Pre-Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Free Excellence in Design for Greater Efficiencies (EDGE Expert) Exam Practice Questions

Exams4sure Dumps

Exam style questions across every EDGE-Expert domain

Last Update 1 day ago
Total Questions : 110

Start with our free EDGE-Expert practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real GBCI EDGE exam. Each EDGE-Expert exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your EDGE weak domains, see where you're losing marks, and build a focused study plan in minutes.

EDGE-Expert PDF

EDGE-Expert PDF (Printable)
$54.25
$154.99

EDGE-Expert Testing Engine

EDGE-Expert PDF (Printable)
$59.5
$169.99

EDGE-Expert PDF + Testing Engine

EDGE-Expert PDF (Printable)
$74.55
$212.99
Question # 21

Energy consumption calculations in EDGE are based on:

Options:

A.  

Hourly simulation.

B.  

Steady state calculations.

C.  

Quasi-steady state calculations.

D.  

Cooling and heating degree days.

Discussion 0
Question # 22

Which of the following is an accurate statement regarding record keeping for an EDGE Auditor?

Options:

A.  

Auditor should send all the records to the Client to be stored.

B.  

Auditor should review the project documents but does not need to keep the records.

C.  

Auditor should keep the electronic format of the information about the project submission.

D.  

Auditor should pass the electronic format and all the hard copies to the EDGE Partner and not keep records.

Discussion 0
Question # 23

A project certificate that meets the EDGE Zero Carbon criteria fully on-site providing generation of on-site renewable electricity, will expire every

Options:

A.  

two years.

B.  

three years.

C.  

four years.

D.  

five years.

Discussion 0
Question # 24

Which of the following activities is NOT part of the EDGE Expert’s scope of work for a building project?

Options:

A.  

Clients’ EDGE certification applications facilitation

B.  

Provision of informal, basic training on using the EDGE App

C.  

EDGE audit services and issuance of preliminary or final EDGE certificates

D.  

Assistance in understanding green design principles, and the EDGE standard, software, and certification system

Discussion 0
Question # 25

A site audit must take place within how many months of the project’s practical completion date?

Options:

A.  

12 months

B.  

18 months

C.  

24 months

D.  

36 months

Discussion 0
Question # 26

Waste heat recovered from generators can NOT be a source of energy for

Options:

A.  

space heating.

B.  

mechanical ventilation.

C.  

space cooling.

D.  

water heating.

Discussion 0
Question # 27

Client has provided the specification as per the image for low flow shower heads. What is the flow rate for shower heads that should have been entered to EDGE software?

Options:

A.  

4

B.  

6

C.  

1,315

D.  

3,590

Discussion 0
Question # 28

In the EDGE software, which of the following methodologies is used for energy calculations?

Options:

A.  

Quasi-steady-state model

B.  

Dynamic Simulation model

C.  

Actual energy data from field survey

D.  

Look-up tables of benchmarks Rules of thumb

Discussion 0
Question # 29

The Client has sent a copy of the local occupancy permit for a project being audited. This permit:

Options:

A.  

Does not replace the need to audit all EDGE measures.

B.  

Replaces the need to audit all EDGE measures.

C.  

Does not replace the need for desktop studies.

D.  

Replaces the need to audit EDGE Materials measures.

Discussion 0
Question # 30

EDGE methodology is NOT based on which of the following factors?

Options:

A.  

Climatic conditions of location

B.  

Building type and occupant use

C.  

Design and specifications

D.  

Electricity and water bills

Discussion 0