Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Construction-Manager Certified Construction Manager (CCM) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

Construction-Manager Practice Questions

Certified Construction Manager (CCM)

Last Update 3 days ago
Total Questions : 65

Dive into our fully updated and stable Construction-Manager practice test platform, featuring all the latest Certified Construction Manager exam questions added this week. Our preparation tool is more than just a CMAA study aid; it's a strategic advantage.

Our free Certified Construction Manager practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about Construction-Manager. Use this test to pinpoint which areas you need to focus your study on.

Construction-Manager PDF

Construction-Manager PDF (Printable)
$43.75
$124.99

Construction-Manager Testing Engine

Construction-Manager PDF (Printable)
$50.75
$144.99

Construction-Manager PDF + Testing Engine

Construction-Manager PDF (Printable)
$63.7
$181.99
Question # 11

= P × [(C + T + Q) + 3]

P is Probability

C is Cost

T is Time

Q is Quality

This equation best describes a(n)

Options:

A.  

overall risk score.

B.  

cost time quality evaluation.

C.  

risk variable score.

D.  

Monte Carlo simulation equation.

Discussion 0
Question # 12

When applying BIM to a project, which method checks for interferences by searching for intersecting volumes?

Options:

A.  

BIM Integration

B.  

Parametric Modeling

C.  

Virtual Design and Construction (VDC)

D.  

Clash Detection

Discussion 0
Question # 13

A project manager is working on a new transit station project. This client has never used an agency CM before. The project manager wishes to engage the client in defining the scope, budget, schedule, environmental conditions, and basic systems to be utilized. Which of the following would be MOST useful in engaging the client and defining the project requirements?

Options:

A.  

Quality Management Plan

B.  

Project Procedures Manual

C.  

Kickoff Partnering Meeting

D.  

Project Management Plan

Discussion 0
Question # 14

Which of the following statements BEST describes the recommended approach CMs should take with respect to building information modeling (BIM)?

Options:

A.  

The CM should assure the owner has considered using BIM.

B.  

The CM should not recommend the use of BIM.

C.  

The CM should require the owner to use BIM.

D.  

The CM should not discuss BIM unless requested by the owner.

Discussion 0
Question # 15

What are the essential components of the Risk Management process?

Options:

A.  

Avoiding, mitigating, transferring, accepting

B.  

Avoiding, tracking, mitigation, transferring

C.  

Communicating and reporting, assessing, mitigation, tracking

D.  

Communicating and reporting, tracking, mitigation, resolution

Discussion 0
Question # 16

An agency CM is overseeing the construction of a large, complex multi-story, high security building in a remote area. The building had a specialized spire installed at the top, which serves as an encrypted signal transmitter. Construction is complete and the contractor has de-mobilized, but then it is discovered that the signal transmitter is not transmitting the signal. The owner's QC plan required testing for the functionality of the transmitter, but the contractor has not shown test results reflecting adequate performance. Who is responsible for the cost of remobilization?

Options:

A.  

Designer of record

B.  

Agency CM

C.  

Contractor

D.  

Owner

Discussion 0
Question # 17

During the design review process for a rehabilitation of a corporate office headquarters, the CM should routinely review the designers' submissions, and the reviews will include

Options:

A.  

budget, schedule, and value engineering reviews.

B.  

scope, constructability, and biddability reviews.

C.  

constructability, biddability, and operability reviews.

D.  

constructability, schedule, and maintenance reviews.

Discussion 0
Question # 18

If it can be proven that there was discrimination based on gender during the hiring process, someone may lose their CCM credential due to a violation of the

Options:

A.  

owner's diversity requirements.

B.  

owner's contract requirements.

C.  

CMAA Code of Professional Conduct.

D.  

CMAA Standards of Practice.

Discussion 0
Question # 19

Program management includes the early participation of the program manager in developing and making which of the following types of decisions that become the basis of a capital improvement program?

Options:

A.  

Business

B.  

Safety

C.  

Staffing

D.  

Jurisdictional

Discussion 0