Free Construction Documents Technologist Practice Questions

Exams4sure Dumps

Exam style questions across every CDT domain

Last Update 11 hours ago
Total Questions : 120

Start with our free CDT practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real CDT Certification exam. Each CDT exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your Construction Specifications Institute weak domains, see where you're losing marks, and build a focused study plan in minutes.

CDT PDF

CDT PDF (Printable)
$46.5
$154.99

CDT Testing Engine

CDT PDF (Printable)
$51
$169.99

CDT PDF + Testing Engine

CDT PDF (Printable)
$63.9
$212.99
Question # 11

When do negotiations take the place of bidding?

Options:

A.  

When exact quantities of work cannot be determined.

B.  

When a publicly funded project's lowest bid exceeds the budget.

C.  

When the contractor has defaulted on insurance premiums.

D.  

When the owner and contractor have established a level of trust.

Discussion 0
Question # 12

What is a primary disadvantage in using the design-bid-build method?

Options:

A.  

It attracts too many bidders

B.  

All of the bids may exceed the owner's budget

C.  

It requires a higher level of bid document quality

D.  

It reduces the owner's control over the project during the construction phase

Discussion 0
Question # 13

Which of the following is a component of project design team coordination during the construction documents phase?

Options:

A.  

Duplication of important information by each discipline

B.  

Ensuring drawing note terminology is differentiated from specification terminology

C.  

Requiring the owner to hire a third-party to write the Division 01 specifications independently

D.  

Quality assurance tasks shared between design and consulting teams

Discussion 0
Question # 14

In the AIA A201 General Conditions of the Contract for Construction, whom is responsible for property insurance for a project?

Options:

A.  

Surety, on contractor's behalf.

B.  

Owner, unless assigned to contractor.

C.  

Owner and contractor, jointly.

D.  

Contractor, unless assigned to owner.

Discussion 0
Question # 15

Which of the following is a component of the contract documents?

Options:

A.  

Procurement requirements

B.  

Resource drawings

C.  

Shop drawings

D.  

Addenda

Discussion 0
Question # 16

What governs Division 01 specifications and general requirements?

Options:

A.  

Part I general

B.  

Divisions 02-49

C.  

The general conditions of the construction contract

D.  

The construction drawings

Discussion 0
Question # 17

The names of the project, owner, architect/engineer and consultants, and the general project data such as a location map are normally included in which of the following?

Options:

A.  

Sheet index

B.  

Cover sheet

C.  

General notes

D.  

Building code summary

Discussion 0
Question # 18

Which of the following is an example of preconstruction submittals?

Options:

A.  

Product data

B.  

Shop drawings

C.  

Schedule of values

D.  

Warranty documentations

Discussion 0
Question # 19

According to standard general conditions, which of the following is true about shop drawings?

Options:

A.  

They are contract documents.

B.  

They illustrate some portion of the work.

C.  

They are reviewed only by the architect/engineer.

D.  

They include performance charts, instructions, and brochures.

Discussion 0
Question # 20

During procurement activities, what is the process of notifying prospective or qualified bidders requesting proposals for a specific project or issuing an invitation to bid?

Options:

A.  

Solicitation

B.  

Instructions for Procurement

C.  

Instructions to Bidders

D.  

Request for Scope of Work

Discussion 0