Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

HPE0-S59 HPE Compute Solutions is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

HPE0-S59 Practice Questions

HPE Compute Solutions

Last Update 2 days ago
Total Questions : 157

Dive into our fully updated and stable HPE0-S59 practice test platform, featuring all the latest HPE Technical Certification exam questions added this week. Our preparation tool is more than just a HP study aid; it's a strategic advantage.

Our free HPE Technical Certification practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about HPE0-S59. Use this test to pinpoint which areas you need to focus your study on.

HPE0-S59 PDF

HPE0-S59 PDF (Printable)
$43.75
$124.99

HPE0-S59 Testing Engine

HPE0-S59 PDF (Printable)
$50.75
$144.99

HPE0-S59 PDF + Testing Engine

HPE0-S59 PDF (Printable)
$63.7
$181.99
Question # 21

Your customer plans to deploy HPE Superdome Flex and configure two nPars, each based on two chassis Which components must be included in the proposal to meet the customer’s needs?

Options:

A.  

Rack Management Controller for nPar management

B.  

HPE Superdome Flex Grid licenses enabling connectivity between chassis

C.  

At least Tour HPE Persistent Memory DIMMs per nPar

D.  

One base chassis and three expansion chassis with licenses

Discussion 0
Question # 22

Your customer plans to setup an HPE Synergy solution based on SY480 Gen10 compute nodes with the following connectivity options - SAS connectivity installed in the first fabric - FC connectivity Installed In the second fabric - Ethernet connectivity installed in the third fabric.

Which statement regarding this setup is true?

Options:

A.  

Each compute node must have at least 768GB of memory installed

B.  

Interconnect modules that provide SAS connectivity should be moved to the third fabric

C.  

Each interconnect module in each fabric must be properly licensed in HPE OneView

D.  

Compute nodes must have a second CPU installed to access the second fabric.

Discussion 0
Question # 23

What role does Prometheus play in HPE AI Essentials?

Options:

A.  

It automates detecting drift in deployed models.

B.  

It cleans up idle applications to make room for new applications.

C.  

It gathers metrics and provides built-in alerting.

D.  

It authenticates and secures communications between workloads.

Discussion 0
Question # 24

Your customer changed the storage pool state from managed to discovered.

What is the impact of that change?

Options:

A.  

This storage pool can be deleted using HPE OneView interface.

B.  

All volumes from that pool will be removed from HPE OneView.

C.  

Volume provisioning will be disabled for that storage pool.

D.  

Storage pool parameters cannot be modified using HPE OneView.

Discussion 0
Question # 25

Your customer reports mat an external FC boot volume for Windows server is visible four times in the Disk Management 1 online and 3 offline.

What should you do to resolve this issue?

Options:

A.  

Disable deduplication for this volume at the array level

B.  

Remove the offline disks using array management tools

C.  

Install and configure MPIO on me Windows system

D.  

Remove the offline disks using Windows Disk Management

Discussion 0
Question # 26

Which statement about HPE Superdome nPars is true?

Options:

A.  

Chassis in the same nPar can have different CPU configuration

B.  

Rack Management Controller is required Tor nPar configuration

C.  

Chassis in the same nPar can have different memory configuration

D.  

nPars are supported only with 3rd Generation Intel Xeon Scalable Processors

Discussion 0
Question # 27

An administrator tries to open iLO interlace from HPE OneView Instead of being automatically logged in a login prompt displays

Where should you start the troubleshooting process?

Options:

A.  

At the iLO interface to verify whether the ILO Advanced license is properly applied

B.  

At HPE OneView Interface to verify whether the server is In the maintenance mode

C.  

At the iLO interface to verify whether the SSO certificate is removed from an iLO.

D.  

At HPE OneView Interface to verify whether the iLO processor is disabled

Discussion 0
Question # 28

Your customer has the following HPE Synergy setup:

- 15 HPE Synergy 12000 frames with 50Gb connectivity to each server port

- 2 HPE Composer 2 modules

- 15 HPE D3940 Storage Modules, one per frame

- 2 HPE 12Gb SAS switches per frame

Which statement about this setup is true?

Options:

A.  

The customer must create at least five logical enclosures for this setup.

B.  

To manage 15 frames, additional HPE Composers are required.

C.  

The customer can install up to 12 HPE Synergy 480 compute nodes per frame.

D.  

If properly cabled, any compute node can access any HPE D3490 storage module

Discussion 0
Question # 29

An admin is integrating HPE Compute Ops Management with Data Services Cloud Console to help automate connecting HPE servers to volumes hosted on HPE Alletra arrays. The admin is prompted to enter an API client ID and key.

Where should the admin obtain these?

Options:

A.  

From the API credentials created from an account with Data Services Read Write access

B.  

From API credentials created in an account with a Data Ops Manager Operator role

C.  

From the key created when activating servers for HPE Compute Ops Management

D.  

From the key created when the license for the HPE Alletra arrays was activated

Discussion 0
Question # 30

Click the drop-down menu that will allow you to define the location of the master modules within the logical interconnect group.

Question # 30

Options:

Discussion 0
Get HPE0-S59 dumps and pass your exam in 24 hours!

Free Exams Sample Questions