Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

NCS-Core Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

NCS-Core Practice Questions

Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8)

Last Update 1 day ago
Total Questions : 309

Dive into our fully updated and stable NCS-Core practice test platform, featuring all the latest NCS Professional exam questions added this week. Our preparation tool is more than just a Nutanix study aid; it's a strategic advantage.

Our free NCS Professional practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about NCS-Core. Use this test to pinpoint which areas you need to focus your study on.

NCS-Core PDF

NCS-Core PDF (Printable)
$43.75
$124.99

NCS-Core Testing Engine

NCS-Core PDF (Printable)
$50.75
$144.99

NCS-Core PDF + Testing Engine

NCS-Core PDF (Printable)
$63.7
$181.99
Question # 31

Refer to the exhibit. Question # 31

An administrator logged into Prism Element, notices the following in the home dashboard, and showing the exhibit.

Which action should the administrator take next?

Options:

A.  

Configure the fqdn for the hosts indicated

B.  

Troubleshoot the zookeeper server issue

C.  

Re-run NCC specifying data_resiliency_check

D.  

Check the hardware page for disk failures

Discussion 0
Question # 32

An administrator receives reports that VDI desktop performance in an 8-node Nutanix VDI environment is poor. Opening applications takes between 1 and 2 minutes.

When investigating the issue, the following conditions are found:

• Cluster memory utilization: 80%

• Cluster SSD utilization: 70%

• Average VM CPU Wait Time: 11%

• CVM CPU utilization: 75%

Which action should be taken to improve VDI performance?

Options:

A.  

Increase the amount of SSD storage in the cluster.

B.  

Add memory to the nodes in the cluster.

C.  

Add CPU resources to the cluster.

D.  

Increase the number of vCPU cores allocated to the CVM.

Discussion 0
Question # 33

A consultant finishes creating a new ESXi cluster. The consultant connects to the nodes via laptop and a personal flat switch. The host/CVM network is on VLAN 23. The customer has the native VLAN on the ToR switches set to 23.

The customer wants to use LACP. Before placing the nodes on the customer network, the consultant tags VLAN 23 for each host and CVM. The consultant connects the nodes to the customer network and finds that they are unreachable.

What is causing this issue?

Options:

A.  

The customer has LACP fallback enabled on switch ports.

B.  

The hosts have not been migrated to a vSphere Distributed Switch.

C.  

Under the vSwitch0 settings, the consultant did not select Route based on IP hash.

D.  

The host and CVM are incorrectly configured.

Discussion 0
Question # 34

A customer has a Nutanix cluster with 10Gb connectivity via switch fabric extenders. The administrator receives NCC health check errors of latency greater than 200ms.

Which action should the administrator take to resolve the NCC errors?

Options:

A.  

Replace the switch fabric extenders with 10G line rate switches

B.  

Upgrade NCC and increase the CVM memory by 4Gb

C.  

Add 2 additional 10G uplinks from the switch fabric extenders per node

D.  

Upgrade NCC and increase the vCPU of the CVM

Discussion 0
Question # 35

A consultant is onsite and needs to start their Foundation Virtual Machine (FVM) to image Nutanix hardware. The FVM fails to boot. The consultant decides to use a different Foundation method.

Assuming the nodes will discover, which Foundation type or configuration option should the consultant select?

Options:

A.  

Foundation VM

B.  

Use IPMI IPs

C.  

Use IPMI MACs

D.  

Foundation Applet

Discussion 0
Question # 36

The customer notices storage latency issues with their new Nutanix AHW cluster. The deployment includes the following components:

◦ 2 ToR switches

◦ 7 nodes

Which command should the consultant run to identify issues?

Options:

A.  

manage_ovs show bridges

B.  

manage_ovs show_interfaces

C.  

manage_ovs show_11dp

D.  

manage_ovs show_uplinks

Discussion 0
Question # 37

A consultant deploys a Nutanix cluster with AOS and ESXi. The cluster is managed by a vCenter server.

After installation, what should the consultant do to ensure the cluster will support network segmentation?

Options:

A.  

Connect both CVM eth0 and eth2 interfaces to vSwitchNutanix.

B.  

Manually assign an IP address to the CVM eth2 interface.

C.  

Connect both CVM eth0 and eth2 interfaces to the assigned portgroups.

D.  

Add another vSwitch to the cluster.

Discussion 0
Question # 38

A consultant deploys a four-node VMware ESXi cluster and vCenter server. An HA/DRS cluster is configured for all four nodes. The customer deploys five new VMs on the cluster.

During the knowledge Transfer, a network cable on one node is removed to demonstrate HA and migration of the VMs to another host. In the HA/DRS cluster settings, the VM Restart Priority for all CVMs is set to Disabled. The customer observes warnings that the CVM on the ejected host is no longer powered on.

Which ESXi HA/DRS cluster setting is missing?

Options:

A.  

Enable EVC for the cluster.

B.  

Disable VM Monitoring on all CVMs.

C.  

Disable Automation Level on all CVMs.

D.  

Enable Host Monitoring.

Discussion 0
Question # 39

A consultant is preparing to add new nodes into an existing cluster. The current cluster AOS version is 5.8. The new expansion node is currently running AOS 5.9 code. The cluster must continue to run at its current AOS version.

Which method can be used to successfully add the node?

Options:

A.  

Upgrade the cluster to 5.9 and add the node through Prism Element.

B.  

Use Prism Element to Expand the cluster and select the re-image option.

C.  

Use the CLI and enter cluster add-node node-serial=”node_serial”.

D.  

Use Prism Element, which will downgrade the node by default during the node add process.

Discussion 0
Question # 40

A consultant is setting up Prism Central to manage multiple Nutanix clusters. The customer requires til redundancy and tre aby to manage up to 12,500 VMs.

Which deployment option should the consultant use to meet the requirements?

Options:

A.  

Maximum CPU and memory allowed for the server hosting the Prism Central VM

B.  

Prism Central cluster mode

C.  

Prism Central Scale-out deployment

D.  

Large Prism Central VM with the maximum CPU and memory allowed

Discussion 0
Get NCS-Core dumps and pass your exam in 24 hours!

Free Exams Sample Questions