NCP-BC-7.5 Practice Questions
Nutanix Certified Professional - Business Continuity (NCP-BC) 7.5
Last Update 2 days ago
Total Questions : 109
Dive into our fully updated and stable NCP-BC-7.5 practice test platform, featuring all the latest NCP-BC exam questions added this week. Our preparation tool is more than just a Nutanix study aid; it's a strategic advantage.
Our free NCP-BC practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about NCP-BC-7.5. Use this test to pinpoint which areas you need to focus your study on.
When designing a Disaster Recovery strategy to an NC2 cluster using MST, which technical limitation impacts the Recovery Plan and workload compatibility?
An administrator is tasked with ensuring the VMs do not experience downtime during an upcoming network maintenance on the primary cluster. The VMs are protected by a Protection Policy and are configured under a Recovery Plan. What failover mechanism should the administrator use to ensure the VMs are available on the target cluster before the maintenance window?
An administrator is managing a Nutanix environment via Prism Central and has two VMs running on AHV:
" ERP-PROD " : A mission-critical VM protected by a Synchronous replication schedule (0 RPO) to a secondary site.
" REPORTING-DEV " : A non-critical VM protected by an Asynchronous replication schedule (hourly RPO) to the same secondary site.
Following a corrupted application update, the administrator decides to manually recover both VMs locally.
What will be the outcome of this manual recovery attempt?
A security team has detected a ransomware attack that began encrypting files on the primary site at 2:00 AM. By 2:45 AM, the primary site is still accessible but workloads are compromised. The administrator needs to recover to a known-good state from before the attack.
Which statement shows the action and reasoning that the administrator should consider?
Recently, several new VMs were deployed as part of an application expansion. Within 24 hours, the administrator notices no recovery points are being created for the new VMs.
During investigation, the administrator observes:
Existing VMs in the Protection Policy continue to replicate successfully.
No replication task failures are reported.
Network connectivity between clusters is healthy.
Storage capacity at the remote site is sufficient.
The Protection Policy uses category-based entity selection.
The newly deployed VMs were provisioned by a separate team.
What is the most likely root cause of the issue?
Which native Nutanix tool is used to determine connectivity between two sites during disaster recovery testing?
During the Recovery Plan configuration, the administrator maps the " Test Network " setting to the " Production Network " VLAN on the Recovery Site. What is the expected outcome when the administrator executes a Test Failover for this plan?
An administrator is planning a scheduled maintenance window that will temporarily interrupt network connectivity between the primary and recovery sites. Several Tier 1 VMs are protected with a Synchronous replication Protection Policy. What must the administrator do before beginning the maintenance window to prevent these VMs from becoming unresponsive without making RPO changes?
