Concealed spaces in a Type IV-C building must be protected with:

Options:

A.  

sprinklers per NFPA 13.

B.  

a lining of fire-retardant-treated wood.

C.  

the same protection as used for interior spaces in a Type IV-

C.  

D.  

noncombustible materials with at least 40 minutes of assigned protection time.

Discussion 0
Question # 2

In Type IV-C construction, a connection between two members of the primary structural frame supporting a floor is required to be protected to achieve a minimum fire-resistance rating of:

Options:

A.  

1 hour

B.  

1-1/2 hours

C.  

2 hours

D.  

3 hours

Discussion 0
Question # 3

Which of the following is true regarding Type IV-B unprotected portions of mass timber ceilings and walls?

Options:

A.  

All of the mass timber may be exposed.

B.  

None of the mass timber may be exposed.

C.  

20% of the floor area of the ceilings and 40% of the floor area of the walls may be exposed under certain conditions.

D.  

40% of the floor area of the ceilings and 20% of the floor area of the walls may be exposed under certain conditions.

Discussion 0
Question # 4

In mass timber construction of Type IV-C, the fire-resistance ratings of bearing walls are permitted to be reduced by _____ where supporting a roof only.

Options:

A.  

30-minutes

B.  

45-minutes

C.  

1-hour

D.  

2-hours

Discussion 0
Question # 5

Refer to the figure by clicking on the EXHIBIT button above.

Question # 5

Question # 5

In Type IV-B construction, unprotected portions of mass timber as shown in the Figure is limited to an area equal to not more than what percentage of the base floor area?

Options:

A.  

15%

B.  

20%

C.  

30%

D.  

40%

Discussion 0
Question # 6

The time, in minutes, contributed to the fire resistance rating by the noncombustible protection of mass timber building elements, components, or assemblies, shall be established through a comparison of assemblies tested using procedures set forth in ASTM Standard:

Options:

A.  

E114

B.  

E119

C.  

E920

D.  

D3498

Discussion 0
Question # 7

Which of the following is an acceptable alternative for protecting structural connections from fire in Type IV-A, IV-B or IV-C construction?

Options:

A.  

Testing of connections in accordance with ASTM E136

B.  

Limiting connections to those incorporating wood-on-wood bearing

C.  

Using connectors that are rated by the manufacturer for fire performance

D.  

Engineering analysis showing limited temperature rise at the connector for the required fire-resistance time of connected members

Discussion 0
Question # 8

In mass timber construction of Type IV-C, the fire-resistance ratings of bearing walls are permitted to be reduced by _____ where supporting a roof only.

Options:

A.  

30-minutes

B.  

45-minutes

C.  

1-hour

D.  

2-hours

Discussion 0
Question # 9

Which of the following is true regarding fire-resistance rating protection provided by noncombustible covering material?

Options:

A.  

1/2 in. gypsum board provides 30 minutes

B.  

1/2 in. Type X gypsum board provides 40 minutes

C.  

5/8 in. gypsum board provides 40 minutes

D.  

5/8 in. Type X gypsum board provides 40 minutes

Discussion 0
Question # 10

What fire-resistance rating is required for floors in Type IV-A, IV-B and IV-C construction?

Options:

A.  

1 hour

B.  

2 hours

C.  

3 hours

D.  

4 hours

Discussion 0

93-Tall-Mass-Timber-Buildings PDF

93-Tall-Mass-Timber-Buildings PDF (Printable)
$54.25
$154.99

93-Tall-Mass-Timber-Buildings Testing Engine

93-Tall-Mass-Timber-Buildings PDF (Printable)
$59.5
$169.99

93-Tall-Mass-Timber-Buildings PDF + Testing Engine

93-Tall-Mass-Timber-Buildings PDF (Printable)
$74.55
$212.99
Exams4sure Dumps

Exam style questions across every 93-Tall-Mass-Timber-Buildings domain

Last Update 4 days ago
Total Questions : 80

Start with our free 93-Tall-Mass-Timber-Buildings practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real Special Inspector exam. Each 93-Tall-Mass-Timber-Buildings exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your International Code Council weak domains, see where you're losing marks, and build a focused study plan in minutes.

Free Exams Sample Questions