Certified CMMC Professional (CCP) Exam

Last Update 3 days ago
Total Questions : 228

Dive into our fully updated and stable CMMC-CCP practice test platform, featuring all the latest CMMC exam questions added this week. Our preparation tool is more than just a Cyber AB study aid; it's a strategic advantage.

Our free CMMC practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about CMMC-CCP. Use this test to pinpoint which areas you need to focus your study on.

CMMC-CCP PDF

CMMC-CCP PDF (Printable)
$43.75
$124.99

CMMC-CCP Testing Engine

CMMC-CCP PDF (Printable)
$50.75
$144.99

CMMC-CCP PDF + Testing Engine

CMMC-CCP PDF (Printable)
$63.7
$181.99
Question # 31

Within what amount of time MUST convictions, guilty pleas, or no contest pleas to crimes of fraud, larceny, embezzlement, misappropriation of funds, misrepresentation, perjury, false swearing, conspiracy to conceal, or a similar offense in any legal proceeding, civil or criminal, whether or not connected with activities that relate to carrying out a Lead Assessor role, be reported to the CMMC Accreditation Body?

Options:

A.  

90 days.

B.  

30 days.

C.  

3 days.

D.  

7 days.

Discussion 0
Question # 32

Who makes the final determination of the assessment method used for each practice?

Options:

A.  

CCP

B.  

osc

C.  

Site Manager

D.  

Lead Assessor

Discussion 0
Question # 33

Two assessors cannot agree if a certain practice should be rated as MET or NOT MET. Who should they consult to determine the final interpretation?

Options:

A.  

C3PAO

B.  

CMMC-AB

C.  

Lead Assessor

D.  

Quality Assurance Assessor

Discussion 0
Question # 34

During Phase 4 of the Assessment process, what MUST the Lead Assessor determine and recommend to the C3PAO concerning the OSC?

Options:

A.  

Ability

B.  

Eligibility

C.  

Capability

D.  

Suitability

Discussion 0
Question # 35

A Lead Assessor is ensuring all actions have been completed to conclude a Level 2 Assessment. The final Assessment Results Package has been properly reviewed and is ready to be uploaded. What other materials is the Lead Assessor responsible for maintaining and protecting?

Options:

A.  

Any additional notes and information from the Assessment

B.  

A final assessment plan, and a Quality Control report from C3PAO

C.  

A final assessment plan, and a letter from the Lead Assessor explaining the process

D.  

A final assessment plan, a letter from the Lead Assessor explaining the results, and a Quality Control report from C3PAO

Discussion 0
Question # 36

Which NIST SP defines the Assessment Procedure leveraged by the CMMC?

Options:

A.  

NIST SP 800-53

B.  

NISTSP800-53a

C.  

NIST SP 800-171

D.  

NISTSP800-171a

Discussion 0
Question # 37

In performing scoping, what should the assessor ensure that the scope of the assessment covers?

Options:

A.  

All assets documented in the business plan

B.  

All assets regardless if they do or do not process, store, or transmit FCI/CUI

C.  

All entities, regardless of the line of business, associated with the organization

D.  

All assets processing, storing, or transmitting FCI/CUI and security protection assets

Discussion 0
Question # 38

The practices in CMMC Level 2 consists of the security requirements specified in:

Options:

A.  

NISTSP 800-53.

B.  

NISTSP 800-171.

C.  

48 CFR 52.204-21.

D.  

DFARS 252.204-7012.

Discussion 0
Question # 39

For the purpose of determining scope, what needs to be included as part of the assessment but would NOT receive a CMMC certification unless an enterprise assessment is conducted?

Options:

A.  

ESP

B.  

People

C.  

Test equipment

D.  

Government property

Discussion 0
Question # 40

A C3PAO has conducted a CMMC Level 2 Assessment for an OS

C.  

The results have been reviewed by a CMMC Quality Assurance Professional. What is the final step in the process of submitting assessment results?

Options:

A.  

The C3PAO submits the results to the CMMC-A

B.  

B.  

The OSC submits the results, as provided by the Lead Assessor, to the CMMC-A

B.  

C.  

The C3PAO submits the results to Enterprise Mission Assurance Support Service.

D.  

The Lead Assessor submits the results to the CMMC-A

B.  

Discussion 0