Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

CTS-I Certified Technology Specialist – Installation is now Stable and With Pass Result | Test Your Knowledge for Free

CTS-I Practice Questions

Certified Technology Specialist – Installation

Last Update 4 days ago
Total Questions : 477

Dive into our fully updated and stable CTS-I practice test platform, featuring all the latest AVIXA Communications Certifications exam questions added this week. Our preparation tool is more than just a AVIXA study aid; it's a strategic advantage.

Our free AVIXA Communications Certifications practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about CTS-I. Use this test to pinpoint which areas you need to focus your study on.

CTS-I PDF

CTS-I PDF (Printable)
$43.75
$124.99

CTS-I Testing Engine

CTS-I PDF (Printable)
$50.75
$144.99

CTS-I PDF + Testing Engine

CTS-I PDF (Printable)
$63.7
$181.99
Question # 61

Which test verifies a signal can travel from one end of the cable to the other?

Options:

A.  

Impedance

B.  

Continuity

C.  

Insulation

D.  

Polarity

Discussion 0
Question # 62

A projector weighing 195 kilograms (429 pounds) should be mounted only to what type of surface?

Options:

A.  

Ceiling tile of an auditorium

B.  

Front wall in a classroom

C.  

Drywall in conference room

D.  

Building structural support or blocking

Discussion 0
Question # 63

This conduit type forms a lightweight continuous flexible tube that offers the advantage of EMI protection.

Options:

A.  

PVC

B.  

Thinwall

C.  

Rigid

D.  

Flex

Discussion 0
Question # 64

If you go up one octave from 250 Hz, you arrive at _____.

Options:

A.  

251 Hz

B.  

125 Hz

C.  

500 Hz

D.  

1250 Hz

Discussion 0
Question # 65

What is the first step in conducting a technical site survey?

Options:

A.  

Reviewing drawings with the AV designer

B.  

Recording model and serial numbers of all equipment

C.  

Setting up your GPS with the site location

D.  

Ordering the equipment from the warehouse

Discussion 0
Question # 66

What sort of electrical box should an installer use to house custom screen switches, small touch panels, or microphone plates?

Options:

A.  

Equipment Racks

B.  

Mud Rings

C.  

NEMA Type 4

D.  

Pull boxes

Discussion 0
Question # 67

When is a request for change (RFC) document used?

Options:

A.  

when approval is needed to make changes in contracts, equipment, or system design

B.  

any time documents, drawings, or samples, are sent to a receiving party

C.  

after a change order has been approved and issued

D.  

when questions first arise about an aspect of the project

Discussion 0
Question # 68

Crossover cables are used to connect:

Options:

A.  

digital and analog devices

B.  

devices configured to accept different Data Link layer protocols

C.  

two devices without the use of an electronic crossover device

D.  

a device's NIC to its MAC address

Discussion 0
Question # 69

When preparing to install a ceiling mount, what should you determine before you can determine the projector position?

Options:

A.  

The center of the projector

B.  

The location of the projection surface

C.  

The center of the projector's mount

D.  

The center of the adjustable ceiling support structure

Discussion 0
Question # 70

What does load limit refer to?

Options:

A.  

The maximum wattage capacity of the power supply

B.  

The weight rating of a component that should not be exceeded to avoid mounting failure

C.  

The permissible weight that can be carried onto a job site

D.  

The maximum impedance in a speaker circuit

Discussion 0
Get CTS-I dumps and pass your exam in 24 hours!

Free Exams Sample Questions