Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: merry71

Free BICSI Registered Communications Distribution Designer – RCDDv14 Practice Questions

Exams4sure Dumps

Exam style questions across every RCDDv14 domain

Last Update 2 days ago
Total Questions : 288

Start with our free RCDDv14 practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real RCDD Certification exam. Each RCDDv14 exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your BICSI weak domains, see where you're losing marks, and build a focused study plan in minutes.

RCDDv14 PDF

RCDDv14 PDF (Printable)
$46.5
$154.99

RCDDv14 Testing Engine

RCDDv14 PDF (Printable)
$51
$169.99

RCDDv14 PDF + Testing Engine

RCDDv14 PDF (Printable)
$63.9
$212.99
Question # 11

For a six story building (plus a basement) each of the six floors has a useable area of =3716 m2 (40.000 ft2) There are two riser systems, each serving halt of the useable area on each Moor What are the sleeves quantity and configuration required from fifth floor to sixth floor?

Options:

A.  

Two sleeves

B.  

Three sleeves

C.  

Four sleeves

D.  

Five sleeves

Discussion 0
Question # 12

During bidding the ICT distribution designer should review the bid responses for compliance and completeness. Afterwards, the designer should report the findings and recommendations to the

Options:

A.  

construction foreman

B.  

legal counsel

C.  

stakeholders

D.  

technical consultant

Discussion 0
Question # 13

In specifying labels and pruned tags that meet Underwriters Laboratories (UL) 969 Standard, marking and labeling systems are provided following the listed metrics. Which two of the following are REQUIRED for the UL standard? (Select two options.)

Options:

A.  

Adhesion test

B.  

Thickness test

C.  

Texture test

D.  

Durability test

E.  

Visual inspection

Discussion 0
Question # 14

Which of the following serves as a guiding principle for a program manager when preparing a program work breakdown structure?

Options:

A.  

Decompose the program work based upon available resources

B.  

Decompose the program to the work package level

C.  

Decompose the program lo the architecture baseline level

D.  

Decompose the program at a level sufficient to achieve control

Discussion 0
Question # 15

When preparing an upfront cost estimate, the ICT distribution designer MUST consider which two of the following fees? (Select two options.)

Options:

A.  

Taxes

B.  

Permits

C.  

Inspection

D.  

Licensing

E.  

Safety

Discussion 0
Question # 16

A program manager is assigned to a large cross-functional program trial includes five different technologies and multiple workstreams.

Some potential stakeholders have conflicting program expectations

What should the program manager do next/?

Options:

A.  

Conduct interviews with key stakeholders, and document the results in the program management plan

B.  

Update the stakeholder register to document stakeholders' positions relative to the program

C.  

Document stakeholder expectations in the program's risk register to determine their influence

D.  

Send out satisfaction surveys and document the results in the program's stakeholder engagement plan.

Discussion 0
Question # 17

An ICT distribution designer is designing a backbone cabling network that is specified for a campus network including several links approaching 2000 m (6562 It) and data rates of 100 Gb/s What optical fiber type(s) should be used?

Options:

A.  

OM3 fiber

B.  

OM4 fiber

C.  

Both OS1 and OS2 fiber

D.  

Both OS2 and OM3 fiber

Discussion 0
Question # 18

Which of the following transmitter light sources has a MINIMUM bandwidth of 4700 MHz/km (EMB) at 850 nm">

Options:

A.  

OM1 (62 50/125 multimode)

B.  

OM2 (50/125 multimode)

C.  

OM3 (50/125 laser optimized multimode)

D.  

OM4 (50/125 laser optimized multimode)

Discussion 0
Question # 19

During the design phase, drawings for ICT communications spaces should be reviewed for Standards compliance and

Options:

A.  

cost projections.

B OSHA specifications

B.  

client requirements

C.  

equipment availability

Discussion 0
Question # 20

After taking over a program, a program manager reviews the program's status and discovers that stakeholders do not know how the program is performing in relation to schedule and costs The program manager establishes earned value (EV) metrics and determines that the program has a budget of USS2.1 million, is three months into a nine-month timeline, and the planned value (PV) at the three-month point should be US$320,000. The program has spent US$350,000 and the EV is US$340,000

Based on this information, the program manager determines which of the following?

Options:

A.  

The schedule is US%30.000 under budget

B.  

The cost is US$20.0O0 under budget

C.  

The schedule is US$10.000 over budget

D.  

The cost is USS20.000 over budget

Discussion 0

Free Exams Sample Questions