding it difficult to track information about work orders executed across various work centers.

Which three information types in the Work Order Traveler can help users in this situation?

Options:

A.  

Reservation against sales orders

B.  

Hard pegging of items

C.  

Item on-hand quantity

D.  

Work definition details

E.  

Product serial Information

Discussion 0
Get 1z0-1075-24 dumps and pass your exam in 24 hours!

Free Exams Sample Questions