Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

FlashArray-Implementation-Specialist Pure Certified FlashArray Implementation Specialist (FAIS) Exam is now Stable and With Pass Result | Test Your Knowledge for Free

FlashArray-Implementation-Specialist Practice Questions

Pure Certified FlashArray Implementation Specialist (FAIS) Exam

Last Update 1 day ago
Total Questions : 234

Dive into our fully updated and stable FlashArray-Implementation-Specialist practice test platform, featuring all the latest FAIS exam questions added this week. Our preparation tool is more than just a Pure Storage study aid; it's a strategic advantage.

Our free FAIS practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about FlashArray-Implementation-Specialist. Use this test to pinpoint which areas you need to focus your study on.

FlashArray-Implementation-Specialist PDF

FlashArray-Implementation-Specialist PDF (Printable)
$43.75
$124.99

FlashArray-Implementation-Specialist Testing Engine

FlashArray-Implementation-Specialist PDF (Printable)
$50.75
$144.99

FlashArray-Implementation-Specialist PDF + Testing Engine

FlashArray-Implementation-Specialist PDF (Printable)
$63.7
$181.99
Question # 1

During a hardware NDU from FlashArray//XR2 or XR3 to an XR4 model, which default service on-board ports are NO longer present in the XR4 controller design?

Options:

A.  

iSCSI

B.  

Replication

C.  

Management

Discussion 0
Question # 2

An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array.

What is the required service depth clearance for the front and rear panels of the FlashArray//XR4?

Options:

A.  

Front panel: 216 mm (8.5 in.), Rear panel: 530 mm (20.9 in.)

B.  

Front panel: 530 mm (20.9 in.), Rear panel: 530 mm (20.9 in.)

C.  

Front panel: 530 mm (20.9 in.), Rear panel: 216 mm (8.5 in.)

D.  

Front panel: 216 mm (8.5 in.), Rear panel: 216 mm (8.5 in.)

Discussion 0
Question # 3

An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X during a controller upgrade. Which command should the Implementation Engineer run on the new controller to determine its model?

Options:

A.  

hwconfig --all

B.  

hwconfig --model

C.  

purearray list --controller

Discussion 0
Question # 4

When accessing the FlashArray GUI, which management IP address is recommended for use?

Options:

A.  

CT1 management IP

B.  

CT0 management IP

C.  

Virtual management IP

D.  

Replication management IP

Discussion 0
Question # 5

Before installing array rails, where should the cage nuts be placed?

Options:

A.  

Lowest square of lowest RU

B.  

Lowest square of top RU

C.  

Top square of the lowest RU

Discussion 0
Question # 6

The Pure Engagement Request (PER) specifies that iSCSI ports ETH2 and ETH3 should be set to 10 Gb/s. After configuring the ports and connecting them to the SAN, the Implementation Engineer observes that ETH2/3 are not negotiating and display 0 b/s. The SAN is operating at 40 Gb/s, with support for up to 100 Gb/s.

What should the Implementation Engineer do to resolve this issue and complete the install?

Options:

A.  

Force negotiate the array iSCSI ports to 40 Gb/s.

B.  

Replace the transceivers with the appropriate type.

C.  

Force negotiate the switch iSCSI ports to 40 Gb/s.

D.  

Restart the Purity operating system to reset the network stack.

Discussion 0
Question # 7

When adding a data pack into a FlashArray chassis or a DFS shelf, the drives show "unrecognized" status when running List. What is the cause of this status on the newly inserted drives?

Options:

A.  

There is a hardware fault that needs to be corrected.

B.  

The drives exceed the max space supported for the controller model.

C.  

The Purity version of the FlashArray/DFS is incompatible with the new drives.

Discussion 0
Question # 8

By default, which network interface does FA File use to resolve and reach domain controllers?

Options:

A.  

replication

B.  

filevip vif

C.  

management

Discussion 0
Question # 9

During a HWNDU, the Implementation Engineer initializes CT0 and runs health checks. They observe 12 fewer iSCSI connections compared to pre-upgrade results. While reviewing port speed and status, the output shows CT0.ETH14 at 0.00 b/s. What is the first action the Implementation Engineer should take to troubleshoot?

Options:

A.  

Swap the SFP from CT0.ETH14 to the unused management port in CT0.ETH5 and re-check port speed.

B.  

Ask the customer to verify which hosts have missing paths and have them reboot the affected hosts.

C.  

Ensure the SFP in CT0.ETH14 is fully-seated on the array and re-seat if necessary.

Discussion 0
Question # 10

An Implementation Engineer is onsite to install a new DirectFlash Shelf on a FlashArray//XL that does NOT have any installed. There is an I/O card installed and in use on the default slot for the first shelf.

Where should the Implementation Engineer install the PCIe card for connectivity?

Options:

A.  

PCIe Slot 8

B.  

PCIe Slot 6

C.  

PCIe Slot 5

D.  

PCIe Slot 2