2V0-13.25 Practice Questions
VMware Cloud Foundation 9.0 Architect
Last Update 3 days ago
Total Questions : 97
Dive into our fully updated and stable 2V0-13.25 practice test platform, featuring all the latest VCP-VCF Architect exam questions added this week. Our preparation tool is more than just a VMware study aid; it's a strategic advantage.
Our free VCP-VCF Architect practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about 2V0-13.25. Use this test to pinpoint which areas you need to focus your study on.
An architect is responsible for designing a new VMware Cloud Foundation (VCF)-based Private Cloud solution. During the requirements gathering workshop with key customer stakeholders, the following information was captured:
• The solution must ensure that all components meet a software version of N-1.
Why would an architect specify the default NSX segment profiles in a VMware Cloud Foundation (VCF) design?
An architect is working on a VMware Cloud Foundation (VCF) architecture design and identified the following requirements:
• The organization is using a third-party virtual appliance that does not support overlay networks.
• The virtual appliance must reside on the same L2 domain as an external physical firewall.
• The virtual appliance also needs access to workloads that are currently hosted on overlay segments provided by NSX.
Which design decision should the architect make to meet these requirements?
During the design workshop, the customer stated the following requirement:
• The solution must comply with the organization's security standards.
Which two design decisions should be included in the logical design for the workload domain? (Choose two.)
Requirement: Ensure all management components are redundant at the component level.
Which design quality should classify this requirement?
An architect is responsible for designing a VMware Cloud Foundation (VCF)-based private cloud for a customer. During the customer requirements gathering workshop, the customer has stated the following:
All Platinum applications/services must have an availability SLA of 99.99%.
All Gold applications/services must have an availability SLA of 99.9%.
All Silver applications/services must have an availability SLA of 99%.
The private cloud must have an availability SLA of 99.9%.
What should the architect recommend to meet the stated requirements?
An architect is designing the network model for a new VMware Cloud Foundation (VCF) solution. During the requirements gathering phase, the customer stated that the VCF solution must comply with the organization's security policy for traffic separation. The customer provided the architect with the following information from the policy:
• The physical network architecture is divided into multiple security zones.
• Traffic is not permitted to traverse between the zones with the exception of pre-approved monitoring tools.
• Physical servers may not be connected to multiple zones via a single network interface.
• Management and Storage traffic must be kept within network zone 1.
• Workload traffic must be kept within network zone 2.
The architect makes a design decision to use two vSphere Distributed Switches per cluster for both the Management and VI Workload domains.
Which two additional design decisions should the architect include in the virtual networking design for the separation of traffic between the vSphere Distributed Switches? (Choose two.)
Requirements and constraints:
3 datacenters within 1 mile radius, high-speed LAN connectivity
Private cloud must be hosted at HQ datacenter
Must protect against datacenter loss with no data loss (RPO = 0)
Which design model meets these requirements?
Which two VCF components are replicated across availability zones in a VMware Cloud Foundation (VCF) Fleet with Disaster Recovery model design with two availability zones?
An organization is evacuating their current datacenter and moving all workloads to a new datacenter. The organization has a total of 800 workloads to move, and the migration must be completed with no downtime within a planned change window that is scheduled to occur in four weeks.
What migration method will meet the requirements?
