Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

NCP-BC-7.5 Nutanix Certified Professional - Business Continuity (NCP-BC) 7.5 is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

NCP-BC-7.5 Practice Questions

Nutanix Certified Professional - Business Continuity (NCP-BC) 7.5

Last Update 2 days ago
Total Questions : 109

Dive into our fully updated and stable NCP-BC-7.5 practice test platform, featuring all the latest NCP-BC exam questions added this week. Our preparation tool is more than just a Nutanix study aid; it's a strategic advantage.

Our free NCP-BC practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about NCP-BC-7.5. Use this test to pinpoint which areas you need to focus your study on.

NCP-BC-7.5 PDF

NCP-BC-7.5 PDF (Printable)
$43.75
$124.99

NCP-BC-7.5 Testing Engine

NCP-BC-7.5 PDF (Printable)
$50.75
$144.99

NCP-BC-7.5 PDF + Testing Engine

NCP-BC-7.5 PDF (Printable)
$63.7
$181.99
Question # 1

An administrator needs to provide the QA team with a VM state from four days ago to test an older browser version. However, the current production VM contains new application code and security patches that must not be deleted or overwritten. Which restore operation should the administrator perform to meet this requirement?

Options:

A.  

Disk-level Attach from Snapshot

B.  

Self-Service Restore (SSR)

C.  

In-place Restore (Revert)

D.  

Out-of-place Restore (Clone)

Discussion 0
Question # 2

An administrator has set up asynchronous replication between the Marseille and Paris clusters for the VMs in the FIN-PROD storage container. After a planned production failover from Paris to Marseille, the administrator noticed that the VMs were scattered across all the storage containers in the Marseille cluster. Which statement is true regarding this scenario?

Options:

A.  

The recovery plan did not contain a valid network mapping.

B.  

The recovery plan did not contain a valid storage mapping.

C.  

The FIN-PROD storage container does not exist on Marseille cluster.

D.  

A storage policy is setup on the Paris cluster and missing on the Marseille cluster.

Discussion 0
Question # 3

An administrator is troubleshooting a hung replication. When checking the replication status, the complete percent and bytes completed do not increase. The administrator checks the Stargate logs on the destination cluster and confirms the writes are failing with " nfs status 28 " . Checking the container info on the destination cluster, free space on the container is 0. The administrator confirms that there is sufficient space available in the storage pool. What could be the reason for free space on the container to be 0?

Question # 3

Options:

A.  

Advertised capacity is set for the container.

B.  

Replication factor needs to be set to 1.

C.  

Thick Provisioning is consuming all available space.

D.  

Compression is turned off.

Discussion 0
Question # 4

An administrator plans to configure Cross Hypervisor Disaster Recovery (CHDR) to replicate VMs from an ESXi cluster to an AHV cluster using an Asynchronous replication schedule. Which component must be installed on the VMs to ensure successful migration and driver configuration during recovery?

Options:

A.  

VirtIO Drivers manually installed

B.  

Pre-freeze scripts

C.  

VMware Tools only

D.  

Nutanix Guest Tools (NGT)

Discussion 0
Question # 5

An administrator performed an unplanned failover from AZ1 (primary) to AZ2 (recovery). Later, AZ1 is restored and the administrator wants to fail back the entities to AZ1. Which two statements are correct? (Choose two.)

Options:

A.  

Failback uses the same recovery plan, but the failover operations for failback must be performed at the primary AZ.

B.  

Unplanned failover to AZ1 can use recovery points that were created locally in the past at AZ1, even if no recovery points replicate back from AZ2.

C.  

After unplanned failover, replication begins in the reverse direction, and failback success depends on recovery points being replicated back from AZ2 to AZ1 after failover.

D.  

After unplanned failover, failback success depends on recovery points being created locally on AZ1 before outage.

Discussion 0
Question # 6

An administrator builds a single recovery plan that includes workloads protected with Asynchronous (async) and Nearsync replication schedules together with workloads protected by Synchronous replication (syncrep) schedules. Which statement is true regarding this configuration?

Options:

A.  

Mixing schedule types in the recovery plan only affects retention, not recovery success.

B.  

Mixing async and nearsync in the same recovery plan is supported.

C.  

Mixing is supported only for test failovers, but not for planned or unplanned failovers.

D.  

Mixing async and syncrep schedules in one recovery plan is supported.

Discussion 0
Question # 7

A mission-critical VM utilizing an NVIDIA vGPU profile for high-end graphical processing is replicated from a primary Nutanix cluster to a secondary disaster recovery site. After failover of a VM using an NVIDIA vGPU profile, the VM boots but hardware acceleration does not function. What action is required?

Options:

A.  

Disable Nutanix Guest Tools (NGT) to prevent driver conflicts.

B.  

Reinstall the guest operating system to recognize the new hardware I

D.  

C.  

Increase the VM memory allocation to compensate for the lost GPU buffer.

D.  

Manually update the vGPU configuration on the VM at the recovery site

Discussion 0
Question # 8

After performing a failover of encrypted AHV VMs from an on-premises AZ to a recovery AZ, an administrator notices that newly written data is not encrypted. Which post-failover cleanup task must be performed to correct this issue?

Options:

A.  

Enable replication traffic encryption.

B.  

Reassign storage policies and categories.

C.  

Reconfigure the replication schedule.

D.  

Recreate the recovery plan and categories.

Discussion 0
Question # 9

An organization is implementing a Disaster Recovery solution to protect critical workloads by failing them over to a NC2-on-Azure cluster. The administrator needs to ensure that when VMs failover to Azure, their IP addresses are predictable and consistent with the application requirements. Which configuration strategy should the administrator use in the Recovery Plan to achieve predictable IP assignment?

Options:

A.  

Rely on the IPAM networks of the NC2 cluster to maintain the IP assignments.

B.  

Configure custom IP mapping to assign specific IP addresses to the VMs.

C.  

Rely on the default behavior where the last octet of the source IP is preserved.

D.  

Configure In-Guest scripts for NGT to maintain the static IP assignments.

Discussion 0
Question # 10

An administrator is configuring Disaster Recovery between an on-prem availability zone (AZ) and an NC2 cluster hosted in a public cloud. The business requires cross-cluster live migration between on-prem and NC2 without IP changes. Which configuration must be satisfied to meet this requirement?

Options:

A.  

Linear retention configured on the protection policy

B.  

Layer 2 stretching between on-premises and the cloud

C.  

Matching subnet names between on-premises and the cloud

D.  

Synchronous replication configured

Discussion 0
Get NCP-BC-7.5 dumps and pass your exam in 24 hours!

Free Exams Sample Questions