Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

NCS-Core Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

NCS-Core Practice Questions

Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8)

Last Update 1 day ago
Total Questions : 309

Dive into our fully updated and stable NCS-Core practice test platform, featuring all the latest NCS Professional exam questions added this week. Our preparation tool is more than just a Nutanix study aid; it's a strategic advantage.

Our free NCS Professional practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about NCS-Core. Use this test to pinpoint which areas you need to focus your study on.

NCS-Core PDF

NCS-Core PDF (Printable)
$43.75
$124.99

NCS-Core Testing Engine

NCS-Core PDF (Printable)
$50.75
$144.99

NCS-Core PDF + Testing Engine

NCS-Core PDF (Printable)
$63.7
$181.99
Question # 81

A consultant is working on an expansion project for a customer that has an existing 7-node RF2 cluster. The customer has purchased four more nodes to add to the cluster. All of the hardware is identical between the existing hardware and newly purchased hardware.

Currently, the 7-node cluster has the following utilization:

•CPU: 48%

•Memory: 66%

•Storage: 91%

During the kick-off call, the customer mentioned they'd like to reserve storage capacity on the cluster if a node were to fail in the future.

What's the safest and best way to implement this on the cluster?

Options:

A.  

Expand the cluster with the additional nodes and enable Reserve Rebuild Capacity.

B.  

Enable Reserve Rebuild Capacity and expand the cluster with the additional nodes.

C.  

Expand the cluster with the additional nodes and enable HA reservation.

D.  

Enable HA reservation and expand the cluster with the additional nodes.

Discussion 0
Question # 82

A consultant asks a customer to verify the ToR Switch data port configuration was done according to Nutanix best practices. The switch configuration must simplify future deployments and expansions.

Which two configuration actions will satisfy this requirement? (Choose two.)

Options:

A.  

Disable multicast and broadcast flood optimizations.

B.  

Configure the CVM and hypervisor host VLAN as the native.

C.  

Use a tagged VLAN for the CVM and hypervisor hosts.

D.  

Configure the connected switch ports as access.

Discussion 0
Question # 83

An administrator finds that home shares cannot be configured in a new Files 3.5 deployment. Why is this happening?

Options:

A.  

NFS default access is set to Read Only.

B.  

Multi-protocol access is not configured.

C.  

Access Based Enumeration is not enabled.

D.  

The system is deployed as a single FSVM.

Discussion 0
Question # 84

An organization is running a Nutanix Cluster based on AOS 5.10.x and VMware vSphere 6.7. Currently, the CVM network is segmented and Storage only nodes not present.

A new security project based on NSX is coming. VMware Distributed Virtual Switches are required. The administrator needs to prepare the environment for the new project.

Which step should the administrator use to initiate the project?

Options:

A.  

Enable Nutanix Flow at the Prism Central Level

B.  

Manually disable CVM network Segmentation

C.  

Convert storage only nodes into vSphere nodes

D.  

Enable Jumbo Frames to accommodate network frames

Discussion 0
Question # 85

Refer to the exhibit.

Question # 85

After performing ESXi to AHV conversion on a cluster, the alerts shown in the exhibit display on Prism. What should the administrator do to resolve this issue efficiently?

Options:

A.  

Remove the VMs. create a new Protection Domain, and add VMs to it

B.  

Remove VMs from the Protection Domain and add them back in.

C.  

Delete the Protection Domain, create a new Protection Domain, and add the VMs to it

D.  

Create a new Protection Domain and add the VMs to rt.

Discussion 0
Question # 86

A customer wants to expand an existing cluster with three additional nodes. After running the Foundation process on the new nodes, the customer realizes that the wrong IPs where used and the nodes are configured on a different network. The customer decides to create a new cluster instead.

Which method should be used to recreate the cluster?

Options:

A.  

Log into IPMI and use cluster create command to create the cluster.

B.  

Log into CVM and use cluster create command to create the cluster.

C.  

Log into Hypervisor and use cluster create command to create the cluster.

D.  

Foundation all nodes again and create the cluster.

Discussion 0
Question # 87

A consultant is setting up a new vSphere cluster. Customer requirements are as follows:

* VMs should automatically failover to another host if the host crashes

* Host CPU and Memory resources should be evenly balanced

* New VMs should be placed on the host with the most resources available

Which two settings should be turned on to meet the requirements? (Choose two.)

Options:

A.  

vShpere DRS

B.  

vSphere HA

C.  

vSphere vMotion

D.  

vSphere Power Management

Discussion 0
Question # 88

A customer needs to meet the following requirements for their business critical application:

* SQL Servers must be on specific hosts to lower licensing costs.

* Oracle RAC servers must be on separate hosts for licensing reasons

Which policy or policies should be implemented to meet these requirements?

Options:

A.  

Configure VM-VM anti-affinity policy.

B.  

Configure VM-VM affinity policy.

C.  

Configure both VM-Host and VM-VM affinity policy.

D.  

Configure VM-Host affinity policy.

Discussion 0
Question # 89

From a hypervisor, which IP address should the consultant use to connect to the locally tossed on?

Options:

A.  

192.168.5.254

B.  

172.16.19.2

C.  

10.100.5.5

D.  

192.168.1.254

Discussion 0
Question # 90

A customer has a G6 AHV cluster with 4x10GbE NICs on each node and the following configuration:

* Networking is set to default

* Only two NICs are connected

The customer receives the following critical message:

The NIC is disconnected from the switch, or the switchport is failing.

What should the consultant verify to resolve the issue?

Options:

A.  

The NICs are configured for active-backup.

B.  

The VLANs are configured correctly on the switch or tagged on the cluster.

C.  

The other two 10GbE connections are removed from the default bond.

D.  

The NICs are connected for balance-slb.

Discussion 0
Get NCS-Core dumps and pass your exam in 24 hours!

Free Exams Sample Questions