Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

LEED-AP-Homes LEED AP Homes (Residential) Exam is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

LEED-AP-Homes Practice Questions

LEED AP Homes (Residential) Exam

Last Update 4 days ago
Total Questions : 100

Dive into our fully updated and stable LEED-AP-Homes practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-Homes. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-Homes PDF

LEED-AP-Homes PDF (Printable)
$43.75
$124.99

LEED-AP-Homes Testing Engine

LEED-AP-Homes PDF (Printable)
$50.75
$144.99

LEED-AP-Homes PDF + Testing Engine

LEED-AP-Homes PDF (Printable)
$63.7
$181.99
Question # 21

Looking at the attached table, a project team is aiming for three points in Water Efficiency Credit, Outdoor Water Use. The site contains a total of 57,500 ft² (5,342 m²) of softscape. If the plan has 8,000 ft² (743 m²) of turf grass, what is the minimum area of native or adapted landscape required to achieve the desired three points for this credit?

Turf grass area

Native or adapted plant area

Points

< 60%

> 25%

1

< 40%

> 50%

2

< 20%

> 75%

3

< 5%

> 75%

4

Options:

A.  

38,967 ft² (3,620 m²) of native or adapted plant area

B.  

39,355 ft² (3,656 m²) of native or adapted plant area

C.  

43,126 ft² (4,007 m²) of native or adapted plant area

D.  

2,784 ft² (259 m²) of native or adapted plant area

Discussion 0
Question # 22

A project team targets concrete as a material to receive Environmentally Preferable Products credit for fly ash content. Due to weather conditions, the structural engineer suggests reducing the fly ash content in a small portion of the suspended slab areas to speed the curing process and achieve the required strength. The adjusted calculation shows that reduced fly ash in these areas will result in failure to achieve the targeted point. Which of the following is the most effective strategy that the LEED AP could pursue?

Options:

A.  

Submit a CIR requesting the low fly ash suspended slab be removed from the calculations

B.  

Ignore the engineer’s recommendation and proceed with the original design

C.  

Apply for a Regional Priority exemption since the local climate interfered with the project team’s best effort to achieve the point

D.  

Demand the project team slow the construction schedule so additional curing time will allow the required amount of fly ash to be used

Discussion 0
Question # 23

A LEED for Homes project is located in an area heavily infested with termites. A project could earn Sustainable Sites Credit, Nontoxic Pest Control for employing which of the following design strategies?

Options:

A.  

Installing a code-approved termite barrier

B.  

Installing FSC-certified ipe wood for all decking and stairs

C.  

Installing wood framing that is treated 3 ft. (0.9 m) above the foundation

D.  

Installing landscaping at least 12 in. (0.3 m) away from all parts of the home

Discussion 0
Question # 24

A single-family home meets the Indoor Environmental Quality Credit Prerequisite, Ventilation using a continuous exhaust strategy. Which of the following Indoor Environmental Quality credits are potential credit synergies?

Options:

A.  

Radon Control

B.  

Contaminant Control

C.  

Enhanced Combustion Venting

D.  

Enhanced Ventilation

Discussion 0
Question # 25

The primary purpose of the Thermal Enclosure Checklist is to:

Options:

A.  

Inspect continuity of ductwork and quality of duct insulation

B.  

Inspect continuity of air barriers and quality of insulation installation

C.  

Evaluate site appropriateness for ground-source heat pump installation

D.  

Perform preliminary air infiltration testing prior to HERS rater inspection

Discussion 0
Question # 26

What is the intent of Innovation Prerequisite: Preliminary Rating?

Options:

A.  

To define the credits that can be achieved most cost-effectively

B.  

To define the mandatory certification level at the beginning and declare it to all parties

C.  

To maximize opportunities for integrative, cost-effective adoption of green design and construction strategies

D.  

To encourage exceptional performance for current credits and promote innovative performance in pioneering areas

Discussion 0
Question # 27

A project has a 2,500 ft² (232 m²) roof, 200 ft² (18.58 m²) uncovered patio, 100 ft² (9 m²) walkway, and 800 ft² (74 m²) driveway. The designer has selected ENERGY STAR qualified roofing material for 100% of the roof and open grid pavers (with 30% grass) for the patio and walkway. The driveway is gray concrete with an SR of 0.20. What is the percentage of non-absorptive hardscape material, rounded to the nearest whole number (if necessary)?

Options:

A.  

72%

B.  

75%

C.  

94%

D.  

98%

Discussion 0
Question # 28

Which of the following educational tools in a multi-family apartment building must be used to satisfy Energy and Atmosphere Prerequisite, Education of the Homeowner, Tenant, or Building Manager?

Options:

A.  

Signs on easels in the leasing center describing the sustainable features in each apartment

B.  

A one-hour walk-through with the building manager explaining function, operation, and maintenance of equipment

C.  

A weekly meeting with tenants to raise any issues with building performance

D.  

Placards immediately adjacent to common area equipment promoting energy and water efficiency of the project

Discussion 0
Question # 29

The project team is planning trades training to meet requirements for the Integrative Process Credit, Option 2: Trades Training. How many hours are required to earn this credit?

Options:

A.  

Four hours

B.  

Six hours

C.  

Eight hours

D.  

Ten hours

Discussion 0
Question # 30

The design charrette must occur no later than which phase in order to earn the Integrative Process Credit, Option 2: Design Charrette?

Options:

A.  

Bid Solicitation

B.  

Schematic Design

C.  

Design Development

D.  

Construction Drawings

Discussion 0
Get LEED-AP-Homes dumps and pass your exam in 24 hours!

Free Exams Sample Questions