Pre-Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Free IASSC Lean Six Sigma – Black Belt Practice Questions

Exams4sure Dumps

Exam style questions across every ICBB domain

Last Update 4 days ago
Total Questions : 300

Start with our free ICBB practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real Lean Six Sigma Black Belt exam. Each ICBB exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your IASSC weak domains, see where you're losing marks, and build a focused study plan in minutes.

ICBB PDF

ICBB PDF (Printable)
$54.25
$154.99

ICBB Testing Engine

ICBB PDF (Printable)
$59.5
$169.99

ICBB PDF + Testing Engine

ICBB PDF (Printable)
$74.55
$212.99
Question # 1

An operator is measuring the distance between two points. Which is most likely to be influenced by the operator?

Options:

A.  

Precision of the measurement

B.  

Accuracy of the measurement

C.  

Calibration of the instrument

D.  

All of these answers are correct

Discussion 0
Question # 2

If a Six Sigma project was to reduce repair station inventory and the team found the inventory was creeping up over time which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?

Options:

A.  

Review the Visual Factory to assure inventory in excess of desired visible

B.  

Improve the lighting to assure adequate visibility

C.  

Analyze data from supplier deliveries

D.  

Reword the standardized work instructions to use active verbs and not passive phrases

Discussion 0
Question # 3

If in an experiment all possible variable pairs sum to zero the design is Orthogonal.

Options:

A.  

True

B.  

False

Discussion 0
Question # 4

Use this data to calculate the Z score. Average o

F.  

65, Standard Deviation: 3, Upper Spec Limit: 72

Options:

A.  

0.27

B.  

1.5

C.  

2.33

D.  

4.12

Discussion 0
Question # 5

Which of these elements are not included in Implementation plans?

Options:

A.  

Work breakdown structure

B.  

Cost/Benefit ratios

C.  

Risk management plans

D.  

Planned audits of work completion

Discussion 0
Question # 6

Much of the Six Sigma methodology is used to identify and remove causes for _____________ .

Options:

A.  

Process Variation

B.  

Material Costs

C.  

Excess Inventory

D.  

Lost Sales

Discussion 0
Question # 7

For a Normal Distribution as samples size increases the Range in Mean and Standard Deviation decrease relative to the Mean and Standard Deviation of the population.

Options:

A.  

True

B.  

False

Discussion 0
Question # 8

Which of the items listed do not define what an X-Y Diagram is?

Options:

A.  

Created for every project

B.  

Based on team's collective opinions

C.  

Updated whenever a parameter is changed

D.  

Used to show each step in a process

E.  

A living document throughout project lifecycle

Discussion 0
Question # 9

With Measurement System Analysis we are concerned with two issues that impact the potential variability of the data. They are ____________ and Accuracy.

Options:

A.  

Spread

B.  

Reliability

C.  

Precision

D.  

Deflection

Discussion 0
Question # 10

The two types of data that can be used in Statistical Analysis are Attribute and Variable.

Options:

A.  

True

B.  

False

Discussion 0

Free Exams Sample Questions