Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

LEED-Green-Associate LEED Green Associate GAFRE Exam (LEED GA) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

LEED-Green-Associate Practice Questions

LEED Green Associate GAFRE Exam (LEED GA)

Last Update 2 days ago
Total Questions : 360

Dive into our fully updated and stable LEED-Green-Associate practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-Green-Associate. Use this test to pinpoint which areas you need to focus your study on.

LEED-Green-Associate PDF

LEED-Green-Associate PDF (Printable)
$43.75
$124.99

LEED-Green-Associate Testing Engine

LEED-Green-Associate PDF (Printable)
$50.75
$144.99

LEED-Green-Associate PDF + Testing Engine

LEED-Green-Associate PDF (Printable)
$63.7
$181.99
Question # 61

Which of the following methods provides maximum water efficiency for a building irrigation system?

Options:

A.  

Drip irrigation system

B.  

Flow irrigation system

C.  

Overhead spray sprinklers

D.  

Revolving circular sprinklers

Discussion 0
Question # 62

What green building objective does utilizing high efficiency water fixtures achieve?

Options:

A.  

Preventing stormwater pollution

B.  

Conserving the Earth's potable water supply

C.  

Providing adequate watering for indigenous plants

D.  

Utilizing more unused graywater for flushing water closets

Discussion 0
Question # 63

Which of the following strategies will help to improve indoor air quality during construction?

Options:

A.  

Locate air intakes in the building loading dock area

B.  

Designate a smoking room in the building

C.  

Select low Volatile Organic Compound (VOC) paints, adhesives. sealants and furniture

D.  

Reduce outdoor air flow

Discussion 0
Question # 64

The use of native plant species, captured rainwater and evapotranspiration controllers are all strategies that contribute to

Options:

A.  

process water reduction

B.  

stormwater runoff control

C.  

outdoor water use reduction

D.  

reducing graywater demand

Discussion 0
Question # 65

Where could a project be located to purchase Renewable Energy Certificates (RECs)?

Options:

A.  

Almost anywhere

B.  

Where utilities are deregulated

C.  

Only with cooperating local utilities or power markets

D.  

Near hydroelectric dams, wind farms or other sources of renewable energy

Discussion 0
Question # 66

Which action promotes pedestrian access to a project site?

Options:

A.  

Placing a low speed limit in the parking lot around the building

B.  

Providing shuttle access between the project site and a local transit center

C.  

Designating parking spaces closest to the building for exclusive use by carpooling vehicles

D.  

Utilizing an existing community nature path connecting the building to surrounding buildings

Discussion 0
Question # 67

Which of the following includes impacts quantified by life-cycle costing (CCC)?

Options:

A.  

Energy use reduction

B.  

Acidification reduction

C.  

Eutrophication potential

D.  

Global warming potential

Discussion 0
Question # 68

Which of the following is a strategy that a design team should consider In order to decrease the Impact of a new construction project?

Options:

A.  

Maximize views of the existing wetland

B.  

Select native plants to provide habitat for local fauna

C.  

Locate the project in an existing office park with ample parking

D.  

Increase the project's footprint to maximize roof space for a solar array

Discussion 0
Question # 69

The intent of the location valuation factor is to incentivize the purchase of products that

Options:

A.  

reduce transportation emissions

B.  

support the local economy and workers

C.  

emit no Volatile Organic Compounds (VOCs)

D.  

comply With responsible extraction regulations

Discussion 0
Question # 70

In the context of a LEED project, the charrette is a

Options:

A.  

set of preliminary design specifications submitted by project team members

B.  

forum at which the final schematic of the project is presented to the community

C.  

procedure through which experts are selected to participate on the project team