Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

ISTQB-CTFL ISTQB Certified Tester Foundation Level (CTFL v4.0) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

ISTQB-CTFL Practice Questions

ISTQB Certified Tester Foundation Level (CTFL v4.0)

Last Update 1 day ago
Total Questions : 406

Dive into our fully updated and stable ISTQB-CTFL practice test platform, featuring all the latest Foundation Level exam questions added this week. Our preparation tool is more than just a ISTQB study aid; it's a strategic advantage.

Our free Foundation Level practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about ISTQB-CTFL. Use this test to pinpoint which areas you need to focus your study on.

ISTQB-CTFL PDF

ISTQB-CTFL PDF (Printable)
$43.75
$124.99

ISTQB-CTFL Testing Engine

ISTQB-CTFL PDF (Printable)
$50.75
$144.99

ISTQB-CTFL PDF + Testing Engine

ISTQB-CTFL PDF (Printable)
$63.7
$181.99
Question # 91

Which of the following types of bugs are more likely to be found by static testing then by dynamic testing?

Options:

A.  

Functions that take much longer time to complete than expected

B.  

Variables that were declared in the code without initialization

C.  

Crashes of the application

D.  

A sub-system that does not perform the intended functionality

Discussion 0
Question # 92

Which ONE of the following options identifies the perspectives through which a collective authorship process generates a shared vision of user stories?

Options:

A.  

Product owner, development, and testing

B.  

Business, architecture, and testing

C.  

Business, development, and testing

D.  

Business, development, and acceptance testing

Discussion 0
Question # 93

Atypical generic skill required for the role of tester is the ability to

Options:

A.  

Take on the role of developer to meet challenging project deadlines

B.  

Assume leadership aimed at imposing decisions on the rest of the team.

C.  

Use tools to make the execution of repetitive testing tasks more efficient.

D.  

Determine the corrective actions to get a test project on track in case of deviations from the test plan

Discussion 0
Question # 94

Which ONE of the following elements is TYPICALLY NOT part of a test progress report?

Options:

A.  

Obstacles and their workarounds

B.  

A detailed assessment of product quality

C.  

Test metrics to show the current status of the test process

D.  

New or changed risks

Discussion 0
Question # 95

Which of the following statements about statement coverage is TRUE?

Options:

A.  

Achieving 90% statement coverage ensures that 90% branch coverage is achieved.

B.  

Achieving 100% statement coverage ensures that no variable within the code has been used without being initialised.

C.  

Achieving 100% statement coverage ensures that 100% branch coverage is achieved

D.  

Achieving 80% statement coverage ensures that 80% of all executable statements within the code have been exercised.

Discussion 0
Question # 96

Consider the following list of possible benefits of retrospectives (A to D):

Options:

A.  

Team bonding and learning

B.  

Increased test effectiveness/efficiency

C.  

Improved quality of the test basis

D.  

Better cooperation between development and testing

... and the list of possible characteristics of retrospectives (1 to 4) that enable achieving these benefits:

The possibility of implementing suggestions for process improvement

The opportunity to raise problems and propose points for improvement

The regular review and optimization of the collaboration between team members

The possibility of addressing and solv

E.  

A1 - B4 - C3 - D2

F.  

A2 - B1 - C4 - D3

G.  

A4 - B3 - C2 - D1

Discussion 0
Question # 97

A Test Manager conducts risk assessment for a project. One of the identified risks is: The sub-contractor may fail to meet his commitment". If this risk materializes. it will lead to delay in completion of testing required for the current cycle.

Which of the following sentences correctly describes the risk?

Options:

A.  

It is a product risk since any risk associated with development timeline is a product risk.

B.  

It is no longer a risk for the Test Manager since an independent party (the sub-contractor) is now managing it

C.  

It is a object risk since successful completion of the object depends on successful and timely completion of the tests

D.  

It is a product risk since default on part of the sub-contractor may lead to delay in release of the product

Discussion 0
Question # 98

Which of the following statements is CORRECT?

Options:

A.  

Test cases are made up of input values, expected results and actual results developed to cover test objectives

B.  

Test cases describe items or events to test that are derived from the test basis during the test analysis activity

C.  

Test cases are sequences of actions for test execution specified during the test implementation activity

D.  

Test cases are derived during the test design activity to cover test objectives or test conditions

Discussion 0
Question # 99

Which of the following statements is correct?

Options:

A.  

Testing based on the structure of the software under test (SUT) is white-box testing whereas testing the input-output behaviour without prewritten test cases is experience based testing.

B.  

Testing the software under test (SUT) is possible only after implementation in white-box testing whereas testing the software even before implementation is possible in exploratory testing.

C.  

Testing the software under test (SUT) using knowledge of the tester is experience based testing whereas without pre-written test cases is using black-box testing techniques.

D.  

Testing the software under test (SUT) based on design is black-box testing whereas testing the input-output behaviour is experience based testing.

Discussion 0
Question # 100

For each test case to be executed, the following table specifies its dependencies and the required configuration of the test environment for running such test case:

Question # 100

Assume that C0NF1 is the initial configuration of the test environment Based on this assumption, which of the following is a test execution schedule that is compatible with the specified dependencies and allows minimising the number of switches between the different configurations of the test environment^

Options:

A.  

TC4, TC3, TC2, TC1, TC5.

B.  

TCI, TC5, TC4, TC3, TC2

C.  

TC4, TC3, TC2, TC5, TC1.

D.  

TC4, TC1, TC5, TC2, TC3

Discussion 0
Get ISTQB-CTFL dumps and pass your exam in 24 hours!

Free Exams Sample Questions