Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

RCDDv14 BICSI Registered Communications Distribution Designer – RCDDv14 is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

RCDDv14 Practice Questions

BICSI Registered Communications Distribution Designer – RCDDv14

Last Update 2 days ago
Total Questions : 288

Dive into our fully updated and stable RCDDv14 practice test platform, featuring all the latest RCDD Certification exam questions added this week. Our preparation tool is more than just a BICSI study aid; it's a strategic advantage.

Our free RCDD Certification practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about RCDDv14. Use this test to pinpoint which areas you need to focus your study on.

RCDDv14 PDF

RCDDv14 PDF (Printable)
$43.75
$124.99

RCDDv14 Testing Engine

RCDDv14 PDF (Printable)
$50.75
$144.99

RCDDv14 PDF + Testing Engine

RCDDv14 PDF (Printable)
$63.7
$181.99
Question # 31

The options for termination an unshielded twisted pair cable for a video surveillance camera at the camera end are an 8-pin 8 conductor outlet and

Options:

A.  

8-pin 8-contact plug.

B.  

75 ohm balun

C.  

50 ohm balun

D.  

biscuit jack

E.  

shielded RJ-45 connector

Discussion 0
Question # 32

Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinally-induced voltages?

Options:

A.  

Isolating transformers

B.  

Neutralizing transformers

C.  

Mutual drainage reactors

D.  

Unit-type neutralizing transformers

E.  

2-winding neutralizing transformers

Discussion 0
Question # 33

In which of the following design phases does the ICT distribution designer perform coordination with stakeholders and other disciplines (e.g.. mechanical, architectural, electrical) to ensure that the design is constructive and that any conflicts are resolved early in the process?

Options:

A.  

Concept Design

B.  

Design Development (DD)

C.  

Schematic Design (SD)

D.  

Construction Document (CD)

Discussion 0
Question # 34

Close out documentation is initially discussed in which of the following meetings?

Options:

A.  

Prime Contractor and Subcontractor Meetings

B.  

Kickoff Meeting

C.  

Weekly Progress Meetings

D.  

Vendor Meeting

Discussion 0
Question # 35

Which two of the following types of metallic conduit REQUIRE threaded couplings? (Select two options.)

Options:

A.  

Electrical metallic tubing (EMT)

B.  

Aluminum metal conduit (AMC)

C.  

Flexible metal conduit (FMC)

D.  

Intermediate metal conduit (IMC)

E.  

Rigid metal conduit (RMC)

Discussion 0
Question # 36

When considering pathway types, the ICT distribution designer should consider the applicable MICE factors as defined in TIA 568 for structured cabling systems and components MICE 3 relates to

Options:

A.  

commercial environment

B.  

heavy industrial environment

C.  

medical environment

D.  

light industrial environment

Discussion 0
Question # 37

To create market advantage, a program sponsor requests accelerating the implementation of a new manufacturing process that is based on a recently improved system component. The program manager is concerned that the delivery of some program goals could be jeopardized.

What should the program manager do?

Options:

A.  

Document the concerns that program goals may be affected and present at the next program governance board review meeting for guidance and actions to be taken.

B.  

Advise the program sponsor that the program will continue and follow the program management plan, unless the change control board (CCB) has approved changes to the plan

C.  

Work with the project managers of the affected components to implement fast tracking and update the resource management plan accordingly

D.  

Evaluate critical success factors and key performance indicators (KPIs) to monitor benefits throughout the program's life cycle

Discussion 0
Question # 38

The program director of a four-year program, estimated to require 600.000 person-days effort, notices that team morale has decreased over the last three months. The program is at a critical stage with 70% completion through the last phase. A number of defects are found that result in teams working additional hours. The program director requests that the program management office (PMO) gather metrics to monitor the situation

Which of the following metrics should the PMO capture on a monthly basis?

Options:

A.  

Billable hours charged to the program, non-billable hours charged to the program, quantity of defects per full-time equivalent (FTE)

B.  

Absenteeism rate staff turnover quantity of defects, total hours worked average number of FTEs

C.  

Amount of hours spent on rework of software coding retesting, and on non-rework activities

D.  

Absenteeism rate staff turnover and leave liability

Discussion 0
Question # 39

A program experiences issues during execution. The stakeholders are concerned and the program manager feels pressure to act on these issues.

What tool should be used to trigger a planned response when receiving lower than expected results'?

Key performance indicators

B.  

Benefits management plan

C.  

Communications management plan

D.  

Ishikawa diagram

Options:

Discussion 0
Question # 40

Which two of the following roles do an ICT distribution designer use to ensure a timely and cost-effective telecommunications construction project? (Select two options.)

Options:

A.  

Discuss design concerns with inspectors. AHJs, and other stakeholders.

B.  

Verify that the overall physical security design complies with the owner expectations.

C.  

Assist in the resolution of unforeseen conditions, change orders RFIs and changes to the project's critical path.

D.  

Ensure the construction materials are stored properly and protected from theft.

E.  

Coordinate electrical supply so it is available in advance of the starting of contractor work.

Discussion 0
Get RCDDv14 dumps and pass your exam in 24 hours!

Free Exams Sample Questions