Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

CLSSBB Certified Lean Six Sigma Black Belt (CLSSBB) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

CLSSBB Practice Questions

Certified Lean Six Sigma Black Belt (CLSSBB)

Last Update 14 hours ago
Total Questions : 357

Dive into our fully updated and stable CLSSBB practice test platform, featuring all the latest Lean Six Sigma Black Belt Certification exam questions added this week. Our preparation tool is more than just a GAQM study aid; it's a strategic advantage.

Our free Lean Six Sigma Black Belt Certification practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about CLSSBB. Use this test to pinpoint which areas you need to focus your study on.

CLSSBB PDF

CLSSBB PDF (Printable)
$43.75
$124.99

CLSSBB Testing Engine

CLSSBB PDF (Printable)
$50.75
$144.99

CLSSBB PDF + Testing Engine

CLSSBB PDF (Printable)
$63.7
$181.99
Question # 21

The Graph which helps to identify and prioritize problems to be solved?

Options:

A.  

Control Chart

B.  

Histogram Chart

C.  

Fish Bone Graph

D.  

Pareto Chart

Discussion 0
Question # 22

This QFD matrix was used in the design process for a ball point pen. What symbol is appropriate for the square labeled 2?

Question # 22

Options:

A.  

B.  

C.  

D.  

none of the above

Discussion 0
Question # 23

A six sigma team has gathered data for a project proposal and is using the following notations.

I = Initial investment

C = Periodic maintenance cost

B = Benefits to be accrued

On the basis of the information above, which of the following is the criteria used to select a project?

Options:

A.  

0>+CIB

B.  

1>+CIB

C.  

1≤+CIB

D.  

0≤+CIB

Discussion 0
Question # 24

Lean Enterprise is based on the premise that anywhere work is being done which of these is also occurring?

Options:

A.  

Money is being spent

B.  

Waste is being generated

C.  

Waste is being calculated

D.  

Waste is being eliminated

Discussion 0
Question # 25

A black belt is developing a failure mode and effects analysis (FMEA) for the hamburger preparation station in a fast-food restaurant. The following ratings were developed for the low-heat temperature failure mode.

Severity = 9

Occurrence = 2

Detection = 1

What is the risk priority number (RPN) for this FMEA?

Options:

A.  

4

B.  

6

C.  

12

D.  

18

Discussion 0
Question # 26

After a team has engaged in diversion activities they may need to employ a tool for conversion. Examples of such a tool are:

I. nominal group technique

II. Multivoting

III. cause and effect diagram

IV. activity network diagram

V. matrix diagrams

Options:

A.  

III and IV

B.  

IV and V

C.  

II and III

D.  

I and II

Discussion 0
Question # 27

Find the value of (9) in the ANOVA table. Assume:

Question # 27

Options:

A.  

16.4

B.  

3.2

C.  

18.6

D.  

23.2

E.  

4.54

F.  

12.2

G.  

0.525

Discussion 0
Question # 28

There are 14 different defects that can occur on a completed time card. The payroll department collects 328 cards and finds a total of 87 defects. DPMO =:

Options:

A.  

87 ÷ 328

B.  

87 ÷ (328 × 14)

C.  

14 ÷ 87

D.  

87 ÷ 14 × 1,000,000

E.  

328 ÷ 87

F.  

87 × 1,000,000 ÷ (14 × 328)

Discussion 0
Question # 29

SCENARIO A Six Sigma team is measuring the moisture content of corn starch as it leaves the conveyer belt of a dryer. They collect one sample four cups of starch at times indicated in the chart at fixed locations labeled A, B, C, and D across the end of the belt. See the diagram below.

Question # 29

The data for a nine hour period are:

Question # 29

Question # 29

Which type of variation dominates? (Hint: Plot the points on the graph above.)

Options:

A.  

within sample

B.  

sample to sample within the hour

C.  

hour to hour

D.  

none of the above

Discussion 0
Question # 30

A project that lacks a clear definition of its scope and boundaries runs the risk of:

Options:

A.  

straying from the intended path

B.  

trying to solve unrelated problems

C.  

having difficulty in collecting baseline data

D.  

suffering morale problems

E.  

all the above

F.  

none of the above

Discussion 0