New Year Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

CDT Construction Documents Technologist is now Stable and With Pass Result | Test Your Knowledge for Free

CDT Practice Questions

Construction Documents Technologist

Last Update 2 days ago
Total Questions : 120

Dive into our fully updated and stable CDT practice test platform, featuring all the latest CDT Certification exam questions added this week. Our preparation tool is more than just a Construction Specifications Institute study aid; it's a strategic advantage.

Our CDT Certification practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about CDT. Use this test to pinpoint which areas you need to focus your study on.

CDT PDF

CDT PDF (Printable)
$43.75
$124.99

CDT Testing Engine

CDT PDF (Printable)
$50.75
$144.99

CDT PDF + Testing Engine

CDT PDF (Printable)
$63.7
$181.99
Question # 1

When should a post-occupancy evaluation by the facility manager be performed?

Options:

A.  

At the end of the correction period

B.  

Three to six months after initial occupancy

C.  

Just before the end of the warranty period

D.  

One year after substantial completion

Discussion 0
Question # 2

In what project stage does the architect/engineer obtain and document the owner's decisions about specific products and systems?

Options:

A.  

Construction documentation

B.  

Design

C.  

Project conception

D.  

Programming

Discussion 0
Question # 3

What is MasterFormat® keyword index used for?

Options:

A.  

Identifying Level 4 sections

B.  

Identifying specification format

C.  

Locating subject titles and numbers

D.  

Specifying correct word usage

Discussion 0
Question # 4

What does the term “specifications” in the project manual apply to?

Options:

A.  

All written construction documents

B.  

All written and drawn construction documents

C.  

Qualitative requirements for products, materials, and workmanship

D.  

Quantitative requirements for products, materials, and workmanship

Discussion 0
Question # 5

With whom does the responsibility for maintaining record documents at the project site rest?

Options:

A.  

Contractor

B.  

Architect/engineer (A/E)'s consultant

C.  

A/E's project representative

D.  

Owner's project representative

Discussion 0
Question # 6

What must a specification section indicate?

Options:

A.  

The building trade that will perform the installation

B.  

The likely anticipated cost of the specified product

C.  

The interrelationships that exist between the work of this section and the entire project

D.  

How the owner will be compensated if the specified item is unavailable

Discussion 0
Question # 7

What is the primary purpose of MasterFormat®?

Options:

A.  

To create a master list of Level 3 and Level 4 section titles

B.  

To organize cost estimates by major project element

C.  

To establish an order of information within specification sections

D.  

To provide a uniform system for the organization of information in project manuals

Discussion 0
Question # 8

For a large transportation project, 53 borings were made and only one boring showed some contamination. Due to financial constraints, the owner is unable to provide additional funding to the design team for further investigation. Which of the following is the best course of action for the design team?

Options:

A.  

Withhold the information from the bid package because the full extent remains unknown. Ask bidders to provide a unit cost for remediation.

B.  

Provide a disclaimer on the contract documents about potential contaminants onsite and suggest the owner make the geotechnical report available to all bidders.

C.  

Insist the owner undertake additional investigation to determine the full extent prior to putting the project out for bid.

D.  

Proceed with design as is without any modifications since the results are statistically insignificant (i.e., well within expected deviations).

Discussion 0
Question # 9

If the contractor discovers that a part of the contract documents is in violation of the building code, what should the contractor do?

Options:

A.  

Notify the architect/engineer in writing

B.  

Proceed with the work in accordance with the contract documents

C.  

Request a variance from the building authority

D.  

Stop all work until the issue is resolved

Discussion 0
Question # 10

Which documents are commonly included as procurement documents?

Options:

A.  

Project record documents

B.  

Contract documents

C.  

Consensus documents

D.  

Bidding documents

Discussion 0
Get CDT dumps and pass your exam in 24 hours!

Free Exams Sample Questions