Month End Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: merry71

93-Tall-Mass-Timber-Buildings 93-Tall-Mass-Timber-Buildings is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

93-Tall-Mass-Timber-Buildings Practice Questions

93-Tall-Mass-Timber-Buildings

Last Update 1 day ago
Total Questions : 80

Dive into our fully updated and stable 93-Tall-Mass-Timber-Buildings practice test platform, featuring all the latest Special Inspector exam questions added this week. Our preparation tool is more than just a International Code Council study aid; it's a strategic advantage.

Our free Special Inspector practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about 93-Tall-Mass-Timber-Buildings. Use this test to pinpoint which areas you need to focus your study on.

93-Tall-Mass-Timber-Buildings PDF

93-Tall-Mass-Timber-Buildings PDF (Printable)
$46.5
$154.99

93-Tall-Mass-Timber-Buildings Testing Engine

93-Tall-Mass-Timber-Buildings PDF (Printable)
$51
$169.99

93-Tall-Mass-Timber-Buildings PDF + Testing Engine

93-Tall-Mass-Timber-Buildings PDF (Printable)
$63.9
$212.99
Question # 11

Refer to the figure by clicking on the EXHIBIT button above.

Question # 11

Question # 11

In Type IV-B construction, unprotected portions of mass timber as shown in the Figure is limited to an area equal to not more than what percentage of the base floor area?

Options:

A.  

15%

B.  

20%

C.  

30%

D.  

40%

Discussion 0
Question # 12

Each of the following is true regarding the fire-resistance rating for exterior bearing walls except:

Options:

A.  

Type IV-C must be 1 hour

B.  

Type IV-A must be 3 hours

C.  

Type IV-B must be 2 hours

D.  

Type IV-C must be 2 hours

Discussion 0
Question # 13

The maximum allowable height for a Group E building of Type IV-A construction with an automatic sprinkler system in accordance with Section 903.3.1.1 is _____ stories.

Options:

A.  

3

B.  

5

C.  

6

D.  

9

Discussion 0
Question # 14

Which of the following requires periodic special inspection of mass timber elements?

Options:

A.  

bolted connections in Type IV-HT construction

B.  

concealed connections in Type IV-C construction

C.  

erection of mass timber construction in Type IV-HT construction

D.  

adhesive anchors installed in horizontal or upwardly inclined orientation to resist sustained tension loads in Type IV-A construction

Discussion 0
Question # 15

Refer to the figure by clicking on the EXHIBIT button above.

Question # 15

Question # 15

In Type IV-B construction, unprotected portions of mass timber as shown in the Figure are required to be separated by _____ feet.

Options:

A.  

12

B.  

15

C.  

18

D.  

20

Discussion 0
Question # 16

All of the following combustible elements may be used in mass timber buildings except:

Options:

A.  

2 x 6 solid-sawn studs.

B.  

cross-laminated timber (CLT).

C.  

parallel-strand lumber (PSL).

D.  

dowel-laminated timber (DLT).

Discussion 0
Question # 17

Given: A special inspector notices on a mass timber building set of drawings a 8 in. x 8 in. solid sawn nominal dimension lumber element.

The design team has recommended the solid sawn member be replaced with an SCL element.

What minimum SCL size would be correct per the International Building Code?

Options:

A.  

6-3/4 in. x 6-1/4 in.

B.  

7 in. x 7-1/2 in.

C.  

6-3/4 in. x 8-1/4 in.

D.  

8 in. x 8 in.

Discussion 0
Question # 18

Each of the following is true regarding the fire-resistance rating for exterior bearing walls except:

Options:

A.  

Type IV-C must be 1 hour

B.  

Type IV-A must be 3 hours

C.  

Type IV-B must be 2 hours

D.  

Type IV-C must be 2 hours

Discussion 0
Question # 19

Refer to the exhibit by clicking on the EXHIBIT button above.

Question # 19

Given: The connections between the glulam beam and CLT panels all require a fire-resistance rating of 2 hours, and wood cover is designed per AWC Technical Report 10 to provide the entire 2 hours of protection.

The bearing area between the CLT and glulam is the minimum required.

What are the minimum dimensions, in inches, for the wood block shown in red?

Options:

A.  

1.5 x 1.5

B.  

2 x 2

C.  

3 x 3

D.  

4 x 4

Discussion 0
Question # 20

Refer to the figure by clicking on the EXHIBIT button above.

Question # 20

Question # 20

In Type IV-B construction, based on a 900 sq. ft. floor area, a 30 ' room width, and a 12 in. x 18 in. beam as shown in the Figure, the maximum length of the unprotected portion of the mass timber ceiling (dimension X) is _____ feet.

Options:

A.  

2

B.  

4

C.  

6

D.  

8

Discussion 0
Get 93-Tall-Mass-Timber-Buildings dumps and pass your exam in 24 hours!