Pre-Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Free LEED Green Associate GAFRE Exam (LEED GA) Practice Questions

Exams4sure Dumps

Exam style questions across every LEED-Green-Associate domain

Last Update 3 days ago
Total Questions : 430

Start with our free LEED-Green-Associate practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real Leadership in Energy and Environmental Design (LEED) exam. Each LEED-Green-Associate exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your USGBC weak domains, see where you're losing marks, and build a focused study plan in minutes.

LEED-Green-Associate PDF

LEED-Green-Associate PDF (Printable)
$54.25
$154.99

LEED-Green-Associate Testing Engine

LEED-Green-Associate PDF (Printable)
$59.5
$169.99

LEED-Green-Associate PDF + Testing Engine

LEED-Green-Associate PDF (Printable)
$74.55
$212.99
Question # 31

The LEED credit weightings. in regard to the most important environmental impacts and human benefits, are based on impact categories defined and established by the

Options:

A.  

U.S. Green Building Council (USGBC)

B.  

U.S. Federal Government and Department of Energy (DOE)

C.  

Sheet Metal-and Air Conditioning Contractors National Association (SMACNA)

D.  

American Society Of Heating, Refrigeration and Air-conditioning Engineers (ASHRAE)

Discussion 0
Question # 32

During which stage of the conventional building process are each disciplined practitioner on project teams involved?

Options:

A.  

Discovery phase

B.  

post occupancy phase

C.  

End of project discovery phase

D.  

As required during design process

Discussion 0
Question # 33

The U.S. Green Building Council (USGBC) member logo may be displayed when

Options:

A.  

the organization is a member of USGBC

B.  

a professional is a member of the local USGBC chapter

C.  

a professional successfully passes the LEED AP exam

D.  

the project team successfully completes and certifies a project with the LEED Rating System

Discussion 0
Question # 34

At what phase should the charrette take place?

Options:

A.  

Post commissioning

B.  

During the design process

C.  

At the Beginning of the project

D.  

During the construction process

Discussion 0
Question # 35

All LEED rating systems include:

Options:

A.  

90 base points, plus four Innovation points and six Regional Priority points for a total of 100 points

B.  

110 base points, plus five Innovation points and two Regional Priority points for a total of 117 points

C.  

100 base points, plus six Innovation points and four Regional Priority points for a total of 110 points

D.  

110 base points, plus six Innovation points and four Regional Priority points for a total of 120 points

Discussion 0
Question # 36

Which of the following aspects of the indoor space does LEED Indoor Environmental Quality (EQ) aim to enhance?

Options:

A.  

Shape optimization

B.  

Thermal comfort

C.  

Energy efficiency

D.  

Structural load capacity

Discussion 0
Question # 37

Which of the following is an appropriate way to use non-potable water in a building?

Options:

A.  

Using captured stormwater for showering

B.  

Using wastewater from a sink for dishwashing

C.  

Flushing a toilet with wastewater from bathroom sinks

D.  

Incorporating air conditioner process water for washing clothes

Discussion 0
Question # 38

The main goal of energy efficiency is to

Options:

A.  

accomplish the same amount of work with less energy expended

B.  

offset fossil fuel usage, thereby lessening the amount of CO2

C.  

eliminate the use of CFCs entirely and use other more ozone-friendly refrigerants

D.  

increase the demand response capability of the building

Discussion 0
Question # 39

Which third party certification is recommended to use when specifying sustainable cleaning products?

Options:

A.  

Greenguard "

B.  

Green Seal ' ™ '

C.  

Green Label Plus*

D.  

Design for the Environment

Discussion 0
Question # 40

A project that does not meet a prerequisite in one credit category

Options:

A.  

does not qualify for certification

B.  

forfeits all points in the same credit category

C.  

must tile a CIR

D.  

may substitute a prerequisite from an alternative rating system

Discussion 0

Free Exams Sample Questions