Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

2V0-21.23 VMware vSphere 8.x Professional is now Stable and With Pass Result | Test Your Knowledge for Free

2V0-21.23 Practice Questions

VMware vSphere 8.x Professional

Last Update 4 days ago
Total Questions : 107

Dive into our fully updated and stable 2V0-21.23 practice test platform, featuring all the latest VCP-DCV 2023 exam questions added this week. Our preparation tool is more than just a VMware study aid; it's a strategic advantage.

Our free VCP-DCV 2023 practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about 2V0-21.23. Use this test to pinpoint which areas you need to focus your study on.

2V0-21.23 PDF

2V0-21.23 PDF (Printable)
$43.75
$124.99

2V0-21.23 Testing Engine

2V0-21.23 PDF (Printable)
$50.75
$144.99

2V0-21.23 PDF + Testing Engine

2V0-21.23 PDF (Printable)
$63.7
$181.99
Question # 31

An administrator is configuring vSphere Lifecycle Manager to install patches to a vSphere cluster. The cluster runs workload virtual machines (VMs) that are incompatible with vSphere vMotion, and therefore cannot be live migrated between hosts during the installation of the patches.

Which configuration in vSphere Lifecycle Manager will allow the administrator to reduce the downtime associated with the patching operation without migrating the VMs?

Options:

A.  

Enable Distributed Power Management (DPM) and set the VM power state to the suspend to disk option

B.  

Enable Quick Boot and set the VM power state to the suspend to disk option

C.  

Enable vSphere High Availability (HA) admission control and set the VM power state to the suspend to memory option

D.  

Enable Quick Boot and set the VM power state to the suspend to memory option

Discussion 0
Question # 32

An administrator needs to configure a content library solution based on the following information:

•A new corporate virtual machine (VM) template is created every month to include all of the latest patches.

•The new VM template should be downloaded from the primary data center site (London) to two secondary data center sites (Tokyo and New York) as soon as possible.

•There is limited disk space available at one of the secondary data center sites (Tokyo) due to an ongoing data center consolidation project.

Which four steps should the administrator take to configure the content library solution before adding a VM template? (Choose four.)

Options:

A.  

Create a new published content library In each secondary site

B.  

Configure the New York subscribed content library to download content immediately.

C.  

Configure the Tokyo subscribed content library to download content immediately

D.  

Configure the Tokyo subscribed content library to download content when needed

E.  

Create a new published content library at the primary site

F.  

Configure the New York subscribed content library to download content when needed.

G.  

Create a new subscribed content library in each secondary site