Free Huawei Certified Pre-sales Associate- Data Center Facility Practice Questions

Question # 1

Which of the following components is included in the UPS5000-E (25-75 kVA)? (Multiple Choice)

Options:

A.  

Input switch

B.  

Output switch

C.  

Battery switch

D.  

Maintenance bypass switch

Discussion 0
Question # 2

The UPS2000-G-20KRTL is rack/tower convertible. The rack-mounted model is () high.

Options:

A.  

1U

B.  

2U

C.  

3U

D.  

4U

Discussion 0
Question # 3

The UPS5000-E (25-75 kVA) supports a maximum of ( ) battery modules.

Options:

A.  

16

B.  

128

C.  

144

D.  

150

Discussion 0
Question # 4

When the UPS5000-S is configured to satisfy N+2 modular redundancy configuration to carry 120 kW loads, a () UPS can be configured.

Options:

A.  

160 kVA

B.  

200 kVA

C.  

240 kVA

D.  

250 kVA

Discussion 0
Question # 5

Which of the following products can be quoted in a configurator? (Multiple Choice)

Options:

A.  

UPS2000-G

B.  

UPS5000-E

C.  

FusionModule2000

D.  

UPS8000

Discussion 0
Question # 6

Which of the following models has the widest input frequency range?

Options:

A.  

Galaxy5000

B.  

NXR

C.  

9390

D.  

UPS5000-A

Discussion 0
Question # 7

Which of the following statements are correct? (Multiple Choice)

Options:

A.  

When configuring the UPS2000-G 15K and apply the 4+0 parallel system, you can use one SNMP card to realize monitoring.

B.  

When configuring the UPS5000-E, you can use an unlimited number of modules in parallel.

C.  

Batteries of different brands and capacities can be used together.

D.  

When configuring the cable, you shall consider the voltage drop in the route.

Discussion 0
Question # 8

The UPS2000-G supports low voltage disconnection. Which of the following is not a function of low voltage disconnection? ()

Options:

A.  

When overload occurs, secondary loads are closed to remove the overload.

B.  

When the UPS2000-G is powered by batteries, secondary loads are closed to prolong the backup time for important loads.

C.  

When the UPS2000-G is powered by batteries, secondary loads are closed for battery protection.

D.  

The purpose of closing secondary loads is to adjust the load ratio and optimize the operating efficiency.

Discussion 0
Question # 9

Which of the following is the operating principle of the UPS2000-G? ()

Options:

A.  

Online interactive UPS

B.  

Online dual-conversion

C.  

Standby

D.  

Delta conversion

Discussion 0
Question # 10

The UPS5000-E (25-125 kVA) power module height is (),and the system efficiency is ().

Options:

A.  

3U,95.5%

B.  

3U, 96%

C.  

2U,95.5%

D.  

2U,96%

Discussion 0

H19-311 PDF

H19-311 PDF (Printable)
$54.25
$154.99

H19-311 Testing Engine

H19-311 PDF (Printable)
$59.5
$169.99

H19-311 PDF + Testing Engine

H19-311 PDF (Printable)
$74.55
$212.99
Exams4sure Dumps

Exam style questions across every H19-311 domain

Last Update 2 days ago
Total Questions : 225

Start with our free H19-311 practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real HCS-Pre-sales exam. Each H19-311 exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your Huawei weak domains, see where you're losing marks, and build a focused study plan in minutes.

Free Exams Sample Questions