Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

400-007 Cisco Certified Design Expert (CCDE v3.1) is now Stable and With Pass Result | Test Your Knowledge for Free

400-007 Practice Questions

Cisco Certified Design Expert (CCDE v3.1)

Last Update 3 days ago
Total Questions : 349

Dive into our fully updated and stable 400-007 practice test platform, featuring all the latest CCDE v3.0 exam questions added this week. Our preparation tool is more than just a Cisco study aid; it's a strategic advantage.

Our free CCDE v3.0 practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about 400-007. Use this test to pinpoint which areas you need to focus your study on.

400-007 PDF

400-007 PDF (Printable)
$139.65
$399

400-007 Testing Engine

400-007 PDF (Printable)
$157.15
$449

400-007 PDF + Testing Engine

400-007 PDF (Printable)
$209.65
$599
Question # 21

A business requirement stating that failure of WAN access for dual circuits into an MPLS provider for a Data Centre cannot happen due to related service credits that would need to be paid has led to diversely routed circuits to different points of presence on the provider’s network. What should a network designer also consider as part of the requirement?

Options:

A.  

Provision of an additional MPLS provider

B.  

Out of band access to the MPLS routers

C.  

Ensuring all related remote branches are dual-homed to the MPLS network

D.  

Dual PSUs & Supervisors on each MPLS router

Discussion 0
Question # 22

An enterprise network has two core routers that connect to 200 distribution routers and uses full-mesh IBGP peering between these routers as its routing method. The distribution routers are experiencing high CPU utilization due to the BGP process. Which design solution is the most cost effective?

Options:

A.  

Implement route reflectors on the two core routers

B.  

Increase the memory on the core routers

C.  

Implement eBGP between the core and distribution routers

D.  

Increase the memory on the distribution routers

E.  

Increase bandwidth between the core routers

Discussion 0
Question # 23

Which two actions must merchants do to be compliant with the Payment Card Industry Data Security Standard (PCI DSS)? (Choose two.)

Options:

A.  

Conduct risk analyses

B.  

Install firewalls

C.  

Use antivirus software

D.  

Establish monitoring policies

E.  

Establish risk management policies

Discussion 0
Question # 24

A network security team observes phishing attacks on a user machine from a remote location. The organization has a policy of saving confidential data on two different systems using different types of authentication. What is the next step to control such events after the security team verifies all users in Zero Trust modeling?

Options:

A.  

Enforce risk-based and adaptive access policies.

B.  

Assess real-time security health of devices.

C.  

Apply a context-based network access control policy for users.

D.  

Ensure trustworthiness of devices.

Discussion 0
Question # 25

A network design includes a long signaling delay in notifying the Layer 3 control plane that an interface has failed. Which two of these actions would reduce that delay? (Choose two.)

Options:

A.  

Increase network stability.

B.  

Reduce the time for the network to reconverge.

C.  

Increase the notification of interface flaps.

D.  

Enable lower data link layer recovery systems to have an opportunity to restore the interface.

Discussion 0
Question # 26

Company XYZ branch offices connect to headquarters using two links, MPLS and Internet. The company wants to design traffic flow so voice traffic uses MPLS and all other traffic uses either link, avoiding process switching. Which technique can be used?

Options:

A.  

Policy-based routing

B.  

Virtual links

C.  

Visualization

D.  

Floating static route

Discussion 0
Question # 27

Various teams in different organizations within an enterprise are preparing low-level design documents using a Waterfall project model. Input from relevant stakeholders was captured at the start of the project, and the scope has been defined. What impact will it have if stakeholders ask for changes before documentation is complete?

Options:

A.  

This provides more opportunity to think outside the box.

B.  

Rework is expected before the delivery.

C.  

Significant effort and time are required.

D.  

This provides a flexible approach to incorporate changes.

Discussion 0
Question # 28

Which two features are advantages of SD-WAN compared to MPLS-based connectivity? (Choose two.)

Options:

A.  

Uses FEC constructs for traffic forwarding, thereby improving efficiency

B.  

Separates infrastructure and policy

C.  

Uses policy-based forwarding of real-time traffic with less complexity

D.  

Unifies the WAN backbone

E.  

Manages failures through backup links

Discussion 0
Question # 29

Cost is often one of the motivators for a business to migrate from a traditional network to a software-defined network. Which design decision is directly influenced by CAPEX drivers?

Options:

A.  

Scalability

B.  

Stability

C.  

Complexity

D.  

Manageability

Discussion 0
Question # 30

How can EIGRP topologies be designed to converge as fast as possible in the event of a point-to-point link failure?

Options:

A.  

Limit the query domain by use of distribute lists.

B.  

Build neighbor adjacencies in a triangulated fashion.

C.  

Build neighbor adjacencies in squared fashion.

D.  

Limit the query domain by use of summarization.

E.  

Limit the query domain by use of default routes.

Discussion 0
Get 400-007 dumps and pass your exam in 24 hours!

Free Exams Sample Questions