Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

LEED-AP-Homes LEED AP Homes (Residential) Exam is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

LEED-AP-Homes Practice Questions

LEED AP Homes (Residential) Exam

Last Update 4 days ago
Total Questions : 100

Dive into our fully updated and stable LEED-AP-Homes practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-Homes. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-Homes PDF

LEED-AP-Homes PDF (Printable)
$43.75
$124.99

LEED-AP-Homes Testing Engine

LEED-AP-Homes PDF (Printable)
$50.75
$144.99

LEED-AP-Homes PDF + Testing Engine

LEED-AP-Homes PDF (Printable)
$63.7
$181.99
Question # 11

What is the minimum number of required hours the project team must meet in order to earn the Integrative Process Credit, Option 2: Design Charrette?

Options:

A.  

Four hours

B.  

Six hours

C.  

Eight hours

D.  

Twelve hours

Discussion 0
Question # 12

Energy simu-lation software used for ENERGY STAR Homes certification is approved by the:

Options:

A.  

Department of Energy (DOE)

B.  

U.S. Green Building Council (USGBC)

C.  

Environmental Protection Agency (EPA)

D.  

Residential Energy Services Network (RESNET)

Discussion 0
Question # 13

A project team for a home in a small town is pursuing LEED certification. The home is designed with the following site characteristics:

• The lot is square.

• Three sides of the square lot border undeveloped land.

• The previous home covering 78% of the lot is deconstructed and the new LEED home will be built in its place.

• One full side of the square lot borders a home that was built 10 years before the LEED project.

Compliance with which of the following options, if any, will qualify the home for Location and Transportation Credit, Site Selection?

Options:

A.  

Infill only

B.  

Previously Developed only

C.  

Infill and Previously Developed

D.  

None, this home does not comply with Location and Transportation Credit, Site Selection

Discussion 0
Question # 14

Which important factors must be considered when calculating the design landscape water requirements?

Options:

A.  

Sub-metering, bedding area zones, and shut-off valves

B.  

Vegetation selection, microclimate, and irrigation type

C.  

Soil slope, “no-disturbance” zones, and runoff velocity

D.  

Soil pH, soil compaction, and impervious surfaces

Discussion 0
Question # 15

The Home Energy Rating System (HERS) Index, which measures the energy efficiency of a home, was developed by the:

Options:

A.  

Department of Energy (DOE)

B.  

Environmental Protection Agency (EPA)

C.  

U.S. Green Building Council (USGBC)

D.  

Residential Energy Services Network (RESNET)

Discussion 0
Question # 16

Which of the following products will be eligible for points toward Materials and Resources Credit, Environmentally Preferable Products, Option 1: Local Production?

Options:

A.  

Granite slabs extracted in China and manufactured and installed in New York City

B.  

Wood studs harvested and manufactured in Western Canada and installed in California within a 750 mi. (1,200 km) radius

C.  

Wood studs harvested and manufactured in Mexico within a 98 mi. (158 km) radius of the final installation in New Mexico

D.  

Wooden doors manufactured in Oshkosh, Wisconsin, assembled 1,463 mi. (2,354 km) away in Provo, Utah, and installed 1,246 mi. (2,005 km) away in Austin, Texas

Discussion 0
Question # 17

A proposed 1000 kWh photovoltaic system will achieve two points in the Energy and Atmosphere, Renewable Energy credit. If the client chooses a 2000 kWh system instead, how many points will be achieved?

Options:

A.  

One point

B.  

Two points

C.  

Three points

D.  

Four points

Discussion 0
Question # 18

A gut rehab LEED for Homes project will maintain the building’s existing exterior wall and floor framing. Under Materials and Resources Credit, Environmentally Preferable Products category, these components get credit for being:

Options:

A.  

Recycled

B.  

Reclaimed

C.  

Refurbished

D.  

Restructured

Discussion 0
Question # 19

Which of the following is used to properly size space heating and cooling systems in accordance with LEED for Homes criteria?

Options:

A.  

ASHRAE 62.2

B.  

ACCA Manual J

C.  

SMACNA Publication 69.2

D.  

DOE 2006 HVAC Sizing Guide

Discussion 0
Question # 20

Which of the following information about showers is necessary to calculate Indoor Water Baseline Consumption?

Options:

A.  

Fixture flow rates, number of bedrooms, and bathrooms

B.  

Size of plumbing piping to fixtures, fixture flow rates, and number of bathrooms

C.  

Size of shower compartments, fixture flow rate, and number of shower heads

D.  

Number of recirculating shower systems, fixture flow rates, and number of bedrooms

Discussion 0
Get LEED-AP-Homes dumps and pass your exam in 24 hours!

Free Exams Sample Questions