Free Certified Contract Manager Practice Questions

Exams4sure Dumps

Exam style questions across every CCM domain

Last Update 1 day ago
Total Questions : 140

Start with our free CCM practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real Contract Manager exam. Each CCM exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your FIDIC weak domains, see where you're losing marks, and build a focused study plan in minutes.

CCM PDF

CCM PDF (Printable)
$54.25
$154.99

CCM Testing Engine

CCM PDF (Printable)
$59.5
$169.99

CCM PDF + Testing Engine

CCM PDF (Printable)
$74.55
$212.99
Question # 21

Which one of the following is not a required document to be submitted by the Contractor if the Employer requests a proposal, prior to instructing a Variation, for FIDIC 2017 Yellow Book?

Options:

A.  

A description of the varied work.

B.  

A description of the proposed design.

C.  

Details of the resources and methods to be adopted by the Contractor.

D.  

A Programme for execution of the varied work.

Discussion 0
Question # 22

Under the FIDIC Red Book (edition 1999), as part of the Contractor submission of Statement, any amount to be deducted for retention, will be calculated by applying the percentage of retention stated in the Appendix to Tender to the total of: (two correct answers apply)

Choose all of the correct answers (multiple possibilities).

Options:

A.  

The estimated contract value of the Works executed.

B.  

Any amounts to be added and/or deducted for the advance payment and repayments under Sub-Clause 14.2.

C.  

Any amounts to be added and deducted for changes in legislation and changes in cost.

D.  

Any amounts to be added and deducted for Plant and Materials in accordance with Sub-Clause 14.5.

Discussion 0
Question # 23

Which one of the following is NOT considered a change made in the 2017 edition of the FIDIC Red, Yellow, and Silver Books?

Options:

A.  

The concentration on dispute avoidance, including an enhanced role for the Dispute Avoidance and Adjudication Board (DAAB) in this respect, and promoting cooperation between the parties during the project.

B.  

New procedures requiring the Contractor to prepare and implement a Quality Management System to show compliance with the Contract requirements.

C.  

A fair and balanced approach where risk is allocated to the Party that is best able to bear and control that risk.

D.  

New procedures requiring the Contractor to prepare and implement a Compliance Verification System to show that the design, materials, workmanship and certain other matters all comply.

Discussion 0
Question # 24

The details of all the matters that have been clarified and agreed between the Employer and tenderers during the tender stage are recorded by, for instance, a memorandum of understanding. The Employer may award the contract to the tenderer through a letter of formal acceptance, signed by the Employer. This process is in compliance with which one of the following Golden Principles (GP ' s)?

Options:

A.  

GP 3

B.  

GP 1

C.  

GP 2

D.  

GPA

Discussion 0
Question # 25

You are the Contract Manager of the Contractor in a building project. The Contract has been awarded to your firm, but the Engineer has not been selected. The Contract Agreement states that the Commencement Date shall be notified by the Engineer, which must be done within 14 days after the signing of the Contract Agreement. The Employer requested your firm to commence works on the 14th day after signing the Contract Agreement. Your director, Y, wants to wait with commencing the works until the Engineer has been selected or until the 42 days since the date your firm receives Letter of Acceptance. Is Y correct?

Options:

A.  

Yes

B.  

No

Discussion 0
Question # 26

Under the FIDIC Red Book (edition 1999): the Contractor submitted Final Statement in accordance with the Contract and the Contractor wants to correct it. Can the Contractor correct the Final Statement?

Options:

A.  

Yes

B.  

No

Discussion 0
Question # 27

In a construction project using the FIDIC Silver Book (edition 1999), if the Parties prefer the dispute board to be appointed on an " ad-hoc " basis instead of as a standing Dispute Avoidance and Adjudication Board (DAAB), what is it called? (1 correct answer applies)

Options:

A.  

Ad-hoc DAAB

B.  

DAB

C.  

Ad-hoc DB

D.  

Ad-hoc arbitration

Discussion 0
Question # 28

(Under the FIDIC Red, Yellow, and Silver Books (1999 editions), the Engineer/Employer shall be entitled to withhold from the release of retention money the estimated cost of any work which remains to be executed under Clause 11 (Defects Liability) in the Red Book or under Clause 12 (Tests after Completion) in the Yellow and Silver Books. Is this statement true or false?)

Options:

A.  

True

B.  

False

Discussion 0
Question # 29

Regarding the FIDIC Red Book (edition 1999): which two statements are true in respect of Building Information Modelling (BIM)?

Choose all of the correct answers (multiple possibilities).

Options:

A.  

General Conditions of Contract require the use of BIM.

B.  

BIM is one of the digital data technologies used in all aspects of project planning, investigation, design, construction and operation.

C.  

BIM is not related to the improvement of quality, accuracy, delivery times and cost savings.

D.  

For construction or building projects involving BIM, many Sub-Clauses of FIDIC Red Book (edition 2017) should be thoroughly reviewed when drafting the Particular Conditions.

Discussion 0
Question # 30

Regarding FIDIC Yellow and Silver Books (edition 1999) the Contractor has submitted its design proposal through the Contractor ' s Proposal. Which two of the following statements are true in this respect, after it has been submitted?

Choose all of the correct answers (multiple possibilities).

Options:

A.  

The Contractor is entitled to change the design by optimising the design, without approval of the Employer/Engineer.

B.  

The Contractor is not allowed to make any changes regarding the design to optimise the design, unless approved by the Engineer/Employer.

C.  

The Contractor may submit a proposal for Value Engineering.

D.  

The Contractor is not allowed to submit a proposal for Value Engineering, as any value engineering should already have taken place before submitting its design proposal.

Discussion 0