Free IASSC Lean Six Sigma – Black Belt Practice Questions

Question # 11

In a good Measurement System the most variation will be with part-to-part measurements. What should you do if the majority of variation is associated with the Gage R&R assuming the gage is technically capable?

Options:

A.  

Focus on fixing the Repeatability and Reproducibility of the measurement device

B.  

Purchase a new machine

C.  

Focus on trimming the Part-to-Part variation

D.  

Run another MSA test with the machine

Discussion 0
Question # 12

Sally and Sara sell flower pots at their garage sale. Martha motivates Rose mentioning that they will sell a minimum of 16 pots per day if the outside temperature exceeds 60o

F.  

From a sample, whose population is assumed to follow a Normal Distribution, taken for 30 days at 60 degrees or more an average of 15.2 pots per day were sold with a Standard Deviation of 0.6 pots. What is the Z value for this sales process?

Options:

A.  

0.67

B.  

1.13

C.  

1.33

D.  

2.66

Discussion 0
Question # 13

A Belt working in a supply chain environment has to make a decision to change suppliers of critical raw materials for a new product upgrade. The purchasing manager is depending on the Belt’s effort requiring that the average cost of an internal critical raw material component be less than or equal to $3,800 in order to stay within budget. Using a sample of 38 first article components, a Mean of the new product upgrade price of $3,680, and a Standard Deviation of $120 was estimated. In order to increase the Long Term Z value to 5, what is the maximum long term variation in pricing the Belt can accept for his upgraded critical raw material component?

Options:

A.  

$6

B.  

$12

C.  

$24

D.  

$48

Discussion 0
Question # 14

On a _________________ a Belt screens variables, or various inputs, to analyze their relative impact on the output of concern.

Options:

A.  

X-Y Matrix

B.  

Weighted Scale

C.  

Multi-Vari Chart

D.  

Poisson Chart

Discussion 0
Question # 15

One of the foundations of Lean Six Sigma is the concept that the output of a process (Y) is influenced by the process inputs (X’s) and is commonly shown as which formula?

Options:

A.  

Y = Z(X2)

B.  

Y = f(X3)

C.  

Y = f(Xn)

D.  

Y = g(X+ 1.5)

Discussion 0
Question # 16

For a Kanban to be successful which of these must occur?

Options:

A.  

Consistent cycle times

B.  

Fairly stable process demand of product or service

C.  

Low defect rate of incoming product or service

D.  

All of the above

Discussion 0
Question # 17

What is the Ppk of a process with a spread of 24 units, an average of 68, an upper limit of 82 and a lower limit of 54?

Options:

A.  

1.68

B.  

2.00

C.  

4.00

D.  

4.42

Discussion 0
Question # 18

Which of these items are not part of what is necessary for successful Kaizens?

Options:

A.  

Good lighting

B.  

Management support

C.  

Operator support

D.  

Analysis tools

Discussion 0
Question # 19

Accuracy can be assessed in several ways and a fairly accurate means of measurement is visual comparison.

Options:

A.  

True

B.  

False

Discussion 0
Question # 20

The English words used for the 5S’s are Sorting, Straightening, _____________ , __________ and Sustaining. (Note: There are 2 correct answers).

Options:

A.  

Shaping

B.  

Shining

C.  

Standardizing

D.  

Signing

Discussion 0

ICBB PDF

ICBB PDF (Printable)
$46.5
$154.99

ICBB Testing Engine

ICBB PDF (Printable)
$51
$169.99

ICBB PDF + Testing Engine

ICBB PDF (Printable)
$63.9
$212.99

Free Exams Sample Questions