LEED-AP-ND Practice Questions

LEED AP Neighborhood Development (LEED ND)

Last Update 2 days ago
Total Questions : 100

Dive into our fully updated and stable LEED-AP-ND practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-ND. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-ND PDF

LEED-AP-ND PDF (Printable)
$43.75
$124.99

LEED-AP-ND Testing Engine

LEED-AP-ND PDF (Printable)
$50.75
$144.99

LEED-AP-ND PDF + Testing Engine

LEED-AP-ND PDF (Printable)
$63.7
$181.99
Question # 21

The LEED for Neighborhood DevelopmentRating System considers which ofthe following to be a circulation network?

Options:

A.  

Dedicated rights-of-way for fixed-rail transit service

B.  

Entrance and exit ways for vehicular use into and out of parking lots or structures

C.  

All motorizednon-motorized and mixed-mode travel ways permanently accessible in thepublic

D.  

Spaces dedicated to non-motorized travel for project occupants to use for travel between buildings

Discussion 0
Question # 22

To meet the requirement of Smart Location and Linkage Credit. Access to Quality Transit, on a

600-ace 1243 hectares) site with 3,500 dwelling units, what Is the minimum number of units that must be within 1/4 mi. (400 m) walk distance of an existing streetcar stop?

Options:

A.  

350 unite

B.  

1,050 units

C.  

1,400 units

D.  

1,750 units

Discussion 0
Question # 23

According to Green Infrastructure and Buildings Prerequisite. Indoor Waler Use Reduction, the indoor water usage of a new building or buildings undergoing major renovations (nonresidential buildings, mixed-use buildings, and multifamily tour stones or more), must average at least

Options:

A.  

10% less than in baseline buildings.

B.  

20% less thanin baseline buildings.

C.  

30% loss than in baseline buildings

D.  

50% less than in baseline buildings.

Discussion 0
Question # 24

What Is the maximum distance from the project’s geographic center thata community garden outside the project boundary can be located in order to satisfy the requirement for Neighborhood Pattern and Design Credit,Local Food Production?

A)

Question # 24

B)

½ mi. (0.8 km)

C)

Question # 24

D)

Question # 24

Options:

A.  

Option A

B.  

Option B

C.  

Option C

D.  

Option D

Discussion 0
Question # 25

A local zoning code limits density on a residentially-zoned 10-acre (four hectare) parcel to 65 total units The site la outside ofwalking distance to transit service.Howcould this project be eligible for Neighborhood Pattern and Design Prerequisite Compact Development?

Options:

A.  

Dedicate 10% of the total land area as a public park

B.  

Place 15% of the total land area in private roads and streets

C.  

Include 15% of the total land area as a protected community open space easement

D.  

Include a recreation building with a development footprint of at least 1.5 acres (0.6 hectare)

Discussion 0
Question # 26

Which of thefollowing would meet the requirements of an infill site?

Options:

A.  

At least 25% of its Boundary Borders parcels that are each at least 75% previously disturbed

B.  

At least 50% of the land area, exclusive of rights-of-way. within a 1/2 mi. (0.8 km) distance from the project boundary Is previously disturbed

C.  

At least 75% of its boundary borders parcels that are Individually at least 50% previously disturbed, and aggregate are at least 75% previously disturbed

D.  

The site. in combination with bordering parcels, forms an aggregate parcel whose boundary Is 50% bounded by parcels that ore individually at least 75% previously disturbed, and in aggregate are at least 75% previously disturbed

Discussion 0
Question # 27

Which of the following are eligible sources of renewable energy under Green Infrastructure and Buildings Credit. Renewable Energy Production?

Options:

A.  

Passive solar heating strategies offsetting heating energy use

B.  

Cogeneration of electricity and heat using mill residue biomass

C.  

Geothermal energy used in conjunction with a ground-source Moat pump

D.  

Photovoltaic energy generation purchased from an off-site location

Discussion 0
Question # 28

A project calculates an overall annual heating and/or cooling consumption reduction using an energy efficiency model. Whichcredit would this calculation aid in documenting?

Options:

A.  

Green Infrastructure and Buildings Credit. Heat Island Reduction

B.  

Green Infrastructure and Buildings Credit. Solar Orientation

C.  

Green Infrastructure and Buildings Credit. District Heating and Cooling

D.  

Green Infrastructure and Buildings Credit. Infrastructure Energy Efficiency

Discussion 0
Question # 29

A project site would automatically comply with Smart Location and Linkage Prerequisite. Wetland and Water Body Conservation if the project site is

Options:

A.  

An infill site

B.  

An adjacent site

C.  

A brownfield redevelopment.

D.  

On previously distributed land

Discussion 0
Question # 30

The LEED for Neighborhood Development project team needs to prepare a flood map as an exhibit tor an upcoming zoningcommissioning meeting. Which ofthe following government agencies provides this data?

Options:

A.  

U.S. Environmental Protection Agency (EPA) or local equivalent for protects outside of the U.S

B.  

Federal Emergency Management Agency (FEMA) or local equivalent for projects outside of the U.S.

C.  

Department of Housing and Urban Development (HUD) or local equivalent for projects outside of the US

D.  

U.S. Department of the Interior (DOI) or local equivalent for projects outside of the U.S.

Discussion 0