Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: merry71

Free Certified Technology Specialist – Installation Practice Questions

Exams4sure Dumps

Exam style questions across every CTS-I domain

Last Update 4 days ago
Total Questions : 477

Start with our free CTS-I practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real AVIXA Communications Certifications exam. Each CTS-I exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your AVIXA weak domains, see where you're losing marks, and build a focused study plan in minutes.

CTS-I PDF

CTS-I PDF (Printable)
$46.5
$154.99

CTS-I Testing Engine

CTS-I PDF (Printable)
$51
$169.99

CTS-I PDF + Testing Engine

CTS-I PDF (Printable)
$63.9
$212.99
Question # 81

You have a cable with a part number "RGB5C-25-CM." What is the wire gauge of this cable?

Options:

A.  

25 AWG

B.  

5 AWG

C.  

25 cm

D.  

250 AWG

Discussion 0
Question # 82

What is industry best practice for ensuring that all equipment has been delivered to the site for an AV event?

Options:

A.  

Selected equipment is matched to the shipping manifest

B.  

One person should be in charge of everything

C.  

All delivery personnel should be assigned a color coded area

D.  

All equipment should be weighed

Discussion 0
Question # 83

Draws the video image on the display in a sequence of lines from top to bottom:

Options:

A.  

Progressive scanning

B.  

Interlaced scanning

C.  

Refresh rate

D.  

Frame rate

Discussion 0
Question # 84

A high pass filter is typically used during equalization for ___.

Options:

A.  

Eliminating potential hissing sounds in the system.

B.  

Removing rumble from an HVAC system.

C.  

Adding emphasis to the lower frequency range.

D.  

Adding hum to the system.

Discussion 0
Question # 85

The purpose of electrical grounding is to _____.

Options:

A.  

ensure safety

B.  

close a circuit

C.  

consume extra power

D.  

save money

Discussion 0
Question # 86

HDCP is capable of working over which of the following interfaces? (Choose all that apply.)

Options:

A.  

DisplayPort

B.  

HDMI

C.  

MHL

D.  

HDBaseT

Discussion 0
Question # 87

What is a dependency within a project task schedule?

Options:

A.  

A task that cannot begin before another task has been completed

B.  

A task that must be completed by a specific date

C.  

A task that will be required if specific conditions occur at the project site

D.  

An optional task that the client can determine is needed once the project is underway

Discussion 0
Question # 88

Besides a power switch, what else can modern amplifiers have?

Options:

A.  

input sensitivity controls and digital signal processing

B.  

line levelers and network monitoring

C.  

distortion suppressors and input sensitivity controls

D.  

voltage regulators and digital signal processing

Discussion 0
Question # 89

A rack elevation diagram includes which of the following information?

Options:

A.  

Location of electrical outlets for technical power

B.  

The distance from the floor the rack should be mounted

C.  

Signal type for each input and output

D.  

RUs used for each component

Discussion 0
Question # 90

What do you typically fasten to the adjustable mounting support?

Options:

A.  

The ceiling grid

B.  

A manufactured ceiling plate or a pipe flange

C.  

The projector, secured by its proper mounting bolts

D.  

The ceiling clips

Discussion 0

Free Exams Sample Questions