LEED-AP-ND Practice Questions

LEED AP Neighborhood Development (LEED ND)

Last Update 2 days ago
Total Questions : 100

Dive into our fully updated and stable LEED-AP-ND practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-ND. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-ND PDF

LEED-AP-ND PDF (Printable)
$43.75
$124.99

LEED-AP-ND Testing Engine

LEED-AP-ND PDF (Printable)
$50.75
$144.99

LEED-AP-ND PDF + Testing Engine

LEED-AP-ND PDF (Printable)
$63.7
$181.99
Question # 11

A mixed-use development's total building area is 1.742.400 ft1 (161 874 m2) with 350 planned dwelling units Within a 1/2 mi. (08 km) walking distance are 20 diverse uses totaling 550.000 ft2 (51 096 m2) and 375 full-time jobs.

To achieve Smart Location and Linkage Credit. Housing and Jobs Proximity, what is the minimum areaof the residential component ofthe project?

A)

Question # 11

B)

Question # 11

C)

Question # 11

D)

Question # 11

Options:

A.  

Option A

B.  

Option B

C.  

Option C

D.  

Option D

Discussion 0
Question # 12

An undeveloped five acres (two hectare) site has a two-acre (0.8 hectare) area sloping al 50%. To achieve SmartLocation and Linkage Credit. Steep Slope Protection, what possible percentage ofthe site could be developed?

Options:

A.  

50%

B.  

65%

C.  

75%

D.  

90%

Discussion 0
Question # 13

For a LEED forNeighborhood Development project thathas yet to earn all land use entitlements, which of thefollowing should the project team pursue to assist with local approvals?

Options:

A.  

Site visit by a GBCI representative

B.  

Endorsement from local USGBC chapter

C.  

LEED for Neighborhood Development: Plan. Letter of Support

D.  

LEED Plaque

Discussion 0
Question # 14

Which strategycontributes to earning points for the Green Infrastructure and Buildings Credit, Indoor Water Use Reduction?

Options:

A.  

Non-potable water for cooling towers

B.  

Dual-flush toilet

C.  

Native vegetation

D.  

Water submeters

Discussion 0
Question # 15

A brand new communityis being constructed on a greenfield site. In order to reduce energy consumption, a district heating and cooling system will be built Which or thefollowing may be excluded from the system to achieve Green Intra structure and Buildings Credit. District Heating and Cooling?

Options:

A.  

Schools

B.  

Hospitals

C.  

Multi-family buildings

D.  

Single-family residences

Discussion 0
Question # 16

Which color of paint has a solar reflectance of one?

Options:

A.  

Black

B.  

White

C.  

Gray at 20%

D.  

Gray at 75%

Discussion 0
Question # 17

A developer has built a snow storage system that uses snow collected in the winter to cool water that serves the neighborhood central plant during the summer.Which credit will this system contribute to?

Options:

A.  

Green Infrastructure and Buildings. Optimize Building Energy Performance

B.  

Green Infrastructure and Buildings. Outdoor Water Use Reduction

C.  

Green Infrastructure and Buildings Heal Island Reduction

D.  

Green Infrastructure and Buildings. Renewable Energy Production

Discussion 0
Question # 18

The baseline energy use for the Green Infrastructure and Buildings credit. Infrastructure Energy Efficiency is calculated by using

Options:

A.  

current infrastructure items used by IgCC standard.

B.  

the lowest first-cost infrastructure item assumed for the protect

C.  

infrastructure items recommended by the National Lighting Safely institute

D.  

a 15% increase above the minimum requirements for infrastructure items in the state's energy code.

Discussion 0
Question # 19

To develop within a 100-year flood plain and still meet the requirements of Smart Location and Linkage Prerequisite. Floodplain Avoidance, the project team must comply with the National Flood Insurance Program (NFIP) and locate the project

Options:

A.  

near diverse uses.

B.  

or an adjacent site.

C.  

on a previously distributed alto

D.  

within a transit-oriented development.

Discussion 0
Question # 20

What Is the existing or granted right to use property for specific types and quantities of land uses?

Options:

A.  

Entitlement

B.  

Building Permit

C.  

Development Agreement

D.  

Certificate of Occupancy

Discussion 0